Earth Moving Excavator high quality FR260
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Adequate technology for earthmoving operation which is formed by absorbing advanced European technology. The product orientation is mainly the working condition of rock operation, being highly efficient and economical;
2. Isuzu engine with advanced performance, high reliability and strong motive power;
3. Rexroth positive flow system is employed for the first time, idling automatically with low power loss and system heat, which enhance the controllability and accuracy control performance of the excavator;
4. Enhanced working device design, adopting cast-weld structure of low welding stress, excellent effect of absorbing vibration and high strength.
Main Parameters
Operation Weight (Standard Configuration) (KN) 25050
Standard Bucket Capacity 1.2
Transport Dimensionsmm 9945*3180*3255
Bucket Digging Force (KN) 172
Bucket Rob Digging Force (KN) 129
Maximum Traction (KN) 247
Device
High-low Speed (Km/h) 4.8/3.4
Climbing Performance(°) 30
Total Length of the Crawler 4660
Tail Turning Radius (mm) 2945
Width of the Crawler 600
Ground Pressure (Kpa) 51
Turning Mechanism
Turning Speed (rpm) 12.2
Engine
Model 6BG1TRP Isuzu 6BG1TRP
Form Six Cylinders, Straight, Four Strokes, Direct Injection, Turbocharger, Air Inter Cooling
Rated Power/Rotate Speed (KW/rpm) 125/2100
Rated Torque/Rotate Speed (N.m/rpm) 637.9/1800
Cylinder Diameter*Stroke (mm) 105*125
Output Value (L) 6.494
Fuel Consumption (g/KW.h) 237
Hydraulic System
Fuel Tank Capacity (L) 385
Main Pump Pressure (Mpa) 32/35
Main Pump Flow 240*2
Operating Scope
Maximum Digging Height (mm) 10220
Maximum Dumping Height (mm) 7210
Maximum Digging Depth (mm) 6920
Maximum Digging Radius (mm) 10210
- Q: i been playing the new moon map with my friends i know how to stop the excavator but in round 26 both excavators came down wich i tought there was not going to be any problem because on the next round i was going to stop both with the hacking device so we went te teletransport and went to area 51 than teletransport to the excavator station where you suppose to stop them i did stop both of them than changed my hacking device for the mask than i went to tunel 6 and the scavator was not all the way up so i went to tunel 11 and the same it was not all the way up idk why this happend so there was not a way to get to the dome where me and my firends camp and that was it we only made it to round 29.have this happend to you? why this happend?
- I had something similar once when I played with my friend. We couldn't find a way to get back to the dome, so we just decided it best to sacrifice a perk and let the astronaut guy hopefully teleport us to the other side of the excavators lol.
- Q: i want visit australia but i don't have friend or family there, anyone please help me...
- It won't be easy as they're pretty strict on you having the right tickets (like a licence), which can be quite expensive to get. It would be easier to look for labouring work.
- Q: Is it possible to mine copper without using fossil fuels?
- Of course. That's how they did it in the very old days when copper was the main metal. It's just very labor intensive.
- Q: Can chain excavator walk on the asphalt road?
- It depends on the situationThe correct answer is "no"Because crawler excavator walking on the road will cause damage to the road surface, foreign countries generally require walking on the road, construction of excavators with rubber tracks
- Q: I'm doing a science project, and I need to know what some of the good benefits of an excavator are. For those of you who don't know, an excavator is a big machine that people use in construction, you know, the big one that digs, look it up on google images lol. Anyways, if you know any benefits of an excavator are, please tell me. That would be great! Thanks.
- It's fast in the sense of doing a lot of digging quickly. It is also very strong, and it doesn't get tired as human diggers would :-)
- Q: My PC160 slows down when I run it for an hour or so. Its not over heating and my filters are clean, the hydraulic fluid and type is good.The cowd in and outand boom up and down is the most noticeable, but I'm sure the swing is affected by this seeins how everything is set based on the swing. Any insight would be greatly appreciated.
- might be the pressure relief valve on the pump when it gets hot? maybe a pinched/crushed hose that collapses when hot?
- Q: some retraining as his 43year old body just can not operate heavy equipment anymore. I have been looking into other career choices for him that do not require much schooling due to his limitations. Would anybody out there have any suggestions. He has a bad back so keep that in mind as you answar. At this point, it doesn't matter if he needs to travel out of state. Thank you.
- He needs to go to a career center and get an assessment done. He is 43 so he probably has all kinds of skills but doesn't realize it. What sort of heavy equipment are you talking about? Bulldozer and excavator? If so he might look into training others or doing supervision work. If he has worked around construction sites with heavy equipment in the US he is probably familiar with the safety requirements, and nowadays there are jobs in the safety industry. There is training available, usually, in safety. Assess his back injury, what does it keep him from doing? Some heavy equipment is less strenuous on the back.... need more info. How about trucking? There's crossover in the skills department but possibly not so hard on the back. Just remember, just because he is a blue collar construction worker, at 43 his skill set is probably not only well developed but in demand. Career counselling is really important, and staying positive. Good luck!
- Q: Use of excavators
- (1) building and building foundation excavation; (2) mining soil, stripping mining field covering layer;
- Q: I have bought a 1 month old pastel ball he's in a seperat terrarium in another room then my 12 other adults he looks gorgeous and is Happy and active well here it it's I have a 30 by 12 by 18 tank one side has excavator tunnel's and a cave and a tree with zilla plastic plants this is his heat side I have a regular fluker basking spot running 12 hours and a black heat light that runs 24/7 then in the middle a large water dish then a all living things corner cave on the cool side along with a 15in reptiglo 5.0 and a fogger he is absolutely the most happy snake I've ever seen I also use eco earth he tunnel's in it also. But I feed him in a separate tank so he doesn't eat eco earth I know it's over kill but he's a happy happy snake also 2 other zilla plants over each cave.
- Very nice, he will be spoiled :)
- Q: whats the name of the big machine that they use to dig up concrete called?
- It is called a truck
Send your message to us
Earth Moving Excavator high quality FR260
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords