Concrete Pump Truck Chassis Used Schwing for Africa
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Concrete Pump Truck Chassis Used Schwing for Africa
Product Details
Basic Info.
Model NO.:SCHWING
Load Capacity:21-30t
Drive Wheel:8X2
Engine Capacity:>8L
Seats:≤5
Horsepower:351-450hp
Tire Type:Solid Tire
Power:Diesel
Tire Design:Tubeless
Transmission Type:Manual
Tire Certification:ECE, GCC, ISO, DOT
Emission Standard:Euro 3
Condition:Used
Total Weight:26t
Engine Power:360HP
Number of Cylinder:10
Manufacture Year:2003
Maximum Boom Height:35m
Rated Ngine Capacity:12L
Allow Passengers Cab:2 People
Overall Dimensions (L*W*H):12200X2495X3990mm
Export Markets:Global
Additional Info.
Trademark:Isuzu
Packing:Bulk Carrier or Roro Shipping
Standard:CE/SGS/CO/ISO
Origin:Japan
HS Code:84295900
Production Capacity:8 Sets Per Month
Product Description
Brand | Isuzu |
Model | Schwing |
Year | 2003 |
Output capacity (m3/h) | 120 |
Concrete pressure(bar) | 61~76 |
Concrete cylinder(mm) | 230X2000 |
Mixer Hopper Capacity (L) | 550 |
Boom unfolding height (m) | 8.9 |
Boom vertical reach (m) | 47 |
Boom horizontal reach (m) | 42 |
Boom depth reach (m) | 33 |
Original place | Japan |
Leading time | 7 days |
Type | high altitude operation truck |
Aspiration | turbocharged & aftercooled |
Operating ocndition | very good condition, work efficiently |
Aftersales service | overseas service provided |
Test operation | machine can be tested & inspected in yard |
Trading terms | FOB, CIF, CFR |
Payment | L/C, T/T, west union |
Color & refurbishment | 1. original white & green 2. machine can be repainted as U request |
Repairing state | 1. no heavy repairing, no oil leak; 2. machine can be inspected, 3. broken parts be replaced before shipping |
Delivery details | 1. bulk or roro shipping; 2. about one month after downpayment |
Cab condition | 1. safe & comfortable 2. not easy to be tired to work for a long time |
- Q: Winter concrete pump pipe Zeyang insulation Yeah?
- Concrete winter preparation for the day when the minimum temperature below 0 ℃, should take the winter construction measures to prevent the construction of the construction work suffered frost damage
- Q: What is the main composition of concrete pump
- Concrete large transport equipment, for high-rise, high-speed, overpass and other large concrete concrete concrete work.
- Q: How to choose concrete pump concrete pump
- 3. Construction adaptability The concrete pump is flexible, and the higher the height of the boom, the greater the casting height and the radius of the fabric, the greater the adaptability of the construction, the construction should be used in the high-beam concrete pump.
- Q: What is the maintenance method of concrete pump?
- Concrete pump should be placed in a solid flat ground, put down the legs, the body placed smoothly.
- Q: What are the brands of concrete pump trucks?
- The domestic brand-name Sany, the Union, foreign brand-name elephant, Shi Weiyin, etc., but the brand price is also expensive, choose a small brand to be able to buy brand-name or buy homemade it, I think our country's construction machinery is still good
- Q: What measures should be taken in the construction of the underground garage
- 1. In the middle of the garage between the two beams with a sleepers into the channel for the pump on the top of the passage.
- Q: What is the calculation of the unit price of concrete pump?
- Usually with the pump is related to the amount of pumping less, to charge classes to ensure that the profits; pumping more, pumping high fees, there is no need to charge.
- Q: How is the mortar in concrete pumping concrete coexisting and distinguishing in a pump?
- Concrete mixing truck, the first charge, should be more two bags of cement.
- Q: What is the introduction of fine stone concrete pump
- Fine stone concrete pump is a kind of fine stone concrete conveying machine that mixes the mixed fine stone concrete from the mixing device through the horizontal or vertical pipe, continuously delivers to the pouring site and pours it into the template.
- Q: What are the requirements for the selection of concrete pump tubing and the setting of the bracket?
- 4 transport pump pipe should be fixed with a bracket, the bracket should be firmly connected with the structure, transport pump tube at the stent should be encrypted.
Send your message to us
Concrete Pump Truck Chassis Used Schwing for Africa
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords