Flexible Aluminum ventilation hose aluminum foil air duct expandable aluminium ducting of CNBM
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m
- Supply Capability:
- 50000000 m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Zhejiang China (Mainland) | Brand Name: | cnbm | Model Number: | Hose |
Type: | Ventilation | size: | 3" ~48" ( 076mm ~ 1200mm). | Item name: | 4"-12" Flexible Aluminum foil ducts/expandable aluminum ducting |
Packaging & Delivery
Packaging Detail: | as per customer's. Duct in duct ,seaworth carton.for aluminum vent hose |
Delivery Detail: | 10-20days |
Specifications
4"-12" Flexible Aluminum foil ducts/expandable aluminum ducting
fireproof and airtight
compressible,Many sizes for choice.
4"-12" Flexible Aluminum foil ducts/expandable aluminum ducting
Aluminum foil duct,air ventilation hose is designed for air-cooling and can be used in different forms of heating and ventilation applications.
This product is made with strong 3-ply aluminum foil laminate to resist puncture and tears. One continuous and corrosion resistant helix wire is placed in the duct wall for structural support. Basically, The perfect cooling channel for your air-cooled reflectors with hydroponics set up.
Data : Standard length :10 M, compressed to either 0.4-0.6M.
Diameter :3" ~48" ( 076mm ~ 1200mm).
Air Pressure:Max 25mm WG (2500Pa or 10"WG)
Air Velocity:Max 25mm/sec (4900 ft/min)
Inner diameter ranges from 2″ to 40″ inches
Length: 10 meters or as your request
Specifications:
Light weight for easy transporatation.
High flexibilit for easy bending , compressible
Resistant to toxic chemicals and dramatic environment.
Easy to install over either round or oval ducting
No for especial tools required utting or fixing
Flame resistant
Excellent resistance to chemicals
Small bending radius
It is robust, durable and lightweight.
- Q:Will the embedded stove why use stainless steel corrugated hose connection?
- The construction of the scaffolding of this project is subject to the requirements of the relevant sections of the latest JGJ130-2011 "Safety Code for Construction Fastener Steel Scaffolding" To design and calculation, the preparation of special safety construction program, after the implementation of the approval. The preparation of the steel pipe should be selected first vertical and horizontal spacing and horizontal bar step, only these are determined in order to calculate the amount of steel pipe.
- Q:The first generation of the tube is that year out?
- It is made up of corrugated flexible tube, net cover and joint Metal hose with austenitic stainless steel or according to user requirements of the material manufacturing, metal hose has excellent flexibility, corrosion resistance, high temperature resistance (-235 ℃ ~ +450 ℃), high pressure (up to 32MPa) , Metal hose in the pipeline can be connected in any direction for temperature compensation and absorption of vibration, reduce noise, change the direction of media transmission, to eliminate the pipeline or between the pipe and the mechanical displacement between equipment, double flange metal corrugated hose It is particularly suitable for flexible joints with various pumps, valves and so on for displacement and vibration Metal hoses use two kinds of bellows, one is a spiral corrugated tube; the other is a ring bellows Solution: Songjiang metal hose
- Q:For example, HDPE pipe with a flexible connection is a flexible interface, PVC-U of the glue plug-in method, is just helium pouring a lie on the pizza pull the interface, wire then, flange it more
- PM25 and other dust particles mosquito 4 The The The One of the most critical is that the window is not New Zealand, to know that China's outdoor air quality is very bad And closed doors and windows (especially air conditioning or warm and warm equipment must be closed when the window), the indoor air in a variety of superimposed pollution (decoration pollution, carbon dioxide exceeded)
- Q:Do you have a natural gas hose in the flue?
- Fastening steel pipe scaffold generally by the steel pipe rods, fasteners, base, scaffolding, safety net and other components of steel pipe: generally there are two, an outer diameter of 48mm, wall thickness 3
- Q:What is the effect of concrete pouring on the construction quality?
- Our usual way is to fight the fuse.
- Q:Two hundred galvanized pipe should be under the large flexible tube
- We now have to declare the Department of the Ministry of the United States and the United States, the company said that the access point to our own set, so I would like to ask, what is the requirements of this access point? There is no relevant specification to add: is the construction, the outdoor pipe network in the gas access point position more
- Q:CAD type too much (including civil engineering, interior spring design, motor, machinery manufacturing and many other), a beginner how to choose?
- The concrete structure has been included in the structure, but the concrete structure is a concrete structure, but the structure is just a frame structure without concrete structure; another steel structure and concrete structure is a good idea but to do Less, the third floor is said to be the main structure of the original structure, masonry works using concrete, then this will undoubtedly increase the cost of the house, if not very high floor or earthquake area is clearly not economical
- Q:Flexible pipe trench backfill inspection batch quality acceptance record how to fill
- Step distance is the bar distance, vertical distance is vertical bar distance. Span ... guess or pole distance.
- Q:Is the clamp type flexible connector connected to the pipe to the rubber pad?
- 1. Civilized construction program 2. Safe construction program 3. Template construction program 4. Scaffolding construction program 5. Sambo four construction program 6. Temporary electricity construction program 7. High operating construction program 8. Tower crane construction plan 9. Multi-tower operation anti-collision construction program 10. Emergency emergency plans 11. Winter rainy season construction program 12. Significant hazard assessment measures 13. Construction organization design 14. Building energy conservation program 15. Basket construction program 16. Tower crane hoisting program
- Q:To ask why the use of clamps connected to the spray pipe after the flush again after the water there will be a lot of hook link position leakage phenomenon? Thank you! The The
- It should be JGJ130-2001 Ministry of Construction 2001-02-9 approved 2001-06-01 implementation
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Flexible Aluminum ventilation hose aluminum foil air duct expandable aluminium ducting of CNBM
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m
- Supply Capability:
- 50000000 m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords