Hydraulic Concrete Placing Boom PB15B3R hot sale
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 300 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Detailed Description
Efficient,Economical and easy to operate
1.Two arms desigh, manual operation and 360°ratation.
2.Reduce the labor intensity and improve the construction quality.
3.The distributor can be conveniently moved to different sites owing to its small volume.
Be widely used,Concrete spider is suitable for those situations which the work of fixed placing boom and pump are limited, such as:
1.When the concrete pump cannot completely place concrete on the large areas or construction sites.
2.When use hydraulic climbing placing boom takes too much time and energy to place concrete for the floor and pillars.
3.For the project of producing the precast units in a specially requested design
1.Training Solutions – we develop our people through high impact training. We increase the connective intelligence potential of individuals and teams through practical, solution-focused programs in areas such as innovation, team collaboration, management development, strategic thinking and decision making.
2.Coaching Solutions - we increase leadership potential with performance coaching. We increase the connective intelligence potential of our managers and key contributors, assessing and developing both their cognitive and emotional intelligence's (capabilities) as the latest research, and practical experience, indicates that both are needed to drive sustained performance.
3.Reward Solutions – We reward our deserving people based on performance (we ensure equitable treatment of employees because appraisals are based on result of performance) by providing the necessary incentives. Its components can be a combination of bonuses, a range of appropriate benefits such as International trips, commissions and Stock option incentive plan for management & senior workers.
Mission & Vision: The following Core Values fulfillment is our objective.
1.Integrity and Professionalism.
2.Target and Action Oriented.
3.Service Quality & Customer Oriented.
4.Pro- Active to change.
Model | PB15B3R |
Radius of placing boom | 15m |
Slewing range | 360° |
Boom articulation | 0° |
Delivery pipe dimension | 125mm |
mode of drive | Manual |
Weight (without counterweight) | 1.45T |
Weight (with counterweight) | 2.95T |
- Q:How to install and use the distributor?
- In the process of assembling and installing concrete distributing machines, the constructors must wear safety belts when they work at high altitude, and the seat belts must be hung where they can be stressed. Construction cable must be overhead or buried in the ground, not flat and put
- Q:What are the monthly inspection items of the movable concrete spreader?
- Check whether the rotary limiter works properly and check the coupling of the motor
- Q:How to fit the cloth rod of the distributor?
- Place the distributing rod and its counterweight, and request that the center of the cloth pole must be 200~300mm overhead. The sleepers or wooden side will be set under the feet to see whether the cloth pole body is straight
- Q:What is the working principle of the distributor?
- The distributing machine is arranged at the center of each casting position, and meets the requirement of pouring position through the bent pipe and the hose
- Q:What do concrete pumps and fabrics mean?
- Cloth machine, cloth form and automobile pump is similar, it is to use conveyor belt in the state without pressure to transport concrete, cloth machine is relatively heavy, slow walking, and the delivery of concrete material falls easily aggregate segregation
- Q:What are the acceptance items of concrete spreader?
- The installation site should be carried out in advance according to the requirements of construction site should be collected, must be stable and firm installation, foot pad.
- Q:How to maintain the concrete spreader?
- The spiral blade edge of the cloth is inlaid with welded alloy wear-resistant blocks, and the spiral shaft can be operated normally for 10 months. The spiral shaft is designed to be easy to assemble and disassemble
- Q:what's the difference between the fabric pump and boom pump?
- The pump is provided with an automobile chassis, and the distributor is not provided. The distributor is usually installed in a floor or an elevator shaft
- Q:What are the weekly inspection items for concrete spreader?
- Check the lubrication situation is good, and timely replenishment of lubricating oil
- Q:What is the concrete distributor?
- Hydraulic cloth machine, manual cloth machine (also divided into 12 meters, 15 meters, 18 meters three kinds)
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Hydraulic Concrete Placing Boom PB15B3R hot sale
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 300 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords