Concrete Pump Truck Popular Model of 24-58meters
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Concrete Pump Truck Popular Model of 24-58meters
Product Details
Basic Info.
Model NO.:HTD5180THB-24/3
Type:Concrete Pump
Shotcrete Type:Wet
Machining Process:Hydraulic
Structure:Rotor Type
Productivity:90㎡/h
Feeding Height:1400mm
Vibrating Amplitude:1.2mm
Certification:ISO9001: 2000, CE
Condition:New
Color:White
Export Markets:Global
Additional Info.
Trademark:SINOTRUK
Packing:Nude
Standard:SGS, GOST
Origin:China
Production Capacity:500, 000 Unit/Year
Product Description
Model | HTD5180THB-24/3 | Model of chassis | SINOTRUK | |||||
Weight | 18460kg | Drive mode of chassis | 4×2/6x4 | |||||
Max. travel speed | 92km/h | Cab with sleeper | ||||||
Wheelbase | 5600 mm | |||||||
Outline | Overall length | 13740mm | ||||||
Overall width | 2490mm | Tread | front wheel | |||||
Overall height | 4000mm | rear whee | ||||||
Engine | Model of engine | WP10.290 | Tire size | 12.00R20 | ||||
Min. turning radius | ||||||||
Braking distance | ||||||||
Output power | 290PS(213KW) | B oom | Form | three section, folded, full hydraulic | ||||
Max. torque | 1055NM | Max. ground clearance | 23.1m | |||||
Emission standard | EuroIII | Diameter of conveying pipe | DN125 | |||||
Gearbox model | 9JS119 | Length of end hose | 3m | |||||
displacement | 97269726ML | Section 1 boom | Length | 8220 | ||||
Drive mode | Hydraulic type | rotation | 910 | |||||
×Cylinder diameter ×stroke | φ140mm×2000mm | Section 2 boom | Length | 5680mm | ||||
×Delivery cylinder diameter × stroke | φ230mm×2000mm | rotation | 1800 | |||||
Distributing valve type | Svalve | Section3 boom | Length | 5215mm | ||||
Displacement in theory | 160/70m3/h | rotation | 2680 | |||||
Pumping pressure in theory | 8/11.8Mpa | |||||||
Rotating range of placing boom | any | |||||||
Pumping times in theory | 19/19 times/min | Max. placing radius | 19.1 m | |||||
Max. placing height | 23.1 m | |||||||
Hydraulic system pressure | 32MPa | |||||||
Method of lubrication | Automatic grease lubrication | |||||||
Hopper capacity | 0.7M3 | Oil tank capacity | 1000L | |||||
Feeding height | 1.40m | Control | /Manual/ remote control | |||||
System oil pressure | 32Mpa | Max. water pressure of water pump | 6MPa | |||||
Slump constant | 14cm~23cm | Water tank volume | 650L | |||||
Max. aggregate size | 40mm | Cooling method of hydraulic oil | Air cooling | |||||
Outrigger span | 4550×2280×6030 | Cleaning way of concrete pipe | /Washing/ dry-cleaning |
- Q: When the concrete pump in the transport of concrete before the pipeline should be what lubrication
- And then share a coup, tanker to a lot of time, the site to prepare some sugar, if the pouring time is too long, the general 9 square tank you put 1 kg of sugar can be used as a retarder
- Q: What is the performance of the 60-type concrete pump?
- Maximum theoretical vertical distance m 270Maximum theoretical level of transport distance m 1200
- Q: Will the role of concrete towing pump, concrete raw materials are sand or sand?
- Production of concrete raw materials are sand, which also cement, admixtures, stones, fly ash and so on.
- Q: What kind of driver's license does the concrete pump need?
- According to the "People's Republic of China Road Traffic Safety Law" Chapter II, Article XI: driving motor vehicles on the road, should be hanging motor vehicle number plate, placed inspection signs, insurance signs, and the vehicle to carry motor vehicle driving permit.
- Q: What is the cause of concrete pump blockage?
- To identify the clogging site, with a mallet to plug the concrete mixture at the plug, and then through the concrete pump is anti-pump to eliminate the block.
- Q: What is the role of the one-way valve at both ends of the main cylinder of a concrete pump truck?
- Oil circuit to open the one-way valve does not work to facilitate the piston back to the cleaning room to facilitate the replacement of the piston.
- Q: What is the pumpability of concrete
- Pumpability refers to the fresh concrete can be transported by concrete pump, high efficiency for concrete pouring construction.
- Q: What is the name of the pump called concrete?
- The concrete pump is retrofitted on a truck chassis, which is equipped with a sports and powertrain, a pump and a stirrer, a cloth, and other auxiliary devices on the chassis.
- Q: How to operate concrete pump
- (10) after the operation, the hopper and the pipeline must be all the concrete output, and then the pump, hopper, pipe cleaning.
- Q: How to deal with pumping concrete pump pipe pipe burst after the burst, the pump can not stop the situation?
- Some poor concrete, stop half an hour afraid of blocking the pump, some four hours are all right.The past is relatively poor concrete, stop the pump to block the pump
Send your message to us
Concrete Pump Truck Popular Model of 24-58meters
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords