Concrete Slab with Iron Wires Making Machine
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 5 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Concrete Slab with Iron Wires Making Machine
1. Structure of Concrete Slab with Iron Wires Making Machine:
Precast Floor Tile Panels Forming Machine works on the long-line table, using the high-strength low-relaxation steel strand as the guide, using the pushing work method to forming the concrete hollow-core slab. The slab have the advantages of smooth surface, high-density structure, capable of making construction slabs of 4.2m to 18m. The GLY series concrete hollow-core slab mainly used on the larger bay workshop, school, hospital, shopping mall, office building, bulk storage plant etc.
2. Main Features of Concrete Slab with Iron Wires Making Machine:
• One machine can make one slab lower cost, high Wear-resistant, long service life.
• In case of quality problem the company provide free replacement.
• Provide technical support for free.
• Provide consumers with regular visits
• Simple structure, easy operate, less wear parts
3. Concrete Slab with Iron Wires Making Machine Images:
4. Concrete Slab with Iron Wires Making Machine Specification:
Type | Aperture & diameter | Number and diameter of wires | Max span | Total power | Productivity (m/min) | Max. Load (KN/m2) | Overall dimension (mm) | Weight (kg) |
GLY180-1200 | 11/ peach | 12/9.5or12.7 | 9 | 18.5 | 1.1-1.3 | 16.16 | 2900X1500x1200 | 3300 |
GLY200-1200 | 8 /peach | 10/9.5or12.7 | 10 | 22 | 1.1-1.3 | 13.22 | 3700X1550X1550 | 5300 |
GLY250-1200 | 8/ peach | 10/12.7 | 12.6 | 33 | 1.1-1.3 | 11.1 | 3700X1550X1500 | 6200 |
GLY300-1200 | 6 /peach | 8/12.7 | 15 | 40 | 1.1-1.3 | 10.83 | 3700X1550X1500 | 6900 |
GLY380-1200 | 8 /rhomb | 8/12.7 | 18 | 39.2 | 0.8-1.0 | 12.27 | 4600X1850X1600 | 7500 |
Production Process
Rebar tensioning
Raw materials preparing
Molding
5. Packing & Delivery
• Wire cables are used for fastening the machine on the trailer or inside the container.
• Machine covered with plastic film.
• Machines can be packed in tarpaulin or wooden case according to customer’s needs.
6. FAQ:
We have organized several common questions for our clients, may help you sincerely:
• What information we need to confirm with you before send a formal offer?
What kind of slab you want to make, wall panel, roof panel, lintel or something else?
Do you have exact slab size (slab thickness and width)? If not, please tell us the slab span, we will give you suggestion.
• Have you use this kind of machine before?
Our machine is totally different from European machine. Please don’t follow their instructions.
• How long can we receive the product after purchase?
In the purchase of product, within 20 working days we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 35 working days can be served.
7. Why choose us:
• 30 years manufacturing experience.
• Constitutor of the
• More than 10 patents.
• Passed ISO9001:2000 quality system certificate.
• More than 10 types of machine and over 100 models for choose.
• Supply complete set of technology and equipment solution.
• We can design and manufacture all kinds of concrete forming equipment according to customers' demands. Meanwhile we can even more provide our customers a complete set of technology and solution for all producing flow.
8. Our Service:
• We supply the technical supporting all the time.
• We supply one year warranty for whole machine.
• We supply free quick wear parts.
• We supply low charge continue maintenance when warranty is expired.
• We supply free training to end-users
- Q: it has for wheels and u can move around int it .... i can not think of its name!! PLEASE HELP =0
- There's okorder /
- Q: A ers' wagesB.machineryC.trainingD.marketing
- Output = swifter, greater helpful production approaches. for this reason, equipment. workers have been extremely replaced. advertising and marketing got here later. assembly line sort artwork necessary little or no qualifications. B. .
- Q: Is there any common pattern between the two?While several ultra-Islamist countries have draconian laws to punish everyone who slanders god, CCP is known to punish everyone who slanders the Chinese Communist Party. CCP often resorts to informal detentions, punishments and disappearances which are completely outside the law, and so offer the government deniability and the victim no protection whatsoever.Do the Chinese people find any commonality between the Blasphemy Laws practiced in Islamist countries and the draconian policies of CCP?
- Have you also noticed that these religious fanatics use God to justify their actions rather than the laws that benefit the people? It is similar in that China uses the welfare of the state rather than a god to get to the same end, and that is domination of the masses.
- Q: Please introduce a link that explain these functions in a list or categorical. I would prefer new and interesting functions.Thank you
- Fluid okorder /
- Q: I have tried so many things, but I cannot figure out how to do this. I need to wrap one fabric around a different fabric. My problem is that it not only wraps the fabric, but it gets stuck on the bar and wraps around it as well. Are there any machines that can wrap fabrics together?
- sewing machine
- Q: Do engineering technicians get to invent and patent ideas within large companies, or is this typically reserved for the mechanical engineers?
- Anyone can patent machinery. The question is, will a company be willing to pay a technician to spend his time inventing? Probably not. As a prior post indicated, the responsibility for solving the porblem, at least theoretically, usually belongs to the engineer. In good engineering teams, the problems are solved by more than one person. To that end if the idea is patented, everyone's contirbution should be documented. It usually comes down to a company's willingness to risk the cost of a patent on the potential payback. Fo that sort of risk assessment, they want to undertsand the magnitude of the gamble. Engineers are pretty good at detailing what the risks are and getting the approval for patents.
- Q: I need a list of machinery, and the methods of how trees are cut down. Do they only use chainsaws? or are there bigger machines that cut faster and better? plz answer, im trying to create an accurate scene in a painting ( im in the planing stages).
- I'm okorder /
- Q: He plans to invest $20 000 every six months in an investment account with a view to replacing machinery. What interest rate will he need to meet his goal?(either use present formula A= P *(1-(1+i)^(-n))/ i or future formulaS = P *( (1+i)^(n) - 1)/ i, im not sure wich formula to use)PLEASE SHOW ALL WORKING OUTplease help me ITS URGENT
- 250000=20000 *( (1+i)^(n) - 1)/ i i=4.88%
- Q: Material processing technology and machinery manufacturing What is the relationship
- Parts of the various processing, heat treatment and surface treatment; parts and product assembly, commissioning, testing and coating and packaging.
- Q: what do companies benefit from when upgrading machinery?
- Depends what you mean by upgrading. A business can upgrade existing machinery to perform faster, better, etc or they can purchase a new machine to replace an older one. With upgrading the business is looking at increasing output, reducing operating costs and improving the efficiency of the machine. A new machine will potentially return less downtime due to breakdowns, but may have teething troubles whilst it settles in. New machinery will have costs involved, not only the purchase cost, but cost of spares, cost of training to operate and maintain, and depreciation. Hope this helps
Send your message to us
Concrete Slab with Iron Wires Making Machine
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 5 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords