• Cuplock Scaffolding Parts for Construction High Quality Hot Dip Galvanized Steel System 1
  • Cuplock Scaffolding Parts for Construction High Quality Hot Dip Galvanized Steel System 2
Cuplock Scaffolding Parts for Construction High Quality Hot Dip Galvanized Steel

Cuplock Scaffolding Parts for Construction High Quality Hot Dip Galvanized Steel

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
100000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Cuplock Scaffolding Parts for Construction High Quality Hot Dip Galvanized Steel


Quick Details

Place of Origin:

Tianjin China (Mainland)

Brand Name:

YH

Model Number:

YHSY-CS

Surface treatment:

galvanized or painting

Certificates:

ISO9001, BV, SGS

MOQ:

1 TON

Company type:

manufacturer

Advantages:

customise sizes as to drawings

Waranty:

30 years

Cuplock Scaffolding Parts for Construction High Quality Hot Dip Galvanized Steel

Cuplock Scaffolding Parts for Construction High Quality Hot Dip Galvanized Steel

Cuplock Scaffolding Parts for Construction High Quality Hot Dip Galvanized Steel



Packaging & Delivery

Packaging Detail:

export standerd package or as customer's requirements.

Delivery Detail:

10-25 days after receipt of deposit


Specifications

high quality hot dip galvanized steel cuplock scaffolding parts 
OD: 48.3 mm 
WT: 3.25-4 mm 
Grade: Q195, Q235, Q235B 
Moq:1ton

FAQ

1) What can we do for you?

    We can ensure the quality of the vinyl banner and avoid extra expenses for customers.

    We can provide you the professional design team.

    We can provide fashionable and newest styles for you.

    We can design the artwork for you.

    Please feel free to customize.

 

2) What promises can be done by us?

    If interested in Aluminum-Frame Formwork, please feel free to write us for any QUOTE.

    If printing required, please advise asap because the whole set need much more time to complete.

    Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

    Response will be carried out in 24hours  after receiving any complain or request.

    Aluminum-Frame Formwork cost can be refund after order is confirmed.

    If the products are not based on the requirements, there will be the relevant compensations made for you.

 

 4) What about the package and shipping time?

    Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers,

such as express which including TNT, DHL, FEDEX, UPS, EMS, etc. By air/ sea, and we are VIP of these express.


FAQ:

Why Us?

We are one of the Top 500 companies in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team.


Q: Can any one tell me about different types of scaffolding? Especially about tubular and frame scaffolding. If you can tell me about the components using in scaffolding also, that would be appreciate. Please give me some useful links too. Thanks in advance.Regards,Just A Guy
Sorry I don't have links.But I have had the tube type for over 20yrs.The components are :cross bar decks or planks leveling pads scaffold ends(thats what we called them) You should be able to call your local rentall place and find out where you can purchase some or you might be able to purchase theirs at a good price.One more piece you may want to consider depending on how high you go is called a wall tie.always make sure your scaffold is level both ways!it makes a difference when you start to stack or tie together in a string.goodluck
Q: Height in the number of scaffolding should be set up scissors
6 cross when the time is 45 degrees, across the 5 span of 50 degrees, across the 4 span of 60 degrees. The length of the connecting rod is required to overlap, the overlap length is not less than 1M, the use of three fasteners is evenly distributed, the end of the fastener is not less than 10CM.
Q: why the scaffold nned to be inspected within the preceding seven(7) days?
To make sure that it is constructed properly and things haven';t slipped out
Q: Floor type scaffolding construction program is what kind of, what role?
The role and requirements of scaffolding:1, the role of scaffolding:(1) operating platform(2) stacked materials(3) short distance transport
Q: Hi guys!...ive had a scaffold piercing for a little over 2 weeks and when i got it done it bled quite alot...this obviously made some scabs...but every time i clean it the scabs come off and its starts bleeding again...and just before i posted this i found abit of puss like fluid round the back of it!I clean it twice a day and avoid touching it What have i done wrong :(Plus my mum is now like quot; i told you so quot; LolCheers :)
Ear cartilage piercings generally take longer to heal than lobe piercings. This is often due to a combination of things, such as the location of the piercing in the cartilage, the type of jewellery used and the tension that jewellery creates to the structure of the cartilage. Using biocompatible plastics (like PTFE), cleaning cartilage regularly, and increasing your intake of minerals will certainly benefit your piercing; however a piercing will almost always be doomed to failure if improper jewellery and poor planning are used and left unmonitored.
Q: Hi my next door neighbours are building an extension to their house. The builders asked if we would allow scaffolding to be placed on part of our driveway. Now, these builders are taking too long and the builders attitude is rude when questioned how long they gonna take to finnish. If we want the scaffolding to go, what righs have we got as we gave verbal permission to the builders to have it put up by scaffolders and the planned extension not yet completed?
mom says more rights than the neighbor since they are taking too long to finish its in your favor - it is your property not the contractors mom would make a comment like this to that rude contractor since you have left this scaffolding abandoned in my drive way for a month (whatever time) i am sure that when you return in the morning someone else will have removed it for me since your permission time has long expired and you have been repeatedly asked to remove it - so if you value your equipment investment it will be gone before supper tonight - AM I UNDERSTOOD !!! (that last part would be really loud and right in his face, probably with a finger poke in the chest) then when they don't remove it be prepared with wrenches and a pick up truck to remove it before their return in the morning - stashing it out of sight but on the property when they question you about the missing scaffolding you can offer to rent one to them that was abandoned in your driveway for $500.00 dollars a day (she would smile her prettiest smile when she said this) be prepared for a fuss - but they had their chance - stand your ground that's how mom rolls - she plays for keeps - not many cross her - when they do they quickly regret it - she would have it in small pieces in front of their eyes, but she suggests the first description for you - mom is tough but incredibly fair - the rules are the rules for a reason whether you like it or not, or anybody else for that matter
Q: Okay, so I got a scaffolding/industrial piercing today I'm really happy with it. Now all I'm wondering about is cleaning it. People have recommended that I bathe it in salt solution for a few minutes each day to keep it clean soothe it. I have a couple little syringes, minus the needles, that my dad brought home from work, (he's a nurse). They are completely sterile, infact new out of the packet. Would squirting the salt solution directly onto the piercing wounds be equally good to clean it ? Or does anyone else have any suggestions for taking care of said piercings ?
No, squirting piercings with solution is never as beneficial as actually submerging them in the stuff. In my opinion, leaving the piercing alone and giving it sea salt soaks are the best methods for helping it heal.
Q: A window washer is standing on a scaffold supported by a vertical rope at each end. The scaffold weighs 190 N and is 3.30 m long. What is the tension in each rope when the 710 N worker stands 2.30 m from one end?smaller tensionN?larger tensionN?
If the scaffold weight is uniformly distributed, each rope will support one half of the weight. Left reaction = 95N Right reaction = 95N The 710N worker is standing closer to one end (assume left). Sum moments about the left end = 0 1m * 710N - 3.3m * Right reaction = 0 Right reaction = 710/3.3 = 215.2N Sum forces in Vertical direction = 0 Left reaction = 710 - 215.2 = 494.8N Sum all forces Left reaction = 95N + 494.8N = 589.8N larger tension force Right reaction = 95N + 215.2N = 310.2N smaller tension force
Q: How can you scaffold so that they construct their own meaning about a religious perspective on current events?
Introduce the basic tenets of several major religions, then work through the historical contexts, and finally, explain your religion's belief system. Good Luck....
Q: What are the hidden dangers of scaffolding
Collapse is the biggest hidden danger scaffolding. Countermeasures to prevent and prevent the collapse of the scaffold: 1 must not be "empirical" in the daily enterprise construction process, some enterprises use "empiricism", do not carry out specific accounting. Timberman no license, is still "empiricism", scaffolding system does not have a scientific guarantee, the collapse is inevitable. For steel scaffolding, should be in accordance with the "construction of steel tubular scaffold safety technical specifications" (JGJ1302001), for scaffolding, should be in accordance with the cuplok scaffolding component (GB24911-2010) and JGJ 166-2008 construction cuplok Scaffolding Safety Technical specification, the scaffolding should be in accordance with the "construction steel scaffolding safety technology standard" (JGJ 128-2010), other types of scaffolding should also refer to the relevant standard.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches