double layer roll forming machine
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 30days set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
double layer roll forming machine
Description |
Introduction |
Customer needs |
Working efficiency | 8-10m/min |
|
Thickness of Material | 0.4-0.8mm | Can changed depend on your need |
Width of material | 914-1250mm | can be design according to your need |
Control system | PLC |
|
Uncoiler system | 5Ton Manual Operation | 1250mm width |
Forming by rolling | 13 rows |
|
Roller material | GCR15 Aluminium processing after quenchin HRC58-62℃,Chrome plated |
|
Shaft and the diameter of axle | 45#Aluminium-processing ,diameter of axle=¢80mm
|
|
Main part power | 5.5kw |
|
Hydraulic motor power
| 3kw |
|
Hydraulic pressure | 12Mpa |
|
Scissor material | Cr12Mov, herd steel HRC 58-62℃ |
|
length tolerance
| ±1.5mm |
|
voltage | 380V, 50HZ,3 phase (adjustable by customer needs) |
|
Frame form | arch type |
|
Driving Method | Chain |
|
Color | Yellow and blue(adjustable) |
|
Size | length*Width*Height - 8.2*1.65*1.5m |
|
Package | Nude package in 1*20GP container
|
|
Delivery date | 60 working days |
|
Payment Method | 30% T/T in advance and balance 70% after inspection confirmation before shipment. |
Payment terms | Price: FOB Tianjin new port Payment: 30% T/T in advance and balance 70% after inspection confirmation before shipment. Delivery: within 45 working days after receipt of deposit. |
Warranty | 1. One year, and we will provide the technical support for the whole life. 2. Training: the buyer should charge of visa, return ticket, food and accommodation overseas and USD50/person/day for salary. 3. Need one technician 4. Training time: one week (contains the time of installation and adjustment) |
- Q: What steps are required during the installation of the cement tile machine?
- Board installation and commissioning: board and machine axis consistent with the plane of the plane and the plane on the plane in the same plane, and the vibration table to maintain a certain distance to ensure that the pallet smooth from the vibration table to the delivery Board machine chain, for the
- Q: Analysis on the Problems of Cement Shade Machine
- construction process to meet the requirements. Discoloration of the substrate in the humidity is too high, water-soluble salt crystals in the surface weathering; substrate containing alkaline, infiltration of alkaline weak paint or paint film;
- Q: The processing method of the tile machine
- The billet is soft. Filter cloth part of the paste was dead, the next model of the local filter hole blocked, clean up. System without pressure, pump reversal: wiring error, adjust the steering. Insufficient power: motor failure or low voltage, power supply or repair motor. Oil pump temperature is too high: oil viscosity is too low, the pump is damaged, the cooling is insufficient or interrupted.
- Q: What are the advantages of cement tile machine?
- advanced and efficient. A new generation of equipment to add a remote control, diagnostic system, thousands of miles away on the operation of the data analysis, so that customers on the equipment maintenance easier.
Send your message to us
double layer roll forming machine
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 30days set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords