high quality steel iron precision casting scaffold fitting scaffold right angle coupler
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Model Number: | AC2 |
Type:: | Scaffolding Parts,US ,British ,Germany | Material:: | Q235 | ||
Scaffolding Part Type:: | Scaffolding Couplers | Surface:: | electric galvanized or hot dipped galvan | zed Certification:: | BS1139 (1982 & 1991), EN74 class A & B |
Dimension:: | Dimension: 48.6x48.6mm |
Packaging & Delivery
Packaging Detail: | Cartons or as your request |
Delivery Detail: | 5-10days |
Specifications
Right Angle Couplers
Material:Q235
Dimension:48.6*48.6mm
Surface Finished:Painted,Galvanized
Certificate:ISO9001
Product Description
Specifications
Certification: BS1139 (1982 & 1991), EN74 class A & B
Used for bracing, these couplers allow tubes to be connected at any angle.
Features:
1) Dimensions: 48.3 x 48.3mm (1 29 / 32" x 1 29 / 32")
2) Material: drop forged carbon steel
3) With T-bolt
4)
Nut sizes: | ||||
17mm | 19mm | 21mm | 22mm | 23mm |
5) Styles: standard, flanged
6) Standards: BS1139 (1982 & 1991), EN74 class A & B
Item | casting parts |
Material | carbon/alloy steel/ductile iron/grey iron/etc |
Process | sand mould casting, gravity casting, low-pressure die casting, high-pressure die casting. |
Surface finish process | polishing, sand blasting, heat treatment, painting, powder coating, anodizing, electroplating, mirror polishing. |
Standard | ASTM/ANSI,DIN,ISO,GB,JIS,BS; |
Certificate | ISO9001/BV |
Specification drawing | Pro/E, Auto CAD, Solidwork, CAXA UG, CAD/CAM/CAE. |
Weight | 0.5-50kg/ as your requirement |
Note |
OEM service is available |
Advantage | good quality and strict delivery time |
MOQ | 1000pcs |
Package | wooden pallets or steel pallets, or as your request |
Payment Terms | TT,L/C, we can contact in detail |
Delivery Time | 20-30days |
- Q: looking for a scaffolding job in dubai can anyone help?
- Hi okorder , we are Dubai based scaffolding contractor.
- Q: What's an antonym for the word scaffold?
- I don't think there is one. 'Scaffold' is a noun but, with the exception of gender nouns (egs boy/girl; man/woman) it's verbs, adjectives, adverbs and prepositions that can have true opposites.
- Q: What are the chances of cracking the tile? What can I do to avoid cracking the tile?This will be 3 levels of scaffolding on 6 inch wheels.
- unless you are majorly manhandling the scaffolding, such as slamming it around and jerking it into place, etc, you won't crack the tiles (this is being said with the hopes that the flooring was installed correctly.) i would throw a layer or two of bedsheets or a good heavy drop cloth over the tiled floor just to protect the tile from being chipped or scratched. be careful going up so high. good luck!
- Q: Im hoping to get an industrial/scaffold piercing done at the very beginning of the summer holidays.Is it possible that they can be pierced with 2 separate pieces of jewellery rather than one bar.Also would it be healed in time to take it out once the holidays are over (6 weeks)??Please help??!?Thanks x
- nope! Cartilage piercings take about a year to fully heal up. Yes, you can get 2 separate bars, but let the piercer know thats what you want. Industrials are VERY hard to take care of. Make sure to listen to EVERYTHING the piercer says!
- Q: Calculation method of complete scaffold
- Poetry cannot walk unless it is on the edge of the abyssNo matter where we are, there is always the earth, that is the eternal meeting;
- Q: A scaffold is constructed by placing two supports under a 13 ft, 9 in (a) board weighing 84 lbs. The supports are each 2 ft, 8 in (b) from their respective ends. Two painters stand on the board; one weighs 158 lbs and stands 4 ft, 11 in (c) from the left end of the board. Where must the 222 lbs painter stand so that each support carries the same weight? (express your distance in feet from the right end of the board (d).)please help!! thanks(:
- Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
- Q: Can you do the outer scaffolding?
- The safety net is fixed on the side of the outer vertical rod of the scaffold. (2) the 16# wire safety net, strict and smooth. (3) the outer side of the scaffold shall be provided with a 1.2m high protective railing and a 30cm high skirting bar, and the top row protective railing shall be not less than 2, with a height of 0.6m and 1.2m.
- Q: I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
- Scaffolding steel pipe1, set up a high-level scaffolding, the various materials used must meet the quality requirements.2, the foundation must be firm, before the erection of the calculation, to meet the load requirements, and according to the construction code set up, do drainage measures.3, scaffolding erection technical requirements shall comply with the relevant provisions of the code.4, we must attach great importance to a variety of structural measures: scissors, pull nodes, etc. should be set according to requirements.5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.
- Q: Cantilever scaffold technical disclosure Find satisfaction free speed!!!
- Fastener:(1) new fasteners shall have production licenses, product quality certificates and inspection reports. Old fasteners should be used before the quality inspection, there are cracks, deformation is strictly prohibited, the use of bolts must be replaced sliding silk. New and old fasteners should be anti rust treatment. Corrosion of fasteners and damaged fasteners timely repair replacement bolts. Bolt oil support easy to use.(2) the fastener and the joint surface of the steel pipe should be in good contact with the steel pipe, and the minimum distance of the opening should be less than 5mm. The fastener in the bolt was 65N.m, shall not be damaged.
- Q: improper design of formwork and scaffolding, not adequate braces and supports, improper handling, corrosion of material is several factor of formwork and scaffolding failure. it is estimated that more than 3000 accidents involving falls from scaffolds and 30 fatalities
- Well, it seems you came close to answering your question. But are falls a scaffolding failure? For me failure means that the scaffolding sagged or fell - which may result in injuries with or without falling as when the failing scaffolding falls on a worker on the ground. I would think that major causes of failure as I defined it would be inadequate or failed attachments to the building and failure of ground support for the structure. Question needs to be improved to define what you need in answer and avoid conflict between question and detail.
Send your message to us
high quality steel iron precision casting scaffold fitting scaffold right angle coupler
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords