• High quality and low price Diesel Forklift CPC15/20 System 1
  • High quality and low price Diesel Forklift CPC15/20 System 2
High quality and low price Diesel Forklift CPC15/20

High quality and low price Diesel Forklift CPC15/20

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Diesel Forklift

CPC15/CPC20

With heating cabinet to meet the special needs of customers

1KG=2.2LB 1INCH=25.4MM

Identification1ModelunitCPC15CPC20
2Power TypeDiesel
3Rated load Qkg/lb1500/33002000/4400
4Load center distance + Cmm/in500/19.7
5Lifting heightmm/in3000/118
6Free lifting heightmm/in135/5.3110/4.3
7Fork size s * e * Lmm/in1070x100x40/42x4x1.6
8Gantry tilt before/ afterdeg6/12
9Turning radiusmm/in1950/76.82170/85.4
10Drive shaft center distance (under the wheelbase)mm/in105/4.1120/4.7
11Center distance of the ground (the central body) mm/in170/6.7115/4.5
Performance12Minimum width of right-angle stackingmm/in2090/82.32100/82.7
13Maximum speed(empty)km/h17.319.5
14Maximum climbing ability of full load%20
Size15The biggest lifting speed (full load)mm/s400550
16Total length with forksmm/in3310/130.33528/138.9
17Total length without forksmm/in2340/92.12458/96.8
18Total widthmm/in1110/43.71155/45.5
Body19Minimum height with mast downmm/in1995/78.52060/81.1
20the overall lifting height mm/in3990/1574030/158.7
21Front tire7.00-9-10PR7.00-12-12PR
22Rear tire5.00-8-8PR6.00-9-10PR
Engine23Wheelbasemm/in1350/53.11600/63
24Tires faces (Front tires )mm/in890/35970/38.2
25Rear faces (Rear tires )mm/in900/35.4970/38.2
26Weightkg/lb2650/58403320/7320
27Battery (Voltage / Type)12V/6-QA-100a12V/6-QA-100a
28ModelYD480G-9490BPG
29Number of cylinders bore *stroke (mm * mm)mm/in4-80*90/3.1*3.54-90*105/3.5*4.1
30Rated outputKW2537
31Rated speedr/min26002650
32Rated torqueN.m/r.p.m101.5/1350148/1800~2000
33Calibration of fuel consumptiong/kW.h250.2285.6
Transmission34Exhaust volumecc2.67
35Stylemachinemachine
36Place of originChinaChina
37Stall (before / after)2/22/2

 

Q: I am thin and have this layer of fat over my abs that I want to get rid of. In order for your answe to be believable, please tell me your routine methods that you do thru out the work out time. I know Cardio will lose it, but I just want to know how long am I suppose to do it and how many days should I do it. Also, name me the foods I need to avoid and the ones I need to consume and how much of a portion should I eat (Im 5'11 weighing 171). My arms and legs are in pretty good shape, but the belly has got to go! My abs will be visible with your help
The okorder /
Q: One flew over the cuckoos nest pg 41-77Characterize Pete Bancini with regards to the theme of Machinery. Please give examplesThanks!
Bancini worked on the rail road for a long time he sees things in the world like a machine.
Q: well my work has a huge 10,000 pound piece of machinery...and i know people can donate cars and boats and what not as a tax write off so, where could we donate this big hunk of machinery?
Call a metal recycling place. They would be happy to come get it and turn it into scrap. They would even pay you for it.
Q: I'm thinking about making something out of wood but I dont have any machinery to do it, all I have Is a saw and a couple knives but that's it. Any ideas?
Camp Fire!
Q: What are the total cost of the project?
Indirect costs (including fees and charges. Engineering engineering scale of fees. The social security fee. The housing provident fund. The dangerous work accident insurance) and enterprise management fees (management personnel wages. Office expenses. Travel and transportation fees. Fixed asset use fee. Instrument use fee labor insurance premium. The employee education expenses. Union funds. Property insurance. Financial expenses. Other taxes.)
Q: Registration process of a construction machinery maintenance plant in Tangshan? What information should be prepared and which departments should be handled?
Nuclear Name: to Industrial and Commercial Bureau to obtain an "enterprise (famous) name pre approved application form", fill in your company ready to take the name of the Internet by Industrial and Commercial Bureau (Industrial and Commercial Bureau intranet search) if available, if not the same, you can use this name, they issued an "enterprise (name) the name of the pre-approval notice". The fee for this step is 30 yuan.
Q: if the company introduces new machinery and reduces its direct labour, how is the break even point affected?
It will be affected relative to the cost difference between the machine and labor . If the cost of the machine is more than labour in the short term it will be higher if not then lower . You should be able to calculate a realistic break even point for when the machine is paid off , obviously you need to take into account running costs and maintenance and whether or not they will exceed your existing labour costs . Cheers
Q: What type of machinery is this?
It looks like it might be a type of clam-shell bucket for use with an excavator, but I've never seen one that long.
Q: Does anybody have a product to make tires puncture free, specially ag machinery tires?
try okorder or just call your local equipment dealer You local John Deere dealer will always be able to help
Q: i need this answer its urgent
you can't do that job by using any air craft. please use a space craft.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords