JIS Sleeve Coupler
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
JIS Type Pressed Scaffolding Coupler for Pipe Connecting
. High Quality
. Fast Delivery
. Competitive Price
. Excellent Package
. Good Service
Weight | 980g |
Certification | ISO9001, EN74,SGS,BS1139 |
Electroplating | Electric Galvanized, Hot Dip Galvanized |
Payment | T/T, D/P, LC at Sight |
Package | Box and Wooden pallet |
Port | Taizhou, Shanghai |
- Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
- 1 scaffolding steel pipe material Q195, Q215 or Q235, 2 scaffolding steel pipe specifications of phi, phi, phi, phi, phi, phi, 3.25, phi, phi, phi, 2.752, 5, 3 scaffolding steel pipe length of 1-6 meters, half a meter specifications; according to customer requirements specifications4 scaffolding steel pipe standard SY/T5768-9, 5, GB/T3091-200
- Q:Erection of steel scaffolding tools and safety supplies
- Safety belt, safety helmet, gloves, rope, steel shear, ribbon sling (sling)
- Q:Can anybody provide me the formula for calculating scaffold volume on circular tank?
- Step 1. Measure the diameter of the tank (D). Step 2. Measure the height (h) for a vertical tank or length (l) of a horizontal tank. Step 3. Calculate the cross-sectional area of the tank using Equation 1. Equation 1: Cross-sectional Area, A = 3.14 x D x D/4 Step 4. Calculate the volume of the tank in cubic feet using Equation 2. Equation 2: Volume in cubic feet = A x h [for a vertical tank] Volume in cubic feet = A x l [for a horizontal tank] Step 5. Convert the volume of the tank from cubic feet to gallons using Equation 3. Equation 3: Volume in gallons = (Volume in cubic feet) x 7.48
- Q:along with this question, -what does she think about during this time period?-how does she apprear on the scaffold? -who does she see and how does she feel?THANKS!!=]
- Read the book and find out! I think she's up on the scaffold sometime in spring, but as I said, READ it and make sure.
- Q:I got my scaffolding approximately about 7 weeks ago maybe just a lil over, I want to know when is a good time to change the bar/take it out, I am keeping up with cleaning it 2 to 3 times a day with the saline solution, even though, it only requires to be cleaned 1-2 times a day to be fair though
- Scaffold piercings, being two cartilage piercings connected by a single bar, take six months for initial healing and twelve months for a fully healed tunnel of flesh to be formed. Don't change it yet, I assure you, you will regret it. Just be patient, keep on cleaning, cleaning, salt-soaking.
- Q:I really want to get one done and I would like it if someone could tell me how badly does it really hurt? During and after. I know everybody has different pain thresholds but on average? I'm just nervous to get it done but really want another piercing on my ears. I have my lobes and a cartilage on my right ear. How easy is it to clean? rate in numbers as well as a description. Thanks.
- well when i got mine it really didn't hurt tht muchh the second hole hurt the most but only because i was thinking about it. andd it hurts more afterwards especially during the first few dayss if you hit it by accidentt. and cleaning it honestly is a pain, its annoyinggg but you have to do it, during the first few weeks clean it 3 times daily then you can start going down to two times daily. and do sea salt soaks and stufff anddd the actual piercing for me was about a 4 or a 5 (10 being painfulest) and the healing has been about a 5 or a 6 but i just got it done last weeek, if you really want it then get it,the pain is only temporaryy buttt its deff worth it in the end :)
- Q:would a scaffold piercing look gay on a guy?
- No it would probably look good, but it kind of depends what you look like before you get it. If you want it go for it.
- Q:Latch type disc scaffolding accessories is a national patent product
- Said chrysanthemum disc scaffolding system, disc scaffolding system, wheel type scaffolding system, buckle scaffold, layher frame
- Q:Exterior wall scaffold construction plan?
- Foundation treatment:Pit backfill every 30cm thick layer by ramming into vibration compaction, compaction by cutting ring sampling test, the bearing capacity of Rammed Soil reached 60270KN/m2. And then in the compacted soil C15 cast in situ concrete hardening, thickness 100mm. The foundation of all scaffolds must be smooth. On the basis of the base plate, the thickness of not less than 50mm, the layout must be smooth, shall not be suspended; and in the periphery of the scaffolding outside the vertical rod 50cm set up a shallow ditch drainage.
- Q:Scaffolding installation and precautions?
- Began to set up the column, should be set up every 6 span of a throw support, even after the installation of the wall is stable, can be removed according to the circumstances.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
JIS Sleeve Coupler
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords