• Concrete Pump Rubber piston DN230MM for SCHWING Pump System 1
  • Concrete Pump Rubber piston DN230MM for SCHWING Pump System 2
  • Concrete Pump Rubber piston DN230MM for SCHWING Pump System 3
  • Concrete Pump Rubber piston DN230MM for SCHWING Pump System 4
Concrete Pump Rubber piston DN230MM for SCHWING Pump

Concrete Pump Rubber piston DN230MM for SCHWING Pump

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
1000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Name: 

 Concrete Pump Rubber piston DN230MM for SCHWING Pump

 

Name

Concrete Pump Piston

Size

SCHWING: DN180/200/230/250

PM : DN180/200/230/250

KYOKUTO: DN230/225/205

CIFA: DN178/DN200/DN230

ELBA: DN200/230

ZOOMLION: DN180/200/220/230

SANY: DN180/195/200/230/260/280

Other sizes and types upon customer’s requirement.

Material

Polyurethane,Natural rubber

Application

Used in concrete pump

Service

Brand

Schwing, PM, Kyokuto, CIFA , Zoomlion, Sany, and so on

2.  Application

Our  Concrete Pump Rubber piston DN230MM for SCHWING Pump have been successfully exported to many countries from 1998, Our main markets as below: Middle East, Southeast Asia, America, Brazil, Italy, Russia, South Africa etc

3.  Package

Every  Concrete Pump Rubber piston DN230MM for SCHWING Pump put in one seaworthy wooden box, in one 20feet container.

 

FAQ:

Q1: Why buy Materials & Equipment from us?

A1: All products have its ISO certifications, adheres to the highest standards and a commitment to supply chain safety and customer satisfaction.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 10 to 30 workdays.

Q4: If we can produce some Concrete Pump Rubber piston DN230MM for SCHWING Pump according to customers request?

A4: Yes, we can produce Concrete Pump Rubber piston DN230MM for SCHWING Pump according to the difference country situations and different concrete  pump to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5:We have overseas branches all-around of world, IF needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities &skilled personnel at site for training.

 

 

 

 

Concrete Pump Rubber piston DN230MM for SCHWING Pump Concrete Pump Rubber piston DN230MM for SCHWING Pump

 

Concrete Pump Rubber piston DN230MM for SCHWING Pump Concrete Pump Rubber piston DN230MM for SCHWING Pump

 

Concrete Pump Rubber piston DN230MM for SCHWING PumpConcrete Pump Rubber piston DN230MM for SCHWING Pump

 

 

Concrete Pump Rubber piston DN230MM for SCHWING PumpConcrete Pump Rubber piston DN230MM for SCHWING Pump

 

Q:What is a door rack for a construction site? How high is it generally?
This depends on the erection of the height of the general 3 steps and within 5-6 yuan a meter, assuming the erection of 4.5 meters high, 22.5-27 yuan a square. This is calculated in accordance with single-layer, the higher the more expensive, 9 meters in 65 yuan or so square. In accordance with the establishment of meters, in accordance with the erection of the volume of the calculation.
Q:Where are the hanging baskets for the building?
It is strictly prohibited to use hanging baskets as vertical transport facilities for personnel and materials; no staff member is allowed to climb from a basket to a B basket
Q:What functions should be achieved in mechanical structure design?
The main features of the mechanical structure design are: (1) it is a set of thinking, drawing and calculation (sometimes necessary experiments) in one of the design process, is involved in machinery design, the most specific, the largest volume of work, in the whole process of mechanical design, an average of about 80% of the time for the structure design plays an important role in the success of mechanical design. (2) the multi solution of mechanical structure design, that is, the mechanical structure that satisfies the same design requirement, is not the only one. (3) the mechanical structure design stage is a very active design link, often needs to cross repeatedly. Therefore, in the design of mechanical structure, it is necessary to understand the basic requirements of the mechanical structure from the whole of the machine
Q:What are the sectors of machine building and parts processing?
3., machinery manufacturing is also a kind of industry, many industries have parts manufacturing, processing links. Therefore, the processing of parts does not belong to a particular industry.
Q:What is equipment manufacturing and machinery manufacturing? What's the difference between them?
Equipment manufacturing, also known as equipment industry, mainly refers to the capital goods manufacturing industry, is to meet the needs of the development of the national economy departments and national security needs and manufacture all kinds of technical equipment industry collectively. According to the national economy sector, its range of products including investment manufactured goods machinery electronics and ordnance industry, belonging to the metal products industry, general equipment manufacturing industry, special equipment manufacturing, transportation equipment manufacturing, electrical equipment and equipment manufacturing industry, electronics and communications equipment manufacturing, instrumentation and cultural office the equipment manufacturing industry in the 7 major categories of 185 kinds.
Q:What are the details of construction machinery parts in sand casting?
(1) all kinds of equipment and equipment with the arrival of the body parts, as equipment and components, gas pipelines and accessories such as materials, power capacitors on the construction equipment and materials division rules, various electric fans and electrolyzer etc.. 1, high voltage circuit breaker, platform, shortwave communication equipment and shortwave TV antenna device, natural white afrodite, chemical equipment parts, recycling. For the completion of the building, elevator rails are materials, catalyst, screen (including the box and the instrument has been installed in place, by the design unit to provide manufacturing drawings, unit combination instrument, strengthen the investment in the process of construction and management, and other accessories are materials; non standard equipment, sliding contact line
Q:How do the welding parts in the welding drawings of the machine parts indicate the technical requirements of the drawings?
With what groove related, open groove is not the same, marking is not the same, "welding structure" reference to our specialized courses
Q:What is the difference and connection between equipment manufacturing and machine building?
When our company went to the training center of the Department of industrial engineering of Tsinghua University, the professor of Qinghua University told us about it. Equipment manufacturing industry is a general term for the equipment provided for the national economy and national security
Q:How are buildings, installations and materials divided?
Provisions on the division of equipment and materials for engineering construction? [answer] the division of equipment and materials in engineering construction is directly related to the reasonable division of investment structure, budget preparation and calculation of construction output value. In order to reasonably determine the project cost, strengthen the investment in the process of construction and management, the equipment and materials in the engineering construction is unclear, especially the universal controversial common problems and put forward the principle of division of fifteen copies of "national unified installation project budget quota" of the equipment and materials are divided, the provinces, autonomous regions and municipalities directly under the central government and the relevant departments of the State Council, the Department should be combined with the local situation, formulate rules for its implementation, and report to the Ministry of construction for the record.
Q:Where are the mechanical pressurization air supply facilities set up?
The purpose of setting up a mechanical pressurization air supply smoke prevention system is to provide evacuation routes and shelters without smoke interference in the event of a fire in the building. Therefore, in the closed door, pressing position, and the fire floor must maintain a certain pressure difference, the position of the air pressure value is a relative positive pressure); at the same time, in the open part of the pressure when the door can have enough air velocity in the opening section, to effectively prevent the intrusion of flue gas, the safety of personnel ensure evacuation and refuge.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords