• FZQ1650 Tower Crane System 1
  • FZQ1650 Tower Crane System 2
  • FZQ1650 Tower Crane System 3
FZQ1650 Tower Crane

FZQ1650 Tower Crane

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

FZQ series anchorage luffing-jib tower crane is a sort of large crane applicable for thermal power, hydropower, nuclear power, petroleum, chemical industry, metallurgy, high-rise steel structure and other erection of large-scale construction projects, especially suitable for tower boiler lifting in power station and construction of tall buildings at narrow site.
To meet the requirements in different operating conditions, FZQ series tower crane has been successfully developed such as FZQ1380, FZQ1650, FZQ2200, FZQ2520. This series of products adopt advanced production technology and design concept featuring in high technology content and excellent performance, which keeps pace with international advanced level, and has gained tens of China national patent technology.
The pedestal of this series crane adopts box-type structure resulting in non-concrete foundation, which reduces the foundation treatment cost.
This series tower crane adopts advanced anchoring method and structure that the anchoring location can be flexibly adjusted to a wide application range.
The connection of tower section adopts “HALF” quick-type structure, which simplifies assemble and disassemble process. The standard section and anchoring section can be interchangeable owing to the same geometry dimension.
Boom system is manufactured of fine-grained ultra-high strength alloy steel pipe with significant reduction in weight; the mast is made of high-strength low-alloy steel pipe that provides the crane with compact structure and strong lifting capacity.

The hoisting mechanism adopts international renowned brand gearbox and Lebus drum, which guarantees its good performance; the electric control introduces full frequency conversion to realize fast, stable and non-impact operation.

The crane is equipped with complete safeguard devices to realize multi-protection for safe operation.

Q: Method for operating tower crane
In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
Q: What is YOUR take on Louis Crane's idea of meduso-anthropic principle?
Well Im not into quantum physics much these days, but in his book Life and Light Lee Smolin proposes that if the quantum theory of gravity has two special features the universe would fine tune itself! If we perturb a Kerr-Newmann black hole so that the new universe will really form on the other side, and that the constants of nature might fluctuate in such a process so that the new universe would have sightly different physics than our own. Its well over my head at this stage; cause Im just an N.Y.U.K. graduate! NYUK NYUK NYUK Anyone wants to read up on it can go to the link below.
Q: ...the crate weighs 4000N when resting on the ground. Find the followinga)The tension in the cable necessary to do thisb)The work done by the cablec)The work done by gravityd)The total work done by the systeme)The final velocity of the crate
Ghee is clarified butter! The rest sounds like homework!
Q: Hi guys, I am doing a project for school on blue cranes, and i can't find much on what their diet is like? Does anyone know?
Blue cranes? You mean great blue heron. They eat fish, frogs, snakes, anything smallish that lives in shallow waters.
Q: My boyfriend just spotted a baby crane by a tree. It looks like it fell out. A dog was sniffing around so he took the baby crane to his place. I'm trying to find information about cranes, but I find nothing since they're not usually pets unless they're some rare breed. I would really appreciate any advice or input on how to care for the crane until it can fly. Also, how old are cranes when they fly?
fish is their diet,so feeding will be fish don't put milk it is danger to them work at a zoo.trust me. a box is fine, so is the bath tub,the bath tub is best so you can put a small amount of water in it. that way it will get used to the water in the wild.Little human contact,and maby a walk outside each day so it will get the feel of being outside.
Q: I have to create a crane to support a dead load for my Engineering Technology class. It can be made out of only 1/8 inch balsa wood and wood glue, and is going to be graded by the ration of weight held to structure weight.Could anybody give me some suggestions as to how to go about designing this thing? I already know most of the basics, but if anybody could give me some specific tips, they would be greatly appreciated.Thanks!
Not enough information because a crane can be many shapes and have various forms of anchoring or counterbalancing the load. If you are not allowed to anchor to a base and can't use weight to counter the load (if all balsa) then you have to create legs and lift the load between them - Basically the design will need to be triangles in truss to take the compression and prevent twisting and a long upper piece in tension to act like the cable you don't have. I would make two legs that are each 3 sided trusses that meet at the top and have a single rod across the bottom to keep them from spreading. Then I would make a longish beam with flat triangles for stiffness and use a few uprights to position the tension rod. Hang the weight on one end and push down on the other so it pivots on the short legs.
Q: What does a track type tower crane look like? In that case, use?
The rail type multi characteristic tower crane consists of track, door frame, main arm, auxiliary arm, hook and so on. Its features are: A, crane through the door frame (2), supported on a track (1); B, the door frame (2) is provided with a rotary bearing (3); C (3) is arranged on the rotary supporting all kinds of machinery and equipment (4), and balance weight (8); D, the main arm (5) the jib (6) through the bearing cable (7) is installed on the rotary support (3); E, the main arm (5) side arm (6) and Russo (7) can have a variety of length combination; F, a main arm, jib all tube truss structure; G, hook pulley h, equipped with a variety of rate; the torque limiter (10) and amplitude detection device (11); I, operating room in slewing bearing (3); J, self moving use winch is luffing winch main arm, mounted on a rotary support (3).Track type multi characteristic tower crane. The utility model is especially suitable for power construction and hoisting operation. The slewing support on the track type door frame is provided with a main and an auxiliary arm frame, and various variants can be formed through different combinations. Its maximum torque of 3360 tons meters, the maximum lifting capacity of 140 tons, the maximum working range of 60 meters, the maximum rise of 120 meters. The utility model can be carried in the lifting, and the work is smooth and safe. The main and auxiliary arms are all truss structures, light in weight. The electronic torque limiter and other safety devices are adopted, and the 130 meter high machine can be installed by itself. This machine can also be used in petroleum, chemical, metallurgical and other large projects.
Q: Yeah, I think I know what cranes are used for. But in the context of building an apartment and so on, what is the role derricks there. And why is called cranes and derricks - What is the correlation between them.
Cranes are used for lifting heavy equipment. Derricks are used to drill for oil. They are two different things.
Q: how do you say paper crane in japanese?
This Site Might Help You. RE: how do you say paper crane in japanese?
Q: I have a Holden 253 and I'm looking at a hydraulic street/strip cam, and I'm wondering which brand is better out of Crow and Crane?Cheers.
crane is they cam i like but they are both good.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords