Concrete Pump Truck-Mounted ZLJ5336THB(43X-5RZ)
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Concrete Pump Truck-Mounted ZLJ5336THB(43X-5RZ)
Product Details
Basic Info.
Model NO.:ZLJ5336THB (43X-5RZ)
Product Description
Item: ZLJ5336THB (43X-5RZ)
Description:
ZLJ Series of Truck-Mounted Concrete Pump's performance
1. Diesel Engine: LOVOL, Sino-British Joint Brand
2. Main oil pump: Japanese Kawasaki
3. Seal parts: American Parker
4. Main electric parts: original Omron or LS electrical devices
5. Manual switch of high pressure and low pressure is equipped
6. Pipe joints: American Eaton
7. Spare parts and tools
Item | Unit | Parameter | Parameter | Parameter | Parameter | |
Pumping System | Model | JH5018 | JH5021 | JH5025 | JH6528 | |
Max. Output | m³/h | 50 | 60 | 60 | 80 | |
Max. outlet pressure | Mpa | 13/7 | 13/7 | 13/7 | 13/7 | |
Rated working pressure | Mpa | 31.5 | 31.5 | 31.5 | 32 | |
Pumping frequency (H/L pressure) | times/min | 23/14 | 23/14 | 23/14 | 30/19 | |
Oil cylinder diameter | mm | DN125 | DN125 | DN125 | DN125 | |
Concrete cylinder diameter | mm | DN200 | DN200 | DN200 | DN200 | |
Jib Structure System | Max. placing height | m | 18 | 21 | 25 | 28 |
Rotary angle | ° | 365 | 365 | 365 | 365 | |
Arms section quantity | section | 3 | 3 | 4 | 4 | |
Diesel Engine | kw | YUCHAI 85 | YUCHAI 85 | YUCHAI 85 | YUCHAI 85 | |
Chassis and Vehicle | Chassis model | DONGFENG or SINOTRUCK | DONGFENG or SINOTRUCK | DONGFENG or SINOTRUCK | DONGFENG or SINOTRUCK | |
Wheelbase | mm | 4700 | 4700 | 4700 | 4800 | |
Power of engine | kw | 132 | 132 | 132 | 147 | |
Emission standard | National IV | National IV | National IV | National IV | ||
Lubricating mode | Centralized automatic | Centralized automatic | Centralized automatic | Centralized automatic | ||
Control mode | Manual and Remote control | Manual and Remote control | Manual and Remote control | Manual and Remote control |
- Q:What is the introduction of fine stone concrete pump
- especially in the narrow construction site. It has the advantages of high safety, high efficiency, good quality, low environmental pollution,
- Q:What factors will be taken into account when selecting the pump chassis?
- As the pump work strength, for the chassis durability and intact rate requirements are very high, once the chassis failure, brought about not only the maintenance costs, the user's economic benefits will be seriously affected;
- Q:What is the purpose of concrete pump truck?
- Adapt to the urban construction, residential quarters, recreation venues, overpasses, airports and other construction of concrete construction.
- Q:Can the tower crane be filled with concrete pump tube?
- (3) the weight of the hanging material is not clear or overload is not allowed to be suspended; (4) the bulk of the bundle is not strong or the material is not full of loading and unloading; (2)
- Q:What are the types of common concrete pumps?
- Concrete pump structure is divided into piston type, squeeze type, water pressure diaphragm type.
- Q:What is the difference between concrete conveyors and concrete conveyors?
- The parameters of the main pump are used to determine the speed and transport height of the pump. The horizontal distance is determined by the length of the cloth rod. It is suitable for pouring concrete in fixed mode and can ensure the uniformity of concrete and increase the compactness.
- Q:What is the type of concrete pump truck?
- At present the domestic brands: Trinity, the Chinese, Bardon, Chutian, Broadcom, Jia Erhua, heaven and earth heavy industry, the public together, Hong profit, Hainuo and so on.
- Q:How to wash the concrete pump with a ball
- Used for large concrete projects such as concrete transport work.
- Q:What are the advantages of concrete pump gate valve and S pipe valve?
- Simple structure, smooth flow channel, low flow resistance of concrete; high pumping pressure; hopper from the ground height is low, easy to mix concrete truck to the hopper discharge; for the speed of fast, low noise.
- Q:What is the depreciation period for concrete and concrete carriers and how much net residual value is
- The depreciation period for concrete and concrete carriers is 4 years and the net residual value is 2%.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Concrete Pump Truck-Mounted ZLJ5336THB(43X-5RZ)
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords