• Aluminum-frame Formwork System for Concrete Pouring System 1
  • Aluminum-frame Formwork System for Concrete Pouring System 2
Aluminum-frame Formwork System for Concrete Pouring

Aluminum-frame Formwork System for Concrete Pouring

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
1 m²
Supply Capability:
1000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1. Structure of Aluminum-Frame Formwork

Aluminium Frame Formwork System is designed to reduce material quantity, erection and dismantling time as well as effort, subsequently increasing efficiency and reducing general construction time, materials and labour cost. All main components are manufactured from high grade aluminium alloy. This structural grade aluminium has exceptional properties being extremely light in weight but also heavy-duty and durable. When incorporating this into a design which utilizes standard components and allows several possible plan and elevation variables, it provides a lightweight solution for a large area slab formwork system.

 

2. Main Features of Aluminum-frame Formwork System for Concrete Pouring

◆ Light panel weight, easy to carry.
◆ The complete formwork system for slab casting, easy & quick assembly.

◆ Working efficiency is greatly improved by fast erection and dismantlement.

◆ The panel can be supported by both props and scaffolding.

◆ Economical, versatile & hi-speed formwork system; comes with a permissible slab thickness of 400 mm.

◆ High standardization with components.

 

 3. Aluminum-frame Formwork System for Concrete Pouring Images

Aluminum-frame Formwork System for Concrete Pouring

 

 

4. Aluminum-frame Formwork System for Concrete Pouring Specification

-The frame is highly strengthened, and the wall formwork can bear lateral pressure 60 KN/m2 while the column formwork can bear 80 KN/m2.

-As a standardized system, it is flexible to assemble , wood batten can be filled to satisfy the need f of non-standard size.

-The adjustable steel clamp is convenient to use, and can hold tightly.

-There is a prizing part designed in the corner, which can help to position and remove formwork easily.

-The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

-The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

 

5. FAQ of Aluminum-frame Formwork System for Concrete Pouring

1) What can we do for you? 

    .We can ensure the quality of the Aluminum-frame Formwork System for Concrete Pouring and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

2) What promises can be done by us?

   . If interested in Aluminum-frame Formwork System for Concrete Pouring, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   .  Aluminum-Frame Formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

    .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Aluminum-frame Formwork System for Concrete Pouring, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  

Q: Case Study of Aluminum Alloy Formwork
Aluminum alloy template lighter than the steel template, the use of fast assembly and disassembly system, moving components, lightweight and flexible, greatly reducing the amount of artificial, easy construction management. Aluminum alloy template is one of the most advanced templates, the construction company image is good. Design advanced early demolition system, to speed up the construction progress.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords