• CONSTRUCTION FORMWORK SYSTEMS for Timber Beam Formwork System 1
  • CONSTRUCTION FORMWORK SYSTEMS for Timber Beam Formwork System 2
  • CONSTRUCTION FORMWORK SYSTEMS for Timber Beam Formwork System 3
CONSTRUCTION FORMWORK SYSTEMS for Timber Beam Formwork

CONSTRUCTION FORMWORK SYSTEMS for Timber Beam Formwork

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
10000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of Timber Beam- Column Formwork Description 

Timber beam column formwork is used for the concrete pouring of column structure. The application of flexible column formwork has greatly increased the construction efficiency and reduced the cost. It made it possible to construct different project parts as Lift, or Stair use. The system is convenient for construction and it is easy to control the quality. The formwork is made of plywood, timber beam and steel waling. Pull-push props can be designed according to the project or simply select the standard props. Tie-yoke and tie-rod are used to reinforce the corner.

 

2. Main Features of Timber beam column formworks

- Component with high standardization.

- Assembling in site, flexible application.

- Light weight, easy transportation and storage.

3. Timber Beam Column Formwork Images

                                             

 

 

4. Timber Beam Column Formwork Specifications

Timber beam column formwork is used for the concrete pouring of square or rectangle column. The system has the same structure and similar connection type with wall formwork.

 

5.FAQ of  Timber Beam Column Formwork

 

1) What can we do for you? 

    .We can ensure the quality of the Timber Beam Column Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.        

 

2) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issueS.

 

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  



Q: Construction Engineering, moving equipment and stationary equipment, respectively
1, moving equipment refers to the rotating device driven by the drive (that is, energy consumption of equipment), such as pumps, compressors, fans, etc., the energy can be electric power, pneumatic power, steam power, etc..
Q: What are the sectors of machine building and parts processing?
3., machinery manufacturing is also a kind of industry, many industries have parts manufacturing, processing links. Therefore, the processing of parts does not belong to a particular industry.
Q: Building materials, equipment, components and fittings products must have "three certificates" is what cards?
Product qualification certificate means the qualified certificate, qualified label or qualified seal issued by the manufacturer to indicate the quality of the products manufactured by the factory and qualified on the package of the product or product. This is the producer's guarantee of the quality of its products, and also the obligation of a product to be stipulated by the law.
Q: How are the machine parts stacked?
Then there is a point to note, that is, from there to get used, must be put back where, so that will be organized, all things are owned by you, it will not mess.
Q: Definition of large mechanical equipment?
Depending on the size of the part to be machined, the parts must be set up as large equipment with the aid of a crane, and large machinery is usually assembled after the parts have been delivered to the destination. Material handling machinery is mainly in enterprises (including terminals, materials, mines and commercial warehouses, etc.) within the material handling, transportation, lifting, stacking and storage of machinery and equipment
Q: Where are the mechanical pressurization air supply facilities set up?
When the smoke proof staircase and antechamber antechamber, fire elevator or common antechamber parts can be opened outside the window, can use the natural ventilation, resulting in a stairwell with or common antechamber in the use of natural smoke exhaust with pressurized air supply arrangement of diversified combinations, and the two exhaust can not be shared.
Q: China mechanical net
From Chinese GM parts, general machinery, hardware, tools, instruments, electrical appliances and related equipment, textile equipment, chemical equipment, agriculture, food equipment, construction equipment, environmental protection equipment, mining equipment, metallurgical equipment, financial equipment, commercial vehicles and accessories, machinery processing equipment, machinery processing industry machinery enterprises and mechanical products
Q: Construction machinery production need to deal with what documents?
At all levels of production safety responsibility system, mainly refers to: the legal representative of the safe production responsibility system; the responsible person in charge of safety production safety responsibility system; the technical director (Chief Engineer) production safety responsibility system; the safety department (Department) Changan production responsibility system; responsibility for production safety, the project manager; specifically (and) post safety responsibility system for production safety; construction technician (technician), safety production responsibility system; 8 class (Group) Changan production responsibility system; workers, production safety responsibility system. Departments responsible for production safety system, mainly in accordance with the functions of enterprises set up departments, the corresponding formulation of the responsibility system for safety in production.
Q: Mechanical bearings, all types? Roughly
The basic structure and NU type cylindrical roller bearing inner ring bearing the same, but because of the needle, the volume can be reduced, and can bear large radial load to the bearing without inner ring shaft mounting surface with suitable precision and hardness is used as a raceway.
Q: Where are the hanging baskets for the building?
It is strictly prohibited to use hanging baskets as vertical transport facilities for personnel and materials; no staff member is allowed to climb from a basket to a B basket

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords