Concrete Pump Parts of Elbow of DN125 with single or double
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 400 pc
- Supply Capability:
- 290000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Concrete Pump elbow
1.product profile:The double layer concrete pump elbow is developed by ourselves through new
technology and process.
2.characteristic:the inner layer of this concrete pump elbow undergoes heat treatment,and then the rigitiry can reach 62-65HRC.
3.characteristic:the outer layer of the concrete pump elbow possess good toughness properties
to protect the inner layer,so the security of the elbow is improved.
4.life:the experiment done abroad shows that the life of our concrete pump elbow can reach 35000-50000cbm,got the customers' praise
5.Beside the double layer concrete pump elbow,we produce all kinds of concrete pump parts,
straight pipe hose flange coupling and so on.
Wear-resistant Single or Double Concrete Pump Elbow | ||||||||
Type | Singe Elbow | Double Elbow | ||||||
Model | DN125 | DN150 | DN175 | DN125 | ||||
Material | Casting Steel ,ST52 | Inside | 40Cr | Outside | ||||
Size | R275*90° | R275*90°+110 | 36° | F2000 | R275*90° | R275*90°+110 | ||
R275*45° | R275*90°+211 | R400*30° | A3000 | R275*45° | R275*90°+211 | |||
R275*25° | R275*90°+411 | R400*45° | 471B | R275*25° | R275*90°+411 | |||
R275*20° | R275*90°+424 | R400*30° | 571B | R275*20° | R275*90°+424 | |||
R275*15° | R275*45°+170 | R488*90° | A1000 | R275*15° | R275*45°+170 | |||
R180*90° | R275*45°+310 | R500*90 | C1000 | R180*90° | R275*45°+310 | |||
R232*60° | R275*45°+310 | R280*90° | B2000 | R232*60° | R275*45°+310 | |||
R240*36° | 20°Lengthen | R240*36° | 20°Lengthen | |||||
R240*30° | 25°+740 | R240*30° | 25°+740 | |||||
R240*15° | 40°Zoomlion | R240*15° | 40°Zoomlion | |||||
R385*29° | R385*29° | |||||||
R315*33° | R315*33° | |||||||
Technic | Forged | |||||||
Average life | 25,000cubic | 50,000cubic | ||||||
Appliciation | Used in concrete transport in construction work |
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Concrete Pump Parts of Elbow of DN125 with single or double
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 400 pc
- Supply Capability:
- 290000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches