Concrete Pump Good Quality with Truck -42m
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Concrete Pump Good Quality with Truck -42m
Product Details
Basic Info.
Model NO.:42m
Type:Concrete Pump
Machining Process:Hydraulic
Certification:ISO9001: 2000, CE
Condition:New
Concrete Pump Boom Height:42m
Chassis:HOWO or Isuzu
Export Markets:Global
Additional Info.
Trademark:Hongda Tielishi
Packing:RO-RO
Standard:ce, ccc, iso
Origin:China
HS Code:870590909
Production Capacity:200
Product Description
Model: HDT5350THB-42/4
Chassis: ISUZU OR HOWO
Total Weight: 35000kg
Driving model of chassis: 8*4
Max driving speed: 85km/h
Dimension: 13950mm*2490mm*3960mm
Wheel base: 1-2 Base / 2-3base / 3-4base: 1800 / 4600 / 1350
Tread: Front /rear: 2022mm/1830mm
Brake distance: 10m/30km/h
Engine:
Model: D12 4-stroke, 6-cylinder, water cooling, direct injection, diesel engine
Min. Turning radius: 12.1m
Power: 275KW/2200rpm
Max. Torque: 1500Nm/1100-1600rpm
Exhaust standard: EU III
Displacement: 12.1L
Boom system:
Model: 5 section, folded, all hydraulic
Max height to the earth: 41.8m
Pipe diameter: DN125
Length of rear hose: 3m
Items | Unit | Parameters | ||||
HDT5340THB-42/4 | HDT5350THB-42/4 | HDT5380THB-45/5 | HDT5401THB-45/5 | |||
Main Technical Parameters in Service | Theoretical Pumping Capacity | m3/h | 125 | 125 | 125 | 125 |
Pumping Capacity Index | Mpa.m3/h | 586 | 586 | 586 | 586 | |
Theoretical Pumping Pressure | Mpa | 8.5 | 8.5 | 8.5 | 8.5 | |
Hopper Capacity | L | 700 | 700 | 700 | 700 | |
Feeding Height | mm | 1400 | 1400 | 1400 | 1400 | |
Distributing Valve Form | S-pipe valve | S-pipe valve | S-pipe valve | S-pipe valve | ||
Max. Distributing Radius | m | 38 | 38 | 40.7 | 40.7 | |
Max. Distributing Height | m | 41.8 | 41.8 | 44.7 | 44.7 | |
Max. Distributing Depth | m | 29 | 29 | 31.3 | 31.3 | |
Height of Distributing Boom When Stretched | mm | 8600 | 8600 | 8495 | 8495 | |
Distance between Front Landing Legs | mm | 8820 | 8820 | 9550 | 9550 | |
Distance between Rear Landing Legs | mm | 8500 | 8500 | 9550 | 9550 | |
Distance between Front and Rear Landing Legs | mm | 8490 | 8490 | 9190 | 9190 | |
Diameter of Conveying Pipe | mm | 125 | 125 | 125 | 125 | |
Length of Tail Hose | m | 4 | 3 | 3 | 3 | |
RotaryRangeof Distributing Boom | 370° | 365° | 365° | 365° | ||
Number of Boom Sections | 4 | 4 | 5 | 5 | ||
Rotary Angle of Each Boom Section | ° | 92/180/180/240 | 92/180/180/240 | 91/180/180/180/270 | 91/180/180/180/270 | |
Close-control Distance | m | 33 | 33 | 33 | 33 | |
Remote-control Distance | m | 200 | 200 | 200 | 200 | |
Main Technical Parameters in Traveling Condition | Max. Traveling Speed | km/h | 85 | 85 | 85 | 80 |
Min. Turning Radius | mm | 11900 | 12100 | 11900 | 12100 | |
Brake Distance | m | 10 | 10 | 10 | 10 | |
Approach Angle | ° | 16 | 16 | 16 | 16 | |
Departure Angle | ° | 11 | 11 | 11 | 11 | |
Chassis Model | ISUZUCYH51Y | HOWOZZ5437S 4667C | ISUZUCYH51Y | HOWO ZZ5437S 4667C | ||
Wheel Base between the First and the Second Axle | mm | 1850 | 1800 | 1850 | 1800 | |
Wheel Base between the Second and the Third Axle | mm | 4605 | 4600 | 4605 | 4600 | |
Wheel Base between the Third and the Fourth Axle | mm | 1310 | 1350 | 1310 | 1350 | |
Front Tread | mm | 2065 | 2022 | 2065 | 2022 | |
Rear Tread | mm | 1850 | 1830 | 1850 | 1830 | |
Max. Engine Power | kw | 287(1800r/min) | 275(2200r/min) | 287(1800r/min) | 275(2200r/min) | |
Max Engine Torque | n.m | 1863(1100r/min) | 1500 /(1100~1600 r/min) | 1863(1100r/min) | 1500 /(1100~1600 r/min) | |
Max. Grade Ability | % | 37 | 37 | 35 | 35 | |
Fuel Consumption Limit | L/100km | 38 | 38 | 40 | 40 | |
Overall Dimension (L ×W× H) | mm | 13800×2490×3995 | 13650×2490×3960 | 13100×2500×3900 | 13300×2500×4000 | |
Full-load Total Weight | kg | 34500 | 35000 | 38000 | 40000 |
- Q: Concrete tow pump price how much money ??
- After more than 20 years of innovation and development, the company has become a set of construction machinery, mining machinery, building materials machinery development and production, sales in one of the technology-intensive enterprises.
- Q: Is it easy to use fine stone concrete pump?
- The fine stone concrete pump is a fine stone concrete transportation equipment specially developed for the warm construction and its construction characteristics
- Q: How to prevent concrete pump blockage
- Concrete or mortar segregation: wet water pipes before the pump, from the lowest point of the pipe pipe joints will be released, the remaining water will be let go, or pump water, pump mortar before, put a sponge ball, the mortar and water separated.
- Q: How much concrete can the concrete pump deliver for one hour
- Another kind of pump body is installed in the car chassis, and then equipped with retractable or inflected cloth rod, and the composition of the pump.
- Q: What are the standards for the use of concrete pumps?
- Pumping operation to transfer the end of the transfer pump legs, the first income after the legs, put down the ground wheel, and then receive the front legs;
- Q: Building concrete pump is how to bulk cement (concrete) to the high
- When the hydraulic system pressure oil enters a main cylinder, the piston rod is extended and the other piston rod is retracted by the pressure oil of the sealing circuit connecting the pipe.
- Q: What is the role of concrete pump truck
- According to the structure is divided into piston type, squeeze type, water pressure diaphragm type.
- Q: What is the meaning of cast - in - place concrete secondary grouting?
- Recycled concrete secondary grouting refers to the concrete pouring after solidification; with grouting equipment will be designed slurry (usually cement slurry, water, highway for a certain ratio of cement, sand) into the concrete due to solidification and shrink
- Q: Can the tower crane be filled with concrete pump tube?
- (6) buried in the underground material are not allowed to hang; (7) safety device failure or sickness are not allowed to suspend; (8) live light dark can not see hanging objects up and down
- Q: What is the difference between a concrete pump and a concrete pump?
- And the latter is much higher than the former price, the former needs hundreds of thousands, the latter need millions.
Send your message to us
Concrete Pump Good Quality with Truck -42m
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords