• Aluminum-Frame Formwork in CONSTRUCTION FORMWORK SYSTEMS System 1
  • Aluminum-Frame Formwork in CONSTRUCTION FORMWORK SYSTEMS System 2
  • Aluminum-Frame Formwork in CONSTRUCTION FORMWORK SYSTEMS System 3
Aluminum-Frame Formwork in CONSTRUCTION FORMWORK SYSTEMS

Aluminum-Frame Formwork in CONSTRUCTION FORMWORK SYSTEMS

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
10000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1. Structure of  Whole Aluminum Formwork Description 

Whole Aluminium Formwork System is designed to reduce material quantity, erection and dismantling time as well as effort, subsequently increasing efficiency and reducing general construction time, materials and labour cost. All main components are manufactured from high grade aluminium alloy. This structural grade aluminium has exceptional properties being extremely light in weight but also heavy-duty and durable. When incorporating this into a design which utilizes standard components and allows several possible plan and elevation variables, it provides a lightweight solution for a large area slab formwork system.

 

2. Main Features of  Whole Aluminum Formwork

-Light and easy assemble

-Simple structure.

-Competitive prices

 

3. Whole Aluminum Formwork Images

Aluminum-Frame Formwork in CONSTRUCTION FORMWORK SYSTEMS

Aluminum-Frame Formwork in CONSTRUCTION FORMWORK SYSTEMS

Aluminum-Frame Formwork in CONSTRUCTION FORMWORK SYSTEMS

Aluminum-Frame Formwork in CONSTRUCTION FORMWORK SYSTEMS

Aluminum-Frame Formwork in CONSTRUCTION FORMWORK SYSTEMS

4. Whole Aluminum Formwork Specifications

1: MaximumColumn Size:900 x 900mm

(2’-11.5”x 2’-11.5”)

2: DesignConcrete Pressure: 1,800 psf (90 kN/m2)

3:StandardPanel Width 900mm, 750mm & 600mm

(2’-11.5”,2’-5.5” & 1’-11.5”)

4:StandardPanel Height: 3.0m, 2.4m, 1.2m

 

 

5.FAQ of  Whole Aluminum Formwork

 

1) What can we do for you? 

    .We can ensure the quality of the Whole Aluminum Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your project.       

    . Please feel free to customize.  

 

2) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issueS.

 

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

-Packing: wood package and adhesive tape

-Shipping: by sea

     -Shipping time: Normally small orders just takes 7 business days to arrive your hand;. When it comes to the customs declaration, it may need 2weeks.

 

 

 

 

 


 


 

aluminium frame  aluminium formwork 

Specifications

aluminium frame  aluminium formwork 
1.Easy to handle 
2.Reliable Strength 
3.Monolithic Pouring 
4.Fast Speed

Introduction of  aluminium frame  aluminium formwork 

Material

6061-T6 Aluminium alloy

 

 

Main Components

Beam

column

wall

Prop

Others

 

Applications

Exhibition setup

Interior refurbishing

All the towers can be connected together for multi-purpose

Safe working load

60KN/m2

Size

Non-standard: custom-made as per buys requirements

 

 

Features

Easy to Handle

One-time Pouring

High Concrete Pouring Rate

More Reuses

Great Recyclable Value

Environmental Friendly


 

 

Q: What are the mixing arms of the concrete mixer?
Concrete mixer parts often due to operational mistakes and equipment damage, we should know that the correct use of Yantai mixer parts, mixing arm not only can complete the "workload" on time, but also to extend the service life
Q: What are the details of construction machinery parts in sand casting?
Lighting distribution box and other small appliances, slot box, detection control device, air inlet, bell, industrial TV, muffler and its components, dust removal equipment, and the communication line at the same time, a combination of the components installed. (4) refractory used for masonry at site.
Q: What are the sectors of machine building and parts processing?
Industry to classify, it is not very strict. For example, the insurance industry, mining, energy, food, hotels, real estate services industry, garment industry, advertising industry, aerospace, aviation, chemical, chemical, construction, health care, education, training, computer, metal smelting, fire, police, soldiers, accounting, beauty, body, media, publishing, wood, paper retail, wholesale, agriculture, tourism, justice, lawyers, sports, sports, arts, entertainment, medical, art, design, banking, finance, Internet, music, dance, postal, courier, transport, consulting services.
Q: What measures can effectively reduce the construction accident rate?
Hefei construction workers training _ security technology to prevent accidents: prevent the basic starting point of safety accidents is to take measures to restrict energy and dangerous material, to prevent the accidental release. Common safety techniques for preventing accidents are eliminating dangerous sources, limiting energy or dangerous substances, isolating and so on.
Q: How are the machine parts stacked?
Then there is a point to note, that is, from there to get used, must be put back where, so that will be organized, all things are owned by you, it will not mess.
Q: What type of industry does the machinery and building accessories processing belong to?
Every industry has average tax rate, the contribution of each this argument does not exist, the industrial enterprise is nade VAT. The more value-added products you pay more.
Q: How are buildings, installations and materials divided?
Equipment generally includes the following: (1) all kinds of equipment and the equipment with the arrival of accessories, spare parts and equipment attached to the body made of ladders, platforms, railings and pipes. (2) various gauges, instruments and automatic control devices, experimental instruments, instruments and meters in the main part of the equipment. (3) components of equipment, such as oils, chemicals, etc. attached to the equipment body.
Q: Where does Heilongjiang do the most construction machinery?
It is mainly used for national defense construction project, the construction of transportation, energy industry construction and production, mining and other industrial raw materials, construction and production, forestry and water conservancy construction, industrial and civil construction, city construction and environmental protection.
Q: Where are the hanging baskets for the building?
It is forbidden to take a stool or put a ladder on a hanging basket to work higher; it is not allowed to work alone in a basket, and no electric machinery or equipment can be placed in the basket;
Q: What functions should be achieved in mechanical structure design?
The main features of the mechanical structure design are: (1) it is a set of thinking, drawing and calculation (sometimes necessary experiments) in one of the design process, is involved in machinery design, the most specific, the largest volume of work, in the whole process of mechanical design, an average of about 80% of the time for the structure design plays an important role in the success of mechanical design. (2) the multi solution of mechanical structure design, that is, the mechanical structure that satisfies the same design requirement, is not the only one. (3) the mechanical structure design stage is a very active design link, often needs to cross repeatedly. Therefore, in the design of mechanical structure, it is necessary to understand the basic requirements of the mechanical structure from the whole of the machine

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords