Concrete Pump Truck Popular Model of 24-58meters
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Concrete Pump Truck Popular Model of 24-58meters
Product Details
Basic Info.
Model NO.:HTD5180THB-24/3
Type:Concrete Pump
Shotcrete Type:Wet
Machining Process:Hydraulic
Structure:Rotor Type
Productivity:90㎡/h
Feeding Height:1400mm
Vibrating Amplitude:1.2mm
Certification:ISO9001: 2000, CE
Condition:New
Color:White
Export Markets:Global
Additional Info.
Trademark:SINOTRUK
Packing:Nude
Standard:SGS, GOST
Origin:China
Production Capacity:500, 000 Unit/Year
Product Description
Model | HTD5180THB-24/3 | Model of chassis | SINOTRUK | |||||
Weight | 18460kg | Drive mode of chassis | 4×2/6x4 | |||||
Max. travel speed | 92km/h | Cab with sleeper | ||||||
Wheelbase | 5600 mm | |||||||
Outline | Overall length | 13740mm | ||||||
Overall width | 2490mm | Tread | front wheel | |||||
Overall height | 4000mm | rear whee | ||||||
Engine | Model of engine | WP10.290 | Tire size | 12.00R20 | ||||
Min. turning radius | ||||||||
Braking distance | ||||||||
Output power | 290PS(213KW) | B oom | Form | three section, folded, full hydraulic | ||||
Max. torque | 1055NM | Max. ground clearance | 23.1m | |||||
Emission standard | EuroIII | Diameter of conveying pipe | DN125 | |||||
Gearbox model | 9JS119 | Length of end hose | 3m | |||||
displacement | 97269726ML | Section 1 boom | Length | 8220 | ||||
Drive mode | Hydraulic type | rotation | 910 | |||||
×Cylinder diameter ×stroke | φ140mm×2000mm | Section 2 boom | Length | 5680mm | ||||
×Delivery cylinder diameter × stroke | φ230mm×2000mm | rotation | 1800 | |||||
Distributing valve type | Svalve | Section3 boom | Length | 5215mm | ||||
Displacement in theory | 160/70m3/h | rotation | 2680 | |||||
Pumping pressure in theory | 8/11.8Mpa | |||||||
Rotating range of placing boom | any | |||||||
Pumping times in theory | 19/19 times/min | Max. placing radius | 19.1 m | |||||
Max. placing height | 23.1 m | |||||||
Hydraulic system pressure | 32MPa | |||||||
Method of lubrication | Automatic grease lubrication | |||||||
Hopper capacity | 0.7M3 | Oil tank capacity | 1000L | |||||
Feeding height | 1.40m | Control | /Manual/ remote control | |||||
System oil pressure | 32Mpa | Max. water pressure of water pump | 6MPa | |||||
Slump constant | 14cm~23cm | Water tank volume | 650L | |||||
Max. aggregate size | 40mm | Cooling method of hydraulic oil | Air cooling | |||||
Outrigger span | 4550×2280×6030 | Cleaning way of concrete pipe | /Washing/ dry-cleaning |
- Q: How to achieve the concrete pump pendulum for the change?
- But nothing more than three types 1. close to the switch or stroke switch to the main cylinder for the signal at the same time to the swing cylinder a commutation signal.
- Q: How does the cement slurry solidify inside the concrete pump?
- If the solidification is very serious, it is recommended to use ultra-high pressure water jet rinse, this water knife can be directly cut concrete, but the price is relatively large.
- Q: How wide concrete pump truck four support steel feet stretch ?
- Different types of pump, such as arm length 30 meters, 48 meters, 52 meters of the pump
- Q: Why does the concrete pump main cylinder check valve damage cause the cylinder stroke to be short and the pumping is weak?
- The main cylinder discharge, long run will lead to shorter travel, when the main cylinder of the smaller volume, through the pressure (closed off the valve) can also be achieved by the preset pressure, it can not be pressed to determine whether the master cylinder seal damage;
- Q: What is the maintenance method of concrete pump?
- Vertical pipe should be no less than 10m with a check valve of the horizontal tube, is strictly prohibited vertical tube directly connected to the concrete pump output.
- Q: What is the lubrication of the concrete pump before it is transported to the concrete?
- the first use of water, while wetting the pipe can also be wet template, to moderate
- Q: How much concrete can the concrete pump deliver for one hour
- Another kind of pump body is installed in the car chassis, and then equipped with retractable or inflected cloth rod, and the composition of the pump.
- Q: What is the wall thickness of the concrete pump 125?
- At present, it is mainly divided into gate valve concrete pump and S valve concrete pump.
- Q: How much concrete pump power
- Combining ready-mix concrete production with pump construction, the use of concrete mixing truck for intermediate operation, can achieve continuous pumping and pouring concrete.
- Q: What is the use of micro-concrete pump?
- Applicable to the construction of railway, highway tunnel, culvert, culvert, culverts, bridge holes and other structures, large-scale group building construction column pouring, including those water conservancy projects, hydropower projects, slope support, underground construction operations, the basis of filling works
Send your message to us
Concrete Pump Truck Popular Model of 24-58meters
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords