DN150 High Pressure Concrete Pump Pipe for Putzmeister
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 pc
- Supply Capability:
- 2000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
DN150 High Pressure Concrete Pump Pipe for Putzmeister
1. Structure of DN150 High Pressure Concrete Pump Pipe for Putzmeister:
DN150 High Pressure Concrete Pump Pipe for Putzmeister is made by steel material No.ST52, 37MN5, according to customer’s requests, and also package in bundles or nude packing directly put into container.
DN150 High Pressure Concrete Pump Pipe for Putzmeister is a concrete delivery for combined use with other concrete pipelines in concrete placement operations. It can be widely used in the construction of various types of concrete structures like industrial and civil buildings, bridges, roads, and other types of infrastructure.
This pipes can only be used in concrete construction operations, but not in any other operations, like dragging, moving, or hoisting heavy articles or personnel. The pipe is also not allowed to be used in any location where any combustible or explosive material exists or a cave-in may occur.
2. Main Features of DN150 High Pressure Concrete Pump Pipe for Putzmeister:
• OKorder's Delivery Pipe With Sk Flange Channels are durable, strong, and safety.
• In case of quality problem the company provide free replacement.
• Provide technical support for free.
• Provide consumers with regular visits
• Ensure the supply of ancillary parts
• Our company passed the ISO9000 certification, the product through 3C certification in full compliance with national standards
3. DN150 High Pressure Concrete Pump Pipe for Putzmeister Images:
4. DN150 High Pressure Concrete Pump Pipe for Putzmeister Specification:
Name | Data |
Material | 45MN2/20#/16MN/Q345 |
Thickness | According to customer requirements |
Color | red, white , etc. |
Using life | 20.000m³-80.000m³ |
Weight | 43kg,48kg,69kg |
Length | 1-6m, according to customer requirements |
Model | DN125,DN150 |
Flange | SK/ ZX /FM flange |
Painting | Electrostatic Spraying Epoxy Paint |
Welding | Smooth welding between straight pipes and flanges |
Process | High temperature quenching |
HRC | 65 |
5. FAQ:
We have organized several common questions for our clients, may help you sincerely:
A. Is your products exported a lot?
We have exported to many, many countries. Every year we ship more than 30 containers of these spare parts. Our main market is in Middle-east, Asia & Africa.
B. How long can we receive the product after purchase?
In the purchase of product within three working days, we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 15 working days can be served.
C. How long about delivery time?
Normally we keep the raw materials for old customers and sometime we also keep stock products to make sure delivery time in any emergency cases.
D. If we can produce some pipes according to customers request?
A4: Yes, we can produce Concrete Placing Boom according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.
6. Why choose us:
• We are a comprehensive manufacturing and trading company.
• Our company is one of the biggest manufacturing and trading companies in China.
• We have been specialized in producing concrete pump spare parts and specialized in producing all kinds of concrete pump parts. As Concrete Pump Pipe, Concrete Pump Elbow, Concrete Pump Rubber Hose, Concrete Pump Wear Plate, Concrete Pump S Valve, Concrete Pump Piston and so on.
• We have been supplying concrete pump parts for SCHWING, PUTZMEISTER, SANY, CIFA, KYOKUTO, ZOOMLION for 10 years, so we can promise you the quality and best price.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
DN150 High Pressure Concrete Pump Pipe for Putzmeister
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 pc
- Supply Capability:
- 2000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords