Concrete Pump Truck Professional Supply Camc of 39meters
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Concrete Pump Truck Professional Supply Camc of 39meters
Product Details
Basic Info.
Model NO.:AH5290THB
Type:Concrete Pump
Shotcrete Type:Wet
Machining Process:Hydraulic
Structure:Rotor Type
Productivity:60㎡/h
Feeding Height:1370mm
Vibrating Amplitude:1.6mm
Certification:ISO9001: 2000, CE
Condition:New
Color:Green
Driving:Left or Right Possible
Export Markets:Global
Additional Info.
Trademark:CAMC
Packing:Nude
Standard:SGS, GOST
Origin:China
Production Capacity:500, 000 Unit/Year
Product Description
Complete Model | AH5290THB(39m) | ||
Chassis Model | HN52900P35E2M3J | ||
Drive Style | 6X4 | ||
Emission Level | EURO 3/2 | ||
Kerb Mass | 29000kg | ||
Overall Dimentsion | Total Length | 12440mm | |
Total Width | 2495mm | ||
Total height | 3930mm | ||
Engine | Model | 6WF1D | |
Power(kw/(r/min)) | 287/1800 | ||
Performance | Max Rated Delivery Volume | 120m3/h x 62kgf/cm | |
Concrete Cylinder | Bore | 230mm | |
Stroke | 2000mm | ||
Type of Discharging Vavle | S Valvle | ||
Feeding Bucket | Volume | 0.6m3 | |
Height of Ground Clearance | 1370mm | ||
Washing System | Volume of Water Tank | 600L | |
Water-supply Flow Volume | 80L/min | ||
Water-supply Pressure | 40bar | ||
Boom | Type | Mixing Style Folding Type | |
Max Height of Ground Clearence | 39m | ||
Max Horizontal Distance(From the Rotating Center) | 35.2m | ||
Max Depth | 26.5m | ||
Rotating Angle | 365 | ||
End Frame | Lateral Span Front | 7390mm | |
Rear | 7763mm | ||
Lontitudinal Span | 7976mm | ||
Hydraulic System | Return Type | Full-hydraulic Control | |
Hydraulic Fuel Tank | 600L | ||
Hydraulic Oil Pump(model pressure) | Germany Rexroth 290Bar | ||
Control Means | Full-hydraulic Control | ||
Operationg Means | Manual Operating, Remote Control |
- Q: What is the difference between a concrete pump and a valve?
- the current domestic production is all S valve series. Now there are special high-grade concrete S-valve pump
- Q: Whether the concrete pump can pass the height of 3.75 meters
- The concrete pump is retrofitted on a truck chassis, which is equipped with a sports and powertrain, a pump and a stirrer, a cloth, and other auxiliary devices on the chassis.
- Q: How the concrete pump truck is fuel tank?
- The hydraulic oil (transfer oil) drives the piston movement of the other main cylinder (passive cylinder) by connecting the tubing but causes leakage of the oil due to wear. When the active cylinder piston is running to the bottom, the piston of the passive cylinder has not yet run
- Q: What are the drawbacks of concrete pump gate valve and S pipe valve?
- In addition to the use of gate valve delivery, but also requires the vertical transport pipeline in front of the installation of a horizontal transmission pipe section, the length of concrete lifting height of 1 /
- Q: What is the main composition of concrete pump
- Concrete large transport equipment, for high-rise, high-speed, overpass and other large concrete concrete concrete work.
- Q: Will the role of concrete towing pump, concrete raw materials are sand or sand?
- Production of concrete raw materials are sand, which also cement, admixtures, stones, fly ash and so on.
- Q: What is the diameter of the concrete pump tubing?
- Pump tube is generally divided into 125 and 150 two, diameter is 125mm and 150mm.
- Q: What is the depreciation period for concrete and concrete carriers and how much net residual value is
- The net residual value of fixed assets is between 3% and 5% of the original value of fixed assets.
- Q: What is the calculation of the unit price of concrete pump?
- Construction machinery platform price refers to a construction machinery, in normal operating conditions under a work class in the full costs incurred, according to 8h work system calculation.
- Q: Why is my concrete pump often appear plugging phenomenon?
- Pumping, the speed of the choice is critical, the operator can not blindly map fast, sometimes haste makes waste.
Send your message to us
Concrete Pump Truck Professional Supply Camc of 39meters
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords