Fireproof Calcium Silicate Board with EPS Foam Core
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 Square Meters m²
- Supply Capability:
- 100000 Square Meters per Month m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Detailed Product Description
-calcium silicate board
-fiber reinforced cement board
-waterproof
-fireproof
-ideal ceiling and wall partition material
Product technical parameters | |||||||||||||||
| |||||||||||||||
|
- Q: The wires were placed in the foam box for a while and the wires went inside the foam. The wires were in good condition and the foam panels were melted. Question added: several are asked by the non-asked. I said that the wire put the box, and no power work. More
- You do not specifically say anything, rock wool sandwich panels, steel sandwich panels, or other. Such as the arc of the post to drink the United States and Taiwan is to pay attention to the high content of the glue is not used in hot places usually less use, must be used only shaped ceiling, because it can bend, other places do not use.
- Q: How to do indoor insulation, with extruded board how to do it
- Large bar fixed Spacing is not greater than 6m, deflection is not (1/3) set and set the anti-skid, the upper and lower ladder installed a solid 10 bar erection joints staggered, scissors pole rod length is not less than the length of the scaffolding Lm, pole docking must be carried out 11 steel pipe scaffold grounding four corners should be set to ground protection and lightning protection device acceptance: experience acceptance, in the course of the use of someone should be "tube, with, support, repair" to participate in the acceptance: Note: 1. If there is data in the acceptance section, the measured data must be filled in the acceptance column, and no data shall be used. 2. This acceptance form can only be used once, after the acceptance of phased acceptance, after each acceptance of a card after the acceptance Acceptance of qualified cards must be numbered and indicate the date of acceptance. 3. Scaffolding in the use of the process, there must be a regular inspection, maintenance system. Scaffolding total height 12M Acceptance date The date of the supervision of the person in charge of technical units responsible person acceptance height erection 7.1M qualified card number set up the team and the person in charge of the total package unit technical person in charge
- Q: North of the attic bedroom window on the edge of the long hair is to do waterproof or do external wall insulation can completely solve the long hair
- 02 ~ 005mm, film or coating thickness is often only 015mm below The thickness of the substrate is important from the time of use of the color plate And some manufacturers of color steel plate are often in the substrate and color plate coating or film on the hands and feet, they reduce the thickness of the substrate, but increase the thickness of the peritoneum to reduce the production cost of color plate, which greatly reduces the use of color plate Life expectancy
- Q: Will the use of insulation materials design unit is not allowed to specify the manufacturer
- First of all, in essence, to achieve heat insulation is to block the transmission of heat, and heat transmission methods are: heat radiation, heat conduction and convection
- Q: I often sleep on a large inflated polystyrene board! Is usually seen in the foam board! Will the experts in the above sleep on health is affected Will you have toothpaste harmful to the body!
- From the current situation, aluminum scaffolding industry is developing rapidly, as a new industry construction equipment, building materials, now slowly replaced the steel pipe, iron pipe and other heavyweight scaffolding. But because of their own high cost and industry prices, the current mainly used for decoration decoration, aerial work platform, display exhibition and some complex, difficult, other products can not complete the job occasions. Currently divided into two kinds: one is: more popular and most of the welded frame aluminum alloy scaffolding. Second, the combination of single-tube aluminum alloy scaffold. On the description of the two products, I will not say more, please go to the Internet to collect information can be compared.
- Q: What are the measures for building insulation in hot summer and cold winter areas?
- Need to choose the appropriate ground radiation heating method of ground materials. Ground radiant heating system mainly through the ground concrete and ground material to heat the radiation to the room, so during the heating season, the ground material will always be subject to a certain temperature of continuous heating. So the ground material suitable for good heat dissipation, material properties are not sensitive to changes in temperature of the stone or composite floor, the current solid wood flooring is not suitable for ground radiant heating system. Need to choose a pipe with anti-oxygen performance. The application of the plastic pipe itself has a certain permeability, the system exists oxygen prone to aerobic corrosion, the system of metal fittings and metal equipment and other devices produce corrosion damage, resulting in the use of the process of leakage hazards. Therefore, in order to ensure reliable operation of the floor heating system, the selected pipe must have anti-oxygenation performance and meet the requirements of DIN 4726 for oxygen permeation: less than 0.1 mg / L.d at 40 ° C.
- Q: Balcony wall insulation with polyurethane or extruded board is good
- At present, China is not big, because the Chinese market is now recognized not much. The best company to import the SGB / slips dumplings Oujiu tea off Long UPright, made better is the grid special brand
- Q: What is the glue on the sticky extruded board? The difference between sticky and plywood and sticky extruded plastic
- Wall insulation, then the best use of extruded board, it is higher than the density of benzene board, the natural insulation performance will be better. Because it is a slope of the top, so the outdoor insulation, then there will be some difficulty in construction.
- Q: What is the waterproof insulation material on the building?
- At the beginning can be less investment, 5000 or so, and then, after the start of operation to see how the demand, if not satisfied to increase resources in time. Say that you are still not well known at the beginning of the well-known, such as running a period of time after the high profile, the business will be more. This will know the needs of your needs there
- Q: Is the concrete foam board and cement foam board the same thing?
- Can be used for insulation and waterproof insulation materials polyurethane polyurethane foam coating on-site performance indicators: for the floor of the building, cold storage, light housing roof. Product specifications: 0.6 * 1.2m thickness: 30-200mm Note: According to user requirements to produce a variety of technical indicators: Density: 30-60kg / m3 Thermal conductivity: 0.016-0.027w / mk Compression performance: 191-228kpa Tensile strength: 2.5-3.5kg / m2 Closed porosity: 93% Water absorption: 0.25 粻 粻 粻 救 救 嚼 奠 奠 盲 盲 盲 盲 盲 % (- 10 ~ +70 ℃) Flammability: from the fire self-extinguishing (3 ~ 5S use temperature: -196 = power 003 words
1. Manufacturer Overview
Location | Guangdong,China |
Year Established | 2009 |
Annual Output Value | |
Main Markets | South America20.33% Africa 2.32% Mid East 3.39% Eastern Asia 4.64% Central America 2.14% Northern Europe 5.14% Domestic Market 62.04% |
Company Certifications | ISO 9001:2008;ISO 14001:2004 |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Guangzhou,Shenzhen |
Export Percentage | 81% - 90% |
No.of Employees in Trade Department | 3-5 People |
Language Spoken: | English, Chinese |
b) Factory Information | |
Factory Size: | 10,000-30,000 square meters |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Fireproof Calcium Silicate Board with EPS Foam Core
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 Square Meters m²
- Supply Capability:
- 100000 Square Meters per Month m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords