cuplock scaffolding system with safety sandard for construction
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20000 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Packaging & Delivery
Packaging Detail: | Pallet |
Delivery Detail: | 20-30 days after order confirmed |
Cuplock Scaffolding
1.Comperticative price
2.Good bearing capacity
3.Stable& durable
4.Easy to assemble or dismantle
Specifications
Best price cuplock scaffold:
Steel Tube ScaffoldSystem,Ring System Scaffold,Steel Pipe Ring-Lock Scaffold
Product introduction
Luowen CupLock Scaffolding is a new type of scaffolding, it is researched, designed and developed referencing the advanced foreign technology of joint and accessories, good in quality and application.
Product features
1.Simple structure: The main parts include the standard, ledger and brace, it is easy to assemble and disassemble, and also easy to storage, transfer and maintain.
2.Safety and Steady: The up cup has the screw friction and self-gravity, it could self-lock steady, this makes the ledger steady, the loading of the ledger could transfer to the standard through the down cup, even the up cup is loose, the ledger joint could connect with the standard steady.
3.Multi using: According to the specific construction, Cup Lock Scaffolding could be assembled into one or two row with different size, it could also be used for multi construction tools, such as supporting frame, supporting column, materials lifting frame, stage supporting, etc.
4.High loading: The standard actuates axially, this makes the scaffolding in the three-dimensional space, high strength and steady of the structure. The cross plate is good at axial shearing resistant, and makes the axis of each pipe in one plate, so it improves 15% strength and steady performance.
5. Re-used: Luowen scaffoldings are made by high grade steel, they are not easy to damage or out of shape,so it could be used repeatedly.
Product name | Cuplock scaffolding |
Components | standard ,ledger,diagonal , top cup, bottom cup, Ledger Blade |
Material | Q235/345/195 |
Surface | galvanized, Hot dip galvanized, Painted |
color | red paint, blue paint, yellow paint, green paint, bright galvanized |
size | Steel pipe diameter is 48.3mm Thickness :2.75/3.0/3.2/3.25/4.0mm standard Length:0.5/1.0/1.5/2.0/2.5/3.0M Ledger length:0.6/0.9/1.0/1.2/1.5/1.8 |
usege | Our products are used widely in bridge, tunnel, petrifaction, shipbuilding, railway, airport, dock industry and civil building etc |
Packing | Bulk or Bundle with steel strip |
Size:
Standard Ø48.3×3.25 Q345 | Ledger Ø48.3×3.25 Q235 | Diagonal Ø48.3×3.25 Q235 | |||
Size/mm | Weight/kg | Size/mm | Weight/kg | Size/mm | Weight/kg |
500 | 3.45 | 600 | 2.54 | 1300×2000 | 9.21 |
1000 | 5.58 | 900 | 3.60 | 1800×2000 | 10.31 |
1300 | 7.97 | 1000 | 4.10 | 2500×2000 | 12.16 |
1500 | 8.74 | 1200 | 4.70 | ||
1800 | 10.60 | 1250 | 5.00 | ||
2000 | 11.38 | 1300 | 5.20 | ||
2500 | 14.00 | 1600 | 6.30 | ||
3000 | 16.63 | 1800 | 7.00 | ||
2500 | 9.54 |
- Q: Disc scaffolding used in the country?
- Will collapse a large, even the overall collapse, and higher costs
- Q: What kind of scaffolding used in engineering construction
- Scaffolding is a special type of work closely related to production safety. In the design and construction of steel tubular scaffolding in the implementation of national safety production policies, to ensure the safety of construction workers, do apply advanced technology, reasonable economy, safety, it must comply with the "construction of steel tubular scaffold safety technical specifications" (JGJ 130 - 2011) requirements, the new standard by the Ministry of construction in People's Republic of China Announcement No. 902, and in 2011 - 01 - 28 - 12 - 2011 approved 01 implementation.
- Q: I would like to ask those who know the specification scaffolding? Can you teach me?
- First, the role of scaffolding and requirements: 1, the role of scaffolding: (1)operating platform(2)Stacking material(3)Short distance horizontal transportation
- Q: Construction of the bowl button steel scaffolding and fastener type scaffolding which cost high
- Bowl button steel scaffolding is not commonly used, so the relative price of a little higher
- Q: A window washer is standing on a scaffoldsupported by a vertical rope at each end. Thescaffold weighs 145 N and is 3.02 m long.Assume the 675 N worker stands 1.28 m fromone end of the scaffold.What is the force on the rope farther fromthe worker?Answer in units of NWhat is the force on the closer rope?Answer in units of N.
- Force from scaffold alone = (145/2) = 72.5N. on each rope. 675/ ((3.02/1.28)) + 1) = 200.93N. on the further rope, and (675 - 200.93) = 474.07N. on the nearer. Total tension further rope = (200.93 + 72.5) = 273.43N. Total tension nearer rope = (474.07 + 72.5) = 546.57N.
- Q: the shop said i might have the wrong ear shape, does anyone know of any pictures or diagrams of the wrong shape so i can see. Also what are some do's and do not's. not like cleaning cos i've read loads of them, just anything else useful. thankssharotoxxx
- Hello You should have asked them I dunno whats that mean the wrong ear shape But you can always do a cartilage piercing, it looks a way better Good luck
- Q: I've had my industrial piercing for almost 5 years now and I was wondering if I was to take it out if it would close up or how long it would take to close. And after I take it out will it be noticeable that it was there.
- If you had it for 5 years it won't close up since its healed up. The holes on mine are pretty small but I have hair covering mine so you can't see it but I've only had mine a little over a month. I do have other piercing that haven't ha anything in for a while and they are not closed like my belly button and I got that done about 7 years now.
- Q: is it possible to have an industrial piercing done in 2 stages? so like 1 hole first and then a few weeks later the 2nd hole done. ive found a place that for 2 holes is cheaper than having the whole process done as one. Please help :)
- yes it is possible. I know people who have done that. But I suggest getting it done at once because it will hurt less in the long run. Getting your cartilage done hurts for about 2 weeks and then get the top part done that is another 2 weeks. So to get it done together it will only hurt for 2 weeks in instead of 4.
- Q: A window washer is standing on a scaffold supported by a vertical rope at each end. The scaffold weighs 190 N and is 3.30 m long. What is the tension in each rope when the 710 N worker stands 2.30 m from one end?smaller tensionN?larger tensionN?
- If the scaffold weight is uniformly distributed, each rope will support one half of the weight. Left reaction = 95N Right reaction = 95N The 710N worker is standing closer to one end (assume left). Sum moments about the left end = 0 1m * 710N - 3.3m * Right reaction = 0 Right reaction = 710/3.3 = 215.2N Sum forces in Vertical direction = 0 Left reaction = 710 - 215.2 = 494.8N Sum all forces Left reaction = 95N + 494.8N = 589.8N larger tension force Right reaction = 95N + 215.2N = 310.2N smaller tension force
- Q: How can you scaffold so that they construct their own meaning about a religious perspective on current events?
- Introduce the basic tenets of several major religions, then work through the historical contexts, and finally, explain your religion's belief system. Good Luck....
Send your message to us
cuplock scaffolding system with safety sandard for construction
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20000 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches