• Duro Dyne Cmax Aluminum Flexible Duct with CE Certificate System 1
  • Duro Dyne Cmax Aluminum Flexible Duct with CE Certificate System 2
  • Duro Dyne Cmax Aluminum Flexible Duct with CE Certificate System 3
Duro Dyne Cmax Aluminum Flexible Duct with CE Certificate

Duro Dyne Cmax Aluminum Flexible Duct with CE Certificate

Ref Price:
$1.50 / pc get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
500 pc
Supply Capability:
700000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Application and benefits of Flexible Duct

-Applied in air conditioning/ventilation systems

-Tear and puncture resistant

-Corrosion resistant

-High flexibility

-Convenient installation

-No toxic gas emission

 

Non-insulated Flexible Duct

Structure: double-layer aluminum foils +1 layer of PET film.

Structure: 1 layer aluminium foil+ 1 layer of PET film

 

Insulated Flexible Duct

Structure: 1 layer of Alu. Foil+1 layer PET film+insulated glass wool

Outer jacket: 1 layer of Alu.foil

Glass Wool Density: 16kg/m3; Thickness: 25mm
 

Insulated Acoustic Flexible Duct

Structure: 1 layer of Alu. Foil+1 layer PET film+insulated glass wool

Outer jacket: 1 layer of Alu. Foil + 1 layer of PET film

Glass Wool Density: 32kg/m3; Thickness: 25mm
 

Combined Flexible Duct

Structure: flexible duct PVC jacket. 

REMARK: Special structure is available according to customer's requirements

 

Pictures of Flexible Duct  

 

FAQ of Aluminium Flexible Duct:

1.             What temperature maximum? Our products: 150 and 250

2.             What MOQ? Our MOQ: 500 pcs

3.             What payment terms? We accept T/T and L/C

4.             Lead time: 10 days

5.             Packing: Nest packing for non-insulated flexible duct, then into plastic bag for   non-insulated flexible duct or packed in individual carton box. 

 

 

Q: What is the effect of concrete pouring on the construction quality?
The use of the trench connection to check the pipe sealing surface is smooth, smooth, no burr. Whether the sealing surface of the sealing ring is scratched, whether the length of the sealing section of the pipe meets the requirements. These three points to ensure that certainly not leaking.
Q: Drain flexible pipe to keep the base design above the elevation of the number of meters
, there are cloth-based materials, such as Teflon cloth, etc
Q: Do you have a natural gas hose in the flue?
Fastening steel pipe scaffold generally by the steel pipe rods, fasteners, base, scaffolding, safety net and other components of steel pipe: generally there are two, an outer diameter of 48mm, wall thickness 3
Q: Does the desulfurization and denitrification equipment use metal hoses?
Electrician electrical welder field driver tower crane driver signal workers scaffolding workers lifting workers
Q: I am sorry to see your answer on Google, can I also pass a copy of my construction and decoration project?
so much? The Lifting workers, shelves workers, electricians, welders
Q: What are the scope of construction work special operators?
For air conditioning manufacturers, in order to standardize the product design, the two products may be the host of the heat exchanger, compressor, fan motor selection for the same, but they will specifically for different types of product design, manufacturing different main Control parts, and the two models of the host model is completely different.
Q: How to effectively deepen the construction process management to improve the quality of construction projects
Abstract: The thermal degradation and catalytic degradation of waste polystyrene plastic were carried out
Q: CAD type too much (including civil engineering, interior spring design, motor, machinery manufacturing and many other), a beginner how to choose?
The concrete structure has been included in the structure, but the concrete structure is a concrete structure, but the structure is just a frame structure without concrete structure; another steel structure and concrete structure is a good idea but to do Less, the third floor is said to be the main structure of the original structure, masonry works using concrete, then this will undoubtedly increase the cost of the house, if not very high floor or earthquake area is clearly not economical
Q: How is the flexible tube of FRP composite pipe defined
Filling system is also used to close the molecular structure, you can put an end to the condensation of water vapor
Q: What materials are made of flexible pipes? Why should the mechanical ventilation set the flexible tube? Where should I be located?
It is recommended to use the home of the heart of the card to worry about toughness to fill the joints, and then paste the seam (master understand) if directly in the sandwich panel (plate) on the batch of putty powder or spray painted really easy to drop off the phenomenon of stone, the first primer, it is recommended to use the home of the German brand brackish scraping scraping again There are), to be dry and then approved scraping putty powder spray really stone paint

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords