Concrete Machinery Concrete Pump SP70.10.113D
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 500 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. The high quality hydraulic valves and oil pump use Germen REXROTH or Japan Kawasaki products.
2. The valve for change-over from high pressure to lower pressure is designed to be easily controlled, which can adjust the condition of the pump easily in accordance with the requirement of job site. Dismantle the tube is not necessary so that it can avoid the pollution.
3. Advanced hydraulic system which change direction hydraulically can run without electrical part.
4. Concrete piston can run back to washing tank, which can easily change the piston and be convenient for maintenance.
5. Tungsten steel glasses shaped plate and cutting ring guarantee long using life.
6. Hydraulic outriggers make easily positioning.
Model | Unit | SP70.10.113D | ||
Whole performance of pump | Max. theory concrete conveying capacity ( High pressure) | m 3 /hr | 50 | |
Max. concrete pumping pressure | bar | 95 | ||
(High pressure) | Mpa | 9.5 | ||
Theoretic maximum delivery distance | m | Horizontal | Vertical | |
498 | 142 | |||
Main oil pump | ml/r | 112 | ||
Distributing valve form | Apron valve | |||
Main oil cylinder size | mm | Φ100Xφ63x1400 | ||
(diameter X stroke) | ||||
Concrete cylinder size | mm | Φ180x1400 | ||
(diameter X stroke) | ||||
Concrete hopper | LX mm | 550x1300 | ||
(volume X charging height) | ||||
Outlet diameter | mm | Φ160 | ||
Power | Engine | Perkins(Model:1006-6T) | ||
system | Rated power | kW | 112 | |
Rated speed | r/min | 2200 | ||
Hydraulic | Hydraulic oil way form | Open circuit | ||
system | Hydraulic pressure | Mpa | 32 | |
Pressure of distributing system | Mpa | 16 | ||
Pressure of mixing system | Mpa | 14 | ||
Max mixing speed | r/min | 37 | ||
Hydraulic oil tank volume | L | 350 | ||
Other | Cooling way for hydraulic oil | Air cooling or water cooling | ||
data | Max. aggregate size | mm | Pebble 50, | |
Crushed stone 40 | ||||
Outline dimension | mm | 4250x1600x1650 | ||
Total weight | Kg | 4360 |
- Q:What is the difference between a concrete pump and a concrete pump
- The parameters of the main pump are used to determine the speed and transport height of the pump. The horizontal distance is determined by the length of the cloth rod. It is suitable for pouring concrete in fixed mode and can ensure the uniformity of concrete and increase the compactness.
- Q:What is the difference between concrete conveyors and concrete conveyors?
- The concrete pump is a special machine for conveying concrete. It is equipped with special pipes to transport concrete along the pipeline to the pouring site.
- Q:What are the requirements for the selection of concrete pump tubing and the setting of the bracket?
- The bracket shall be determined by calculation and, if necessary, the structure of the position shall be checked;
- Q:What is the meaning of cast - in - place concrete secondary grouting?
- Grouting large amount of multi-purpose mechanical, the main source of power for a large number of air compressors.
- Q:How to wash the concrete pump with a ball
- Concrete pump is through the pipeline to rely on the pressure to transport concrete construction equipment, it is equipped with special pipes, concrete can be carried out along the pipeline horizontal and vertical transport, is the existing concrete transport equipment in an ideal one, it
- Q:What is the difference between a concrete day pump and a ground pump?
- For high-rise, high-speed, overpass and other large concrete works of concrete transport work.
- Q:Will the role of concrete towing pump, concrete raw materials are sand or sand?
- Mainly a vertical or horizontal transport of commercial concrete a heavy machinery and equipment.
- Q:What is the cause of concrete pump blockage?
- To identify the clogging site, with a mallet to plug the concrete mixture at the plug, and then through the concrete pump is anti-pump to eliminate the block.
- Q:What is the working principle and structure of a concrete pump truck?
- , Super-large boom (such as semi-trailer train pump) need a larger drive power, the car engine can not meet and reprovision the engine to drive a dedicated work device.
- Q:What is the depreciation period for concrete and concrete carriers and how much net residual value is
- The net residual value is the portion of the value of the residual value minus the fixed asset clean-up fee payable after the expiration of the use of the fixed asset.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Concrete Machinery Concrete Pump SP70.10.113D
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 500 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords