• metal roofing sheet molding machine System 1
  • metal roofing sheet molding machine System 2
  • metal roofing sheet molding machine System 3
  • metal roofing sheet molding machine System 4
  • metal roofing sheet molding machine System 5
metal roofing sheet molding machine

metal roofing sheet molding machine

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
20 sets unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

metal roofing sheet molding machine

Description

Introduction

Customer needs

Working  efficiency

8-10m/min

Thickness of Material

0.4-0.8mm

Can changed depend on your need

Width of material

914-1250mm

Control system

PLC

Uncoiler system

5Ton Manual Operation

1250mm width

Forming by rolling

13 rows

Roller material

GCR15 Aluminium processing after quenchin HRC58-62℃,Chrome plated

Shaft and the diameter of axle

45#Aluminium-processing diameter of axle=80mm

Main part power

5.5kw

Hydraulic motor power

3kw

Hydraulic pressure

12Mpa

Scissor material

Cr12Movherd steel HRC 58-62

length tolerance

±1.5mm

voltage

380V, 50HZ,3 phase

adjustable by customer needs

Frame form

arch type

Driving Method

Chain

Color

Yellow and blueadjustable

Size

length*Width*Height - 8.2*1.65*1.5m

Package

Nude package in 1*20GP container

Delivery date

60 working days

Payment Method

30% T/T in advance and balance 70% after inspection confirmation before shipment.

Payment terms

Price: FOB Tianjin new port

Payment: 30% T/T in advance and balance 70% after inspection confirmation before shipment.

Delivery: within 45 working days after receipt of deposit.


Warranty

1. One year, and we will provide the technical support for the whole life.

2. Training: the buyer should charge of visa, return ticket, food and accommodation overseas and USD50/person/day for salary.

3. Need one technician

4. Training time: one week (contains the time of installation and adjustment)

Q:What are the advantages of cement tile machine?
the use of advanced original, preferably configured. PC, machine, electricity, liquid, gas, integrated control, automatic control. Change the traditional molding machine "guide sleeve" as "four pole" precision positioning, machine performance is more stable and reliable, productivity, higher yield, more than similar foreign product level.
Q:The processing method of the tile machine
The billet is soft. Filter cloth part of the paste was dead, the next model of the local filter hole blocked, clean up. System without pressure, pump reversal: wiring error, adjust the steering. Insufficient power: motor failure or low voltage, power supply or repair motor. Oil pump temperature is too high: oil viscosity is too low, the pump is damaged, the cooling is insufficient or interrupted.
Q:What steps are required during the installation of the cement tile machine?
Host installation: the user in accordance with the size of the foundation map dug the foundation, according to the requirements of the drawings for the foot of the embedded hole or under the embedded iron with concrete pouring, for the installation of embedded holes into the anchor bolts (M24 × 360) and then Grouting, embedded iron can be a one-time cast into the installation and direct welding with the host, based on the plane must be level, the smaller the better the better.
Q:Analysis on the Problems of Cement Shade Machine
Pan alkali base water, alkali or salt content is too high, the water vapor will bring out the salt and the bottom of the film or surface precipitation; tile body alkaline, in the water after the alkali will be discharged through the pores, the formation of small bubbles. Remove all the affected and the loss of adhesion of the film, to be fully dry tile body, treated with oxalic acid and washed with water, dry and then brushing; follow the construction specifications, do grass-roots waterproof, to ensure that the substrate conditions meet the construction requirements. Gloss uneven uneven base layer is not uniform, the adsorption of the film is not high; film thickness is not uniform; the same side using different construction tools; the same side using different batches of products.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords