Concrete Pump Truck-Mounted or Sale Jh5190thb-32
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Concrete Pump Truck-Mounted or Sale Jh5190thb-32
Product Details
Basic Info.
Model NO.:DWB5018-5028
Type:Concrete Pump
Shotcrete Type:Wet
Machining Process:Hydraulic
Structure:Cylinder Type
Productivity:50m3/H-80m3/H
Certification:ISO9001: 2000, CE, Concrete Boom Pump Truck
Condition:New
Color:Red
Pumping Frequency (H/L Pressure):14/23
The Type of Distribution Valve:S Valve
Chassis and Vehicle:Sinotruck or Dongfeng
Max. Outlet Pressure (H/L Pressure):13/7.6 MPa
Main Oil Pump:Japanese Kawasaki
Seal Parts:American Parker
Main Electric Parts:Original Omron or Ls Electrical Devices
Pipe Joints:American Eaton
Warranty:12 Months
After-Sales Service Provided:Engineers Available to Service Machinery Overseas
Export Markets:Global
Additional Info.
Trademark:DAWIN
Packing:Standard Exporting Package
Standard:CE ISO
Origin:Qingdao Shandong
HS Code:84134000
Production Capacity:2000 Sets/Year
Product Description
1. Diesel Engine: LOVOL, Sino-British Joint Brand
2. Main oil pump: Japanese Kawasaki
3. Seal parts: American Parker
4. Main electric parts: original Omron or LS electrical devices
5. Manual switch of high pressure and low pressure is equipped
6. Pipe joints: American Eaton
7. Spare parts and tools
Item | Unit | Parameter | Parameter | Parameter | Parameter | |
Pumping System | Model | JH5018 | JH5021 | JH5025 | JH6528 | |
Max. Output | m³/h | 50 | 60 | 60 | 80 | |
Max. outlet pressure | Mpa | 13/7 | 13/7 | 13/7 | 13/7 | |
Rated working pressure | Mpa | 31.5 | 31.5 | 31.5 | 32 | |
Pumping frequency (H/L pressure) | times/min | 23/14 | 23/14 | 23/14 | 30/19 | |
Oil cylinder diameter | mm | DN125 | DN125 | DN125 | DN125 | |
Concrete cylinder diameter | mm | DN200 | DN200 | DN200 | DN200 | |
Jib Structure System | Max. placing height | m | 18 | 21 | 25 | 28 |
Rotary angle | ° | 365 | 365 | 365 | 365 | |
Arms section quantity | section | 3 | 3 | 4 | 4 | |
Diesel Engine | kw | YUCHAI 85 | YUCHAI 85 | YUCHAI 85 | YUCHAI 85 | |
Chassis and Vehicle | Chassis model | DONGFENG or SINOTRUCK | DONGFENG or SINOTRUCK | DONGFENG or SINOTRUCK | DONGFENG or SINOTRUCK | |
Wheelbase | mm | 4700 | 4700 | 4700 | 4800 | |
Power of engine | kw | 132 | 132 | 132 | 147 | |
Emission standard | National IV | National IV | National IV | National IV | ||
Lubricating mode | Centralized automatic | Centralized automatic | Centralized automatic | Centralized automatic | ||
Control mode | Manual and Remote control | Manual and Remote control | Manual and Remote control | Manual and Remote control |
- Q:How the calculation of the discharge speed of concrete pump truck
- as well as mixing and mixing station mixing speed, There is also a condition that is the quality of concrete
- Q:What is the maintenance method of concrete pump?
- Vertical pipe should be no less than 10m with a check valve of the horizontal tube, is strictly prohibited vertical tube directly connected to the concrete pump output.
- Q:What is the performance of the 60-type concrete pump?
- Distribution valve type S pipe valve (integral casting)Concrete cylinderBore × travel mm 200 × 1650 specifications:
- Q:How to prevent concrete pump blockage
- Pipeline connection error: pipe error is also likely to cause plugging, pipe layout should be the shortest distance, least elbow, the maximum elbow principle.
- Q:What is the pressure of a support leg when the concrete pump is operating?
- I read the information about the pump, usually the maximum weight of each leg to bear the quality of the vehicle with almost the same.
- Q:How to choose concrete pump concrete pump
- The main performance parameters of the commonly used concrete pump should be consistent with the construction requirements or slightly larger, if the capacity is too large, the utilization rate is low, too small, not only can not meet the requirements will accelerate the loss of concrete pump.
- Q:How is the mortar in concrete pumping concrete coexisting and distinguishing in a pump?
- Before pumping concrete, first remove the water in the hopper from the pipe to wet and clean the pipe, then press the pure water slurry or
- Q:What are the requirements of the concrete pump?
- 7, when the construction of high-rise buildings or high-rise structures using a relay pump to pump concrete, the relay pump should be set to position the upper and lower pump delivery capacity to match.
- Q:How much concrete can the pump pump pump for an hour?
- Futian Leisha pump using large diameter, long stroke of the cylinder and the smaller suction angle of the perfect combination of technology,
- Q:How to determine the concrete pump truck blocking the site
- Pumping action and hydraulic system are normal, no abnormal sound and vibration, the hopper has a larger aggregate or agglomeration, at the feed port stuck or arch and blocked.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Concrete Pump Truck-Mounted or Sale Jh5190thb-32
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords