Double Layer Aluminum Flexible Duct
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 20000m m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Double Layer Aluminum Flexible Duct
Flexible Duct & Flexible Air Duct (Sigel Layer&Double Layer)
For Ventilation & Refrigeration With High Quality and Competive Price!
Introduction
Flexible Duct is widely used in Heating, Cooling, and Air Conditioning (HVAC) systems for air ventilation applications. Flexible Duct provides greater thermal efficiency to save energy. Because it is flexible,it is easy to run around and through obstacles in the building.
Flexible Duct Structure:
It is a multi-ply aluminum ducting with high tensile steel wire helix.
Double-layer aluminum foils +1 layer of PET film or single layer aluminum foil+ 1 layer of PET film.
Flexible Duct Usage:
1. Ventilation system, Extraction of solvents, Extraction of corrosive gas and fumes
2. Low pressure application, Transfer of hot and cold air, Air conditioning
3. Vehicle construction, Engine construction, Exhaust fumes extraction
Flexible Duct Specifications:
1. Multiply aluminum and pvc laminated
2. High flexible and compressible
3. Flame resistant & Heat resistant
Flexible Duct Features:
1. It's a range of fully flexible un-insulated aluminum PVC laminated ducting, it is easy to connect to ducting
2. Highly flexible
3. Excellent resistance to chemicals
4. Small bending radius
Flexible Duct Advantages:
1. No need special tools for cutting
2. In case of fire no toxic gas are emitted
3. The product have been successfully tested for fire resistance
4. Can be bent in any direction
Different sizes are avaible as required!
- Q: Such as the problem, and now air-conditioning technology is mature, the market a lot of air conditioning are cold and warm, and I would like to be able to put my home that the end of the century loaded Mitsubishi air conditioning (split single cold) into a cold Before the conversion of ordinary TV to the remote control, that air conditioning can be modified? How much does it cost? Where is this technology? More
- Air conditioning heating than the cooling power consumption, power consumption and ambient temperature and set the temperature has a great relationship, the general cooling 1 hour 1-2 degrees, heating if the auxiliary heating about 2-3 degrees. If you want to save the appropriate temperature can be set higher, the general and the ambient temperature difference of about 5 degrees people feel more comfortable, shut off undesirable, not reach the purpose of saving.
- Q: Air to water heater host and air conditioning host is not the same
- Issued a test report, Detection can be used to pass, failed to use!
- Q: Air conditioning ventilation when the sound is a big reason
- No matter, it is best to cut the distance between the material and the roof, like an arbor. Otherwise it is not foam board with it
- Q: Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
- Not the ,,, mobile air conditioning inside the compressor, the winter heating also need the compressor, but also a ventilation pipe, charged heating Well?
- Q: Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
- Of course, is heating electricity. Heating has auxiliary electric heating, so electricity and electricity. Frequently open the fee, the air compressor is not good. 2 machine cooling power is 1700 watts, 1 hour is 1.7 degrees electricity. Heating with auxiliary electric heating power of 1500 watts, 1 hour is 3.2 degrees electricity.
- Q: I added the space 18 degrees opened for 5 hours or not cold, we all know how is it? More
- The general level of more than 12 layers when you need to use.
- Q: What is the whole heat exchange fresh air ventilator?
- Second, the new insulation decorative board is integrated through the production line, set insulation, waterproof, finishes and other functions in one, is to meet the current housing construction energy needs, improve the industrial and civil building exterior wall insulation level of the preferred material, but also on the existing Building energy-saving transformation of the preferred materials
- Q: External wall insulation method of operation There are several combinations of materials
- Seeking the existing building construction specifications Daquan! The The @
- Q: In the design, the building structure and the hydropower are generally designed by the Architectural Design Institute. The air conditioning ventilation is based on the design of the room. Or first air conditioning ventilation? More
- Normal heat absorption is also due to poor ventilation (dirty) and air humidity so icing
- Q: HVAC Heating: What are the main components of the air distribution system?
- The reasons are the following: 1. Household electricity is not enough, can not start the compressor, so in the heating state can only be ventilated state, cooling the state directly jump electricity; 2. See if you are reported failure, Code to determine the need for on-site inspection in order to know the specific situation; 3. Four-way valve should be no problem, do not just believe that this is the problem Oh; help your words to adopt
Send your message to us
Double Layer Aluminum Flexible Duct
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 20000m m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords