Excavator Mounted Hydraulic Breaker Hammer for Construction
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 200 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Excavator Mounted Hydraulic Breaker Hammer for Construction
We are a manufacturer specialized in the hydraulic breaker with superior quality, We also supply other concerned hydraulic spare parts including main body assembly, the back head, cylinder assembly, front head, piston, reversing valve, oil seal retainer and etc. Our products can be used for Komatsu, Hitachi, Kobelco, Kato, Sumitomo, Hyundai, Volvo excavator, etc.
Advantage:
(1) Use the highest strength material to get better wearing resistance.
(2) Easy maintenance, prolonged life.
(3) We have accumulated sales of 20, 000 units, rich maintenance experience.
(4) The warranty period is 1 year.
Description:
Hydraulic rock breaker is powered by an excavator or loader pump provides pressure oil, it can dig a fundamental role in building a more efficient clean up floating rock crevice in the rocks and soil. Optional hydraulic hammer excavator model is based on the principle of the operating environment to choose the most suitable hydraulic rock breaker
Hydraulic breaker has become an important tool for the job, it was installed in the hydraulic breaker backhoe loaders (also known as two busy) or wheel loader for crushing operations. Excavator Hydraulic Breaker, also known as hydraulic breaker or hydraulic rock breaker (Excavator Hydraulic Breaker).
Specification:
Exvacator breaker technical paramaters | ||||||||
TRB680 | TRB850 | TRB1000 | TRB1350 | TRB1400 | TRB1550 | TRB1650 | TRB1750 | |
Weight | 258 | 557 | 753 | 1653 | 1774 | 2569 | 2752 | 3912 |
Length | 1415 | 1735 | 1994 | 2367 | 2414 | 2760 | 2816 | 3176 |
Required oil Flow | 40~70 | 60~100 | 80~110 | 120~150 | 130~1800 | 180~240 | 200~260 | 210~290 |
Working pressure | 110~140 | 130~1640 | 150~170 | 160~180 | 160~180 | 160~180 | 160~180 | 160~180 |
impact rate | 500~900 | 400~800 | 350~700 | 400~800 | 350~500 | 300~450 | 250~400 | 200~350 |
Hose Diameter | 0.5 | 0.75 | 0.75 | 1 | 1 | 1 | 1.2 | 1.2 |
Chisel Diameter (mm) | 68 | 85 | 100 | 135 | 140 | 155 | 165 | 175 |
Chisel Length | 700 | 900 | 1000 | 1300 | 1300 | 1500 | 1600 | 1600 |
Applicate Exvacator | 4~7 | 7~14 | 10~15 | 18~26 | 18~26 | 28~35 | 30~45 | 40~55 |
Company profile:
(CNBM International) is the most important trading platform of CNBM Group Corporation, a state-owned company under the direct supervision of State-owned Assets Supervision and Administration Commission of the State Council.With the advantages in Cement, Composite Materials, New Building Materials and Engineering, We are enlarging sub-brand. Currently, we have wholly-owned overseas subsidiaries and branches in 5 countries with a view to realize localization. Meanwhile, we have established strategic partnerships with hundreds of domestic manufacturers and sound business relations with clients from over 120 countries. In line with the business, CNBM International launched E-business platform Okorder.com. It conformed the best resource and logistics to meet the customers’ request with 24 hours full-time service.
FAQ:
1. Q: Can I get some professional suggestion?
A: Sure, we have professional engineer. Any question will be solved.
2. Q: Do you have the products in stock?
A : Yes , We have several models now could supply to you.
3. Q: What's the delivery time?
A: It usually takes about 25 days to produce an order. But the exact delivery time might be different for different orders or at different time.
4. Q: How does your factory do regarding quality control?
A: Quality is priority. Workers always attach great importance to quality control from the every beginning to the end of the production. Every product will be fully assembled and carefully tested at important moment.
5. Q: Will you deliver the right goods as ordered? How can I trust you?
A: Yes, we will. Our company is world top 500, that is the biggest supplier and manufacture in China, having a good reputation around the world.
- Q: What is the difference between the application and maintenance of construction machinery and the operation and maintenance of automobiles? What a promising future!
- As far as maintenance is concerned, the maintenance of construction machinery is mostly in the field or on the construction site. It needs to withstand the scorching sun or the ice and snow (and partly in the factory) as well as the bumpy journey back and forth. The car is generally in the factory building, and some have air-conditioning, better conditions.
- Q: I'm thinking about making something out of wood but I dont have any machinery to do it, all I have Is a saw and a couple knives but that's it. Any ideas?
- tooth pick.
- Q: I am looking for the Leather Picker , Leather Buffer and Picking Stick use in Power Looms, Kindly make contact with me from Pakistan Only with cheap best quality . Any person who can help out me please make contact with me on this email address
- LEATHER PICKERS NO. S-6 FOR SAKAMOTO LOOMS. LEATHER PICKERS NO. S-5 FOR SAKAMOTO LOOMS LEATHER PICKERS NO. S-7 FOR SAKAMOTO AUTO LOOMS. LEATHER PICKERS NO. 22 FOR PLAIN LOOMS. LEATHER PICKERS NO. 22 (L) FOR TURKISH MARKET. LEATHER PICKERS FOR CARPET LOOMS. LEATHER BUFFERS FOR SAKAMOTO LOOMS. HIGH COMPRESSED WOOD SHUTTLES FOR COTTON IN DIFIRENT SIZES. HIGH COMPRESSED WOOD SHUTTLES FOR AUTO LOOMS IN DIFIRENT SIZE. HIGH COMPRESSED WOOD PICKING STICK OF ALL TYPS. HIGH COMPRESSED WOOD SIDE LIVER.
- Q: What are the concrete construction machinery?
- Mixing truck (247) pump (162) side dump concrete truck (32) rail type mixer (9) semi trailer (11) bulk cement truck (17) dry mortar transport equipment (20) mounted concrete pump (53) cloth rod (19) other pumping machinery (63) the spray machine (10) pouring equipment (4) air chute delivery system (8) pneumatic lift system (3) bin pump system (7) chain conveyor (5) screw conveyor (11) high speed elevator (16) high bucket chain hoist building (20) (37) the belt conveyor (15) powder conveyor (7) crane (38) concrete feeding equipment (72) loader (31) cloth car (3)
- Q: we were cutting trees in the woods behind my house today and we found this old piece of tobacco farming machinery but have no clue what it does or what it is for.
- These okorder /
- Q: What do I learn about hydraulic systems, engineering machines or steel mills?
- In addition, the hydraulic equipment manufacturers is one of the more demanding hydraulic industry. Louzhu can also consider the hydraulic components manufacturing enterprises, which is one of the development direction. Of course, in addition to hydraulic professionals, the basic knowledge of other machinery is essential
- Q: I ve been going to school for HVAC for about a month now. And I was just wondering if anyone had any tips on reading schematics or wiring the machinery up. ( besides make sure the power is off) Each day I get it a little more but I was just wondering if any experts had some tips. Also how is the pay when you get out of school? Please don't tell me to go to salarey I just wanted to know for someone with 1st hand experience. I live in Ma. Thanks in advance
- When working with schematics just remember that all electrical circuits have to have 5 components 1) a source ( ac or dc) 2) a load (maybe a lightbulb) 3) protection ( fuse or circuit breaker) 4) conductors (wires) 5) a switch. Once you know what all of your components are you shouldn't have any trouble following the lines on the schematic. As far as pay is concerned, it all depends on salaries in your state. I don't know what they are in MA. Try calling some electrical contractor in your area and do a salary survey with the. Hope this helps.
- Q: What is defined in construction engineering as large machinery?
- Tower crane, static pile pressing machine, construction elevator, submersible drilling machine, concrete mixing station, crawler excavator, bulldozer, crawler crane, diesel hammer, roller, rotary drilling machine, high-speed hoister, vibratory piling machine (static vibration), high pressure rotary grouting pile machine, concrete mixer. I know so much
- Q: Do I need a license to operate your machinery?
- yea. you can't touch MY machinery with out a license lmao. vrrrrooooooom
- Q: Why is it anyone elses business? Studies have proven time and time again that drug testing is useless for determining preformance.
- I agree mostly. The purpose of drug testing other than pre employment, is so that when someone gets hurt on the job and comes up dirty the company is not liable and can fire the person. Maybe they should test people for being tired or perhaps overworked and stressed too that way they could get out of even more Workman's comp cases. I think you should be tested with a Breathalyzer to see if you are drunk but not drug tested. That is bullshit. If you are drunk on the job you should loose your job, and you really shouldn't be getting high at work. But there is no test to see when you got high only that you had gotten high at some point within the last month or so. It is also a means to divide and conquer the populace. But lets not get into that.
Send your message to us
Excavator Mounted Hydraulic Breaker Hammer for Construction
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 200 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords