• Euro Frame System Scaffolding  Steel Hot Dip Galvanized System 1
  • Euro Frame System Scaffolding  Steel Hot Dip Galvanized System 2
  • Euro Frame System Scaffolding  Steel Hot Dip Galvanized System 3
Euro Frame System Scaffolding  Steel Hot Dip Galvanized

Euro Frame System Scaffolding Steel Hot Dip Galvanized

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
500 pc
Supply Capability:
100000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description

 

 

Why choose us

 

1. professional scaffold manufacturer
2. timely delivery
3. authorty certification
4. technical support

5. 8 years' experience

6. 6S management

 

 

 

 Euro Frame System Scaffolding  Steel Hot Dip Galvanized

products size :

 

standard 48.3*3.2 mm

 

ledger     48.3*3.2mm

 

brace      48.3*2.5mm

 

Any size can be specificed


 

 

 

 

 

Packaging & Shipping

 

We ensure your goods can be delivered safely:

 

 1.Experienced packer and technician

 

2.Standard rack

 

3.Long-term cooperative freight forwarding and shipping company 

 

 

Euro Frame System Scaffolding  Steel Hot Dip Galvanized

 

 

 

 

 

Our Services

 

Rapid Scaffolding takes pride in offering a team of highly experienced and suitably qualified engineering and technical experts. According to different requests from all our customers, we can provide a whole range of scaffolding and formwork designing, we also provide the total solutions for any project.

 

 

 

Euro Frame System Scaffolding  Steel Hot Dip Galvanized  

 

 

 

 

 

Company Information

 

Certificates

As a professional scaffolding manufacturer for years' experience in China, we have obtained many certification authority, including ISO9001:2008, ISO14000, CE,  OHSAS18000 and our products are also tested to meet USA standard (ANSI A10.8), Australia/New Zealand standard, Japanese standard.

 

 

 

Euro Frame System Scaffolding  Steel Hot Dip Galvanized  

 

 

 

 

 

Inspection

 

We have a strict quality control system based on the security awarness and the practice. According to the requirements of ISO9001:2008, we examine the products through the whole production from the raw material to the final products.

 

 

 

 

 

Euro Frame System Scaffolding  Steel Hot Dip Galvanized

 

 

 

 

 

FAQ

 

What we are doing to ensure the high quality?

 

 1. Introducing quality assurance into projects at the earliest stage by continued planning, including comprehensive inspections.

 

 2.Maintaining the highest level of employee skills by the continual assessing and training of all employees.

 

 3. Maintaining a working environment based upon trust, respect, teamwork at all levels within the company.

 

 4. Effectively communicating and encouraging feedback with our clients, sub-contractors, suppliers and consultants to constantly improve our quality and compliance standards.

 

 5. A professional quality control team involves in everyday production.

 

 

Euro Frame System Scaffolding  Steel Hot Dip Galvanized

 

 Any interest or questions,welcome to contact us.

 

Any inquiry will be replied within 24 hours.


Q: Is there any reason why you shouldn't?
No reason other than scaffolding planks are way thicker than floorboards would be, thats all. If you've got a supply of them, you may as well use them, but they will be harder to fit. if they're going on top of joists, then the finished height will be above door clearances, too
Q: I have like 70 frames of scaffold to sell in the dallas area and I don't know where to post it other than ebay and craigslist
Use okorder , okorder , hope these help.
Q: Door type steel pipe scaffold, bowl type, plate type, what is the disc pin?
Among them, the proportion of steel pipe fastener scaffold is larger, and the door type scaffold is mainly used for decoration and indoor construction
Q: Can you shorten the distance of the bowl buckle scaffold? That is, regardless of the length of the pole, the distance can be set to 60, 90, 120cm. Thank you
The step distance of the bowl buckle steel tube frame must be determined through calculation; for example, the vertical distance of the vertical rod is 120
Q: Pankou scaffolding is good for
Pankou scaffolding scaffolding activities. Abandon the traditional parts easily lost and damaged problems, and compared with the ordinary bowl-scaffold, saving up to 2/3 more than the amount of steel, so to a certain extent, greatly shorten the construction unit cost and economic loss.
Q: how can you tell is a scaffolding piercing is infected?
Excessive redness extending well beyond the piercing area, hot to the touch, yellow/green pus with an odor.
Q: i have an industrial piercing but the top piercing(scaffold) has a bump on it making it hard to find the hole to put other jewerly in besides the bar. how do i get rid of the bump?
It is probably hypotrophic scarring. Cartilage piercings, especially all types of industrials, are prone to this type of scar. Hypotrophic scarring is a bump surrounding the exit hole, the same color as your skin. It may feel hard, but often are not painful. They are usually caused by jewelry putting pressure on the piercing, and the body responds by scarring. Hypotrophic scarring is often due to pressure on a piercing. Changing your jewelry is usually the best move. If the scar is around a ring or other curved jewelry, switch to something straight, like a barbell. If it's on an industrial, put individual jewelry in each piercing. Consult your piercer for jewelry changes in unhealed piercings. Time and oil massages often improve scarring. If hypotrophic scars don't improve after some time, steroid injections and certain topical creams may help. Consult a doctor to see if this is an option.
Q: Why do a mobile tower scaffolds have wheels fitted with brakes?
So it can be partially assembled, moved into position, then the brakes are put on so it doesn't move while it's in use.
Q: The role of scaffolding and the basic requirements for scaffolding
1, to have enough firmness and stability, to ensure that during the construction of the specified load and climate conditions, no deformation, tilt and shaking2, to have enough area to meet the requirements of material, transportation, operation and walking3, the structure should be simple, erection, demolition and handling to facilitate
Q: The bowl buckle scaffold allows the joint to be in a section
Need to take some special way to do some processing,

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords