• Cold Rolled Steel Coil JIS G 3302  Chinese Steel System 1
  • Cold Rolled Steel Coil JIS G 3302  Chinese Steel System 2
  • Cold Rolled Steel Coil JIS G 3302  Chinese Steel System 3
Cold Rolled Steel Coil JIS G 3302  Chinese Steel

Cold Rolled Steel Coil JIS G 3302 Chinese Steel

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
7655 unit
Supply Capability:
3434 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Structure of Cold Rolled Steel Description:

The raw material of cold rolled steel coil/sheet is high quality hot rolled product, and after pickling continuous rolling, degreasing, annealing,skin pass,slitting and cut to length line etc. Along with it many kinds of new  technology and new process of global cold rolling production have been applied. Therefore the quality of the goods could be guaranteed. The product is widely used in outdoor and interior decoration, furnishing manufacturing, home appliance, automobile etc. 

2.Main Features of the Cold Rolled Steel

• Excellent process capability

• Smooth and flat surface

• Workability, durability 

• Excellent heat resistance performance

 High strength

 Good formability

• Good visual effect

 

3.Cold Rolled Steel Images

Cold Rolled Steel Coil JIS G 3302  Chinese Steel

4.Cold Rolled Steel Specification

Standard:AISI,ASTM,DIN,GB,JIS,JIS G3302 ASTM 653M EN10142

Grade: Q195~Q345

Thickness: 0.16mm~1.5mm,0.16-1.5mm

Width: 1250,600-1250mm

Coil weight:3-12 MT

Coil ID:508/610mm

Chemical composition:

C

Si

Mn

Cr

Ni

P

S

0.150

0.476

11.231

12.50

0.900

0.039

0.010

 

 

5.FAQ of Cold Rolled Steel 

We have organized several common questions for our clients,may help you sincerely: 

1.How about your company?

A world class manufacturer & supplier of castings forging in carbon steel and alloy steel,is one of the large-scale professional investment casting production bases in China,consisting of both casting foundry forging and machining factory. Annually more than 8000 tons Precision casting and forging parts are exported to markets in Europe,America and Japan. OEM casting and forging service available according to customers requirements.

2.How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

3. How long can we receive the product after purchase?

Usually within thirty working days after receiving buyers advance payment or LC. We will arrange the factory manufacturing as soon as possible. The cargo readiness usually takes 15-25 days, but the shipment will depend on the vessel situation.

Q: i own my own construction and landscaping company and have 7 years experience in an excavator bulldozer and other pieces of heavy machinery.
There isn't any machinery there to speak of. There isn't any government there to speak of. Perhaps contact Habitat for Humaniy; in a few months they may need someone with your skills to help in the rebuilding process--which is going to go on for YEARS.
Q: What is difference between machine and machinery?Because I'm learning Accounting Principles for A Levels, and under the heading of 'Fixed Assets', machine and machinery are two different examples.
Machine And Machinery
Q: Can a private project manage the construction machinery?
Fujian Province, Hunan Province, Jiangsu province and other regions in the China device management protocol initiative and guidance, set up management mechanism of engineering machinery, engineering machinery for the management of the local, but the census registration filing, in accordance with the principle of voluntary, not mandatory. And in accordance with the existing laws and regulations of the state, in addition to some parts of the construction lifting machinery mandatory scrap requirements, the other construction machinery did not put forward the mandatory scrap requirements.
Q: I figure construction sites need machinists
MRs are shipboard ratings, not Seabees. The Seabees have their own guys (SWs, I'd imagine) who do the same stuff that MRs can do. So, no, you'd never see an MR with the Seabees.
Q: in the middle of the playing season. Im stuck on this particular question for an assignment and cant find a definetive answer? Basically want to know the correct machine that is used to go 200 mm in depth, so if there are any bowling green care takers that can answer this thatd be a great help thanks
hey,i think you should use ground driller kind of things
Q: I want to know if while you're toasting something and you tank the plug out of the outlet before turning it off, does it ruin the machinery?
Since you or someone you know onviously did that (unless your like really random) the best way to find out is a: plug in the toaster. B:turn it on. If it turns on then no it does not ruin it
Q: How to detect any problem in used machinery?
When you go out to buy a used machinery, try to search for the sites online which offer quality services and affordable deals. As these sites would guide you throughout the buying process. You would get solutions to all your problems from an expert.
Q: I want to buy some used machinery worth $20,000.00 from Canada to USA. does anybody know if I can just put it in Uhaul truck bring it back or do I have to pay duties how much
I believe you have to get the machinery past customs and you have to get import paperwork done.
Q: i'm trying to record my band's demos onto a cassette recorder/mixer, and then get them onto cds. is there a piece of machinery that can transfer an audio tape onto a cd?
I don't know if you want to do this but your question reminds me of my Mp3x blastr I have it plays everthing and convert songs from tape to cd.It's cost 50 bucks for the mp3x blaster at a office depot or any place that sales pc equipment.It comes wit a disk and a hookup for cd player,tape player,etc.Even thought it cost 5o bucks it will be the best 50 bucks you spent.
Q: Material costs, machinery costs, management costs, labor costs accounted for the proportion of construction projects
5, travel expenses, property insurance, 6, 7, 8, engineering maintenance fees, sewage charges, 9, labor protection fees, inspection fees, 10 test, 11, outside the unit management fee, 12, finishing materials and sporadic freight, 13, material shortage and damage

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords