• Concrete Pump Delivery Bend Pipe Delivery Concrete System 1
Concrete Pump Delivery Bend Pipe Delivery Concrete

Concrete Pump Delivery Bend Pipe Delivery Concrete

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Concrete Pump Delivery Bend Pipe



SPECIFICATIONS


Item

number

Name

Specifications

Flange

Material

Thickness

Application

1

Concrete pump elbow

500 90°-15°

148

Carbon

steel

4.50

PM,
 Putzmeister,
 Schwing,
 Sany,
 Zoomlion,
 XCMG,
 trailer, concrete pump

2

Concrete pump elbow

300 90°

148

Carbon

steel

4.50

3

Concrete pump elbow

1000 90°、45°

148

Carbon

steel

4.50

4

Concrete pump elbow

500 90°-15°

148

Carbon

steel

5.00

5

Concrete pump elbow

1000 90°、45°

148

Carbon

steel

5.00

6

Concrete pump elbow

1000 45°

148

Carbon

steel

6.00

7

Concrete pump elbow

500 90°-15°

157

Carbon

steel

6.00

8

Concrete pump elbow

1000 90°

157

Carbon

steel

6.00

9

Concrete pump elbow

1000 45°

157

Carbon steel

6.00

10

Concrete pump elbow

500 90°-15°

157

Carbon

steel

5.00

11

Concrete pump elbow

1000 90°

157

Carbon

steel

5.00

12

Concrete pump elbow

1000 45°

157

Carbon

steel

5.00


             


PACKAGE


No.1 Export standard packing

No.2 Seaworthy packing

No.3 other ways or according to the customer demand


SERVICE


 1. If you need, we can send free samples.

 2. We are a professional manufacturer of concrete pump parts in China,We can customize a variety of types of products.

 3. If there are any quality problem of our product, free replacement.

 4. Reasonable price and high quality.

 5. ISO certification and OEM is welcome.

 6. We can ensure Time Delivery.



Q:What is a door rack for a construction site? How high is it generally?
This depends on the erection of the height of the general 3 steps and within 5-6 yuan a meter, assuming the erection of 4.5 meters high, 22.5-27 yuan a square. This is calculated in accordance with single-layer, the higher the more expensive, 9 meters in 65 yuan or so square. In accordance with the establishment of meters, in accordance with the erection of the volume of the calculation.
Q:What are the details of construction machinery parts in sand casting?
(3) equipped with fittings, installation type air switch and air shower room installed in the furnace. (2) all kinds of vehicle tracks, transmitters, differential pressure and buttons are all materials other than the equipment body. (3) rotating filter network circulating water system for equipment, induction phase shifter, manhole and other various products embedded parts, clean bench, meter, scientific research and other functions of the machine, and pipeline safety device, railing, peep hole, ventilation air heater (1):
Q:What are the construction materials, components, fittings and equipment in construction?
Board: cast-in-place slab, prefabricated slab, prefabricated hollow slab, reinforced concrete slab, wood board. The wall, brick wall, concrete wall, roof parapet, wall light. Door: solid wood door, plywood door, steel door. Window: window, wooden window, Aluminum Alloy window, plastic steel window. The building is in addition to other parts of the building and construction of houses built some auxiliary components, such as scaffolding, construction with pipe thread adjuster, building rod, triangle construction support, reinforced joints etc..
Q:What is the difference and connection between equipment manufacturing and machine building?
In accordance with the standards of classification, including metal products, general machinery manufacturing, machinery manufacturing, transportation equipment manufacturing, electronic and communication equipment manufacturing industry, electrical machinery and equipment manufacturing, instrumentation and office machinery manufacturing seven deducted 186 small consumer related manufacturing industry after class. Equivalent to the European countries referred to as "capital goods manufacturing", that is, we often say "the production of means of production industry."".
Q:How are the machine parts stacked?
Then there is a point to note, that is, from there to get used, must be put back where, so that will be organized, all things are owned by you, it will not mess.
Q:What are the mixing arms of the concrete mixer?
Mixing arm concrete mixer is a component of the mixing arm itself and divided into lateral mixing arm (positive and negative points), stirring arm (also have positive and negative points), stirring arm below is the bearing seat connected, connected with 4 sets of high strength bolts with stirring arm. The top is equipped with wear-resistant mixing blades, connecting with mixing blades, high-strength bolts 2 sets. In addition, some manufacturers have designed mixing side bonded shaft swivel, is installed in the interval between the stirring arm fixed and rotated in two ways.
Q:The building electrical iron pipe and the pipe line fixing member connected to what is called, what is called the iron pipe and the 86 fixed part of tin
The distribution of the construction site, construction machinery and electric hand-held electric tools, lighting, construction site construction site: risk factors and lightning protection, the construction site of common electrical tools and instruments, the construction site of the electricity management, common electrical fault, accidents and accident cases.
Q:What are the sub projects of a construction project?
Appendix B Construction Engineering Division (sub branch) engineering, sub project division, B.0.1 Construction Engineering Division (sub branch), engineering, sub projects can be divided into table B.0.1. Table B.0.1 division number of construction works, sub works and sub projects
Q:China mechanical net
From Chinese GM parts, general machinery, hardware, tools, instruments, electrical appliances and related equipment, textile equipment, chemical equipment, agriculture, food equipment, construction equipment, environmental protection equipment, mining equipment, metallurgical equipment, financial equipment, commercial vehicles and accessories, machinery processing equipment, machinery processing industry machinery enterprises and mechanical products
Q:Where are the mechanical pressurization air supply facilities set up?
When the smoke proof staircase and antechamber antechamber, fire elevator or common antechamber parts can be opened outside the window, can use the natural ventilation, resulting in a stairwell with or common antechamber in the use of natural smoke exhaust with pressurized air supply arrangement of diversified combinations, and the two exhaust can not be shared.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords