1. Structure of Whole Aluminum Formwork
Whole Aluminum Formwork is invented because of its light weight and one time casting and makes it possible to save cost when it comes to pouring of concrete in construction site. It consists of very standardized forms and multiple sizes of wall, beam and column types.
2. Main Features of Whole Aluminum Formwork
◆ Lighter weight but high bearing capacity.
◆Manual transportation can be achieved, greatly reduces the aggregate cost.
◆Perfect design, excellent produce and well welding make sure the flatness of concrete surface.
◆It is with the advantages of standard design, excellent applicability and interchangeable.
◆Simple, safe and fast.
◆No rust corrosion, easy maintenance, and high turnover rate.
◆The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project.
3. Whole Aluminum Formwork
4. Whole Aluminum Formwork Specifications
5. FAQ of Whole Aluminum Formwork
1) What can we do for you?
.We can ensure the quality of the Whole Aluminum Formwork and avoid extra expenses for customers.
.We can provide you the professional technical team.
.We can provide professional building proposal for your projects.
2) What promises can be done by us?
. If interested in this kind of Whole Aluminum Formwork, please feel free to write us for any QUOTE.
. If need any technical and building assistance, we could provide on-site professional staff for instruction.
. Please DO check goods when courier knocks your door and contact us asap if any issueS.
3) What about of our after-sale services?
. Response will be carried out in 24hours after receiving any complain or request.
. Any formwork cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
4) What about the package and shipping time?
.Packing: wood package and adhesive tape
.Shipping: by sea
Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.
- Q: Construction Engineering, moving equipment and stationary equipment, respectively
- 1, moving equipment refers to the rotating device driven by the drive (that is, energy consumption of equipment), such as pumps, compressors, fans, etc., the energy can be electric power, pneumatic power, steam power, etc..
- Q: What are the mixing arms of the concrete mixer?
- Mixing arm concrete mixer is a component of the mixing arm itself and divided into lateral mixing arm (positive and negative points), stirring arm (also have positive and negative points), stirring arm below is the bearing seat connected, connected with 4 sets of high strength bolts with stirring arm. The top is equipped with wear-resistant mixing blades, connecting with mixing blades, high-strength bolts 2 sets. In addition, some manufacturers have designed mixing side bonded shaft swivel, is installed in the interval between the stirring arm fixed and rotated in two ways.
- Q: What is the use of spare parts prices in Chinese market by foreign companies?
- But there is always somebody to ask, just like a college paper, where everyone can read or keep secrets, but collecting them and sending them to foreigners is a sign of treason
- Q: How are the machine parts stacked?
- Then there is a point to note, that is, from there to get used, must be put back where, so that will be organized, all things are owned by you, it will not mess.
- Q: What kind of electrical equipment do you have? What are the main components of each device?
- Electrical equipment, electrical parts, electrical equipment, electrical components: mainly refers to other construction equipment matching, power driven, electrical heating, electrical lighting, and other direct consumption of electricity and into other parts of energy. Such as: motor and electric heater and start control equipment, decorative lighting lamps and the switch socket, television communication and intelligent engineering for power supply and transformation or environmental protection dust and kitchen fume and other special DC power supply etc.
- Q: Where are the mechanical pressurization air supply facilities set up?
- When the smoke proof staircase and antechamber antechamber, fire elevator or common antechamber parts can be opened outside the window, can use the natural ventilation, resulting in a stairwell with or common antechamber in the use of natural smoke exhaust with pressurized air supply arrangement of diversified combinations, and the two exhaust can not be shared.
- Q: What are the world famous mechanical equipment exhibition?
- 2 、 Las Vegas Construction Machinery Exhibition (Conexpo-Con/Agg) sponsored by the American equipment manufacturers association, the American precast concrete association, the United States sand association. It is the world's second largest construction machinery exhibition after BAUMA. The exhibition, sponsored by the American Association of equipment manufacturers, has been held every three years for nearly a hundred years. The next exhibition will be held on March 2017 7-11. The exhibition is of great size and numerous merchants. It has focused on world famous brands such as Caterpillar, Komatsu, Liebherr and Volvo. It is an important platform for displaying the latest technology, equipment and products in the industry.
- Q: Construction machinery production need to deal with what documents?
- The person in charge of the enterprise, the person in charge of the project, full-time safety management personnel in "safety assessment qualified" column content according to the "three persons" Safety Assessment Certificate (fill in the contents of enterprise work safety management staff should meet the enterprise production safety management, the safety management department staff with the qualification to the total contract for not less than 5, not less than 3 professional contracting labor subcontracting, not less than 1; the construction site should be equipped with full-time safety management personnel according to the project size can be determined, according to the construction area of less than 10 thousand M2 project has at least a part-time staff of more than 10 thousand M2; project 1 - 2 full-time staff; more than 50 thousand M2 large sites, according to different professional safety management group);
- Q: What is a door rack for a construction site? How high is it generally?
- Construction machinery network learned that the door scaffolding in our country production and use of time is not long, the scaffolding developed by the various research institutions, self-contained, and not common, varieties, specifications and diverse. Some factories copy foreign products and use the imperial size.
- Q: Mechanical bearings, all types? Roughly
- The most representative rolling bearings, widely used, can bear radial load and two-way axial load. For high speed and low noise, low vibration occasions with steel dust cover or seal type bearing rubber sealing ring in pre filled with the appropriate amount of grease, the outer ring stopper bearing ring or flange, namely axial positioning, and easy to install in the housing. The size of the maximum load type bearing is the same as that of the standard bearing, but there is a loading groove in the inner and outer rings, which increases the number of balls loaded and improves the rated load.
Send your message to us
CONSTRUCTION FORMWORK SYSTEMS OF Aluminum-Frame Formwork
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 10000000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords