• Coated Alkali-resistant fiberglass mesh cloth (gram weight 60) System 1
  • Coated Alkali-resistant fiberglass mesh cloth (gram weight 60) System 2
Coated Alkali-resistant fiberglass mesh cloth (gram weight 60)

Coated Alkali-resistant fiberglass mesh cloth (gram weight 60)

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

You Might Also Like

Coated Alkali-resistant fiberglass mesh cloth is

based on C-glass or E-glass woven cloth and

treated by alkali-resistance copolymer resin on

the surface.

The woven cloth is made of fiberglass yarn or

roving by means of leno or plain weave.

The diameter of elementary fiberglass varies

between 9 and 15 micron.

The resin used for the surface treatment ensures

the property of alkali-resistance and increases

the mechanical durability that is required by the

construction industry.


Q: Can steel tube couplers be used in suspended scaffolding systems?
Indeed, suspended scaffolding systems can utilize steel tube couplers. In construction and scaffolding scenarios, steel tube couplers are widely employed to securely join steel tubes. These couplers establish a robust and dependable connection between the tubes, guaranteeing the stability and safety of the scaffolding system. Engineered to endure substantial loads, steel tube couplers provide a secure connection capable of withstanding the pressures and forces exerted on the scaffolding system. Consequently, they are well-suited for deployment in suspended scaffolding systems that bear the weight of workers, tools, and materials while being suspended from above.
Q: Are there any weight restrictions for steel tube couplers in scaffolding?
Yes, there are weight restrictions for steel tube couplers in scaffolding. The weight restrictions vary depending on the type and size of the coupler, as well as the specific scaffolding system being used. It is crucial to consult the manufacturer's guidelines and specifications for the couplers to determine their maximum load capacity. Exceeding the weight restrictions can compromise the structural integrity of the scaffolding system and pose a serious safety risk to workers. Therefore, it is essential to adhere to the recommended weight limits and ensure that the scaffolding is properly designed and assembled to support the intended loads.
Q: Good wooden doors or solid wood doors good? What's the difference?
Good wooden door, the price is high, to about 10,000 yuan, solid wood doors are wood stitching
Q: How thick is the pvc board?
Hardness PVC board: has good chemical stability, corrosion resistance, hardness, strength, high strength, anti-ultraviolet (anti-aging), fire-retardant (with self-extinguishing), reliable insulation, smooth surface smooth, not Absorbent, no deformation, easy processing and so on. The product is excellent thermoforming material, can replace part of the stainless steel and other corrosion-resistant synthetic materials, is widely used in chemical industry, oil, electroplating, water purification equipment, environmental protection equipment, mining, medicine, electronics, communications and decoration industries The Product thickness: 0.8-30mm Product width: 1300mm 1500 mm Accessories processing: PVC processing parts Reed can be produced according to customer needs, can be hot-rolled, hot, CNC, and so on. PVC soft board: laminated sheet: 2-60mm Product width: 1000mm × 2000 mm PVC transparent board: high-strength, high transparent plastic sheet, the product color is white, sapphire blue, brown, brown and other varieties. The product is high strength, high transparency, good weather resistance, non-toxic, health, physical properties better than plexiglass. Widely used in equipment protection board, interior, drinking water tank, liquid level display. Product thickness: 2-20mm Maximum width of products: 1300mm Product Length: 100-10000mm Recommended Specifications: 1300 × 2000mm PVC soft board (coil): surface gloss, soft. There are brown, green, white, gray and other colors to choose from, the product material, fine production, widely used. Features Soft and cold, wear, acid, alkali, corrosion resistance, excellent tear resistance, with excellent weldability, physical properties than rubber and other coil. Used in chemical, electroplating, electrolytic cell lining, insulation cushion, trains, automotive interiors and auxiliary materials.
Q: In a layer of 6 meters high in the big room, do 2.8 meters high light steel keel partition. Big room to do mineral wool board ceiling, how to connect the two?
Can be directly connected, but not solid. How are they all know what they are.
Q: What are the different types of wall formwork systems that can be used with steel frame formwork?
There are several different types of wall formwork systems that can be used with steel frame formwork. Some of the common types include: 1. Panel formwork: This is the most commonly used type of wall formwork system. It consists of large prefabricated panels made of plywood or steel framed with plywood. These panels are connected together to form a solid wall formwork. 2. Climbing formwork: This type of formwork is used for constructing tall walls or high-rise buildings. It consists of a self-climbing system that allows the formwork to be lifted vertically as the construction progresses. This eliminates the need for external scaffolding and provides a safer and more efficient construction process. 3. Slip formwork: Slip formwork is used for constructing vertical structures with a smooth finish, such as elevator shafts or chimney stacks. It involves a continuous pouring of concrete into a moving formwork system. As the concrete sets, the formwork is slowly raised, creating a seamless concrete structure. 4. Tunnel formwork: This type of formwork is used for constructing walls in tunnels or underground structures. It consists of large steel forms that are assembled and connected together to create a continuous wall formwork system. The forms are then filled with concrete to create the tunnel walls. 5. Jump formwork: Jump formwork is used for constructing vertical structures with a repetitive pattern, such as columns or piers. It involves a system of adjustable vertical forms that are lifted and repositioned as the construction progresses. This allows for fast and efficient construction of multiple vertical elements. These are just a few examples of the different types of wall formwork systems that can be used with steel frame formwork. The choice of system will depend on the specific requirements of the project, including the type of structure being built, the height of the walls, and the desired finish.
Q: The kitchen floor slants from the outside wall toward the center.
It depends on how far out-of-level the floor is. If it is less than an inch out of level then you could put plywood or luan in the low area and use a leveling compound to feather the edges and bring everything up to one level plane. If it is more than an inch it would probably be best to remove the subflooring (plywood) and then one of four things; 1) Correclty install new floor joists. 2) Remove and re-hang the old floor joists (level of course) 3) Cut shims glue and nail them to the tops of the joists 4) 'Sister' new joists along side the old joists. Finally you would need to put subflooring back down and install new flooring. Very Important: You would want to be sure that the cause of this problem was correctly addressed. Sometimes an out-of-level floor can be indicative of pretty serious problems. Through out this process you would want to consider how these changes correspond to the level of the adjacent rooms. For example; you would not want to step up 2 inches while walking into the bathroom.
Q: I can't afford much more than a house that needs work. Not afraid of that at all, except windows and roof. What kind of prices should I expect if I want replacement windows or roof repairs. I don't want a get down estimate, I don't own a house yet. Just want an idea what other peeps have paid so I know if I'm making a bad decision or not. Thanks!
As far as the roof estimates would start with: -if you needed the entire roof torn off & re-done -if there was 1 roof or 2 (if they previously re-layed the new roof over the old). -& of course how big & type of materials used/wanted Now the windows would start with: -how many needed to be replaced -the size of the windows -the type of window (vinyl or alumiunm) plus...trim or no trim. I have a single family home with a slanted roof. I got an estimate for 5 thousand for a new roof. I already had the windows replaced for 12 thousand. (18 large windows, 2 frosted) They're all double hung vinyl windows with the trim done. (thank god we have a LIFE TIME WARENTY, that is transferable) Good Luck!
Q: Are steel props adjustable with remote control mechanisms?
No, steel props are not typically adjustable with remote control mechanisms. They are usually manually adjusted by hand or with the use of mechanical tools.
Q: The hammer took a chip out of one tile, the chip is about the size of a pencil eraser. I‘m just heartbroken as we just had this tile installed 12 days ago! Is there any way to fix this- short of replacing the tile? I‘ve already bought a rug that will cover the hole but I‘d still like to fix it if I can. Just in case we ever would like to go without a rug. Thank you!!!
Got any tiles left over from the job? You can (carefully!) chip the old tile out in pieces with a hammer and a chisel, (VERY carefully!) chip out the grout between the broken tile and the ones next to it. and chip out the cement under the broken tile until you're down to the backer board. Once that's done, clean out all the chips, dust, etc, and chip out the cement that you missed. Clean again, check for still more cement (it's persistent stuff), until the area is clean. Set the spare tile down in the space to make sure it fits OK. It should set below the level of the other tiles. If not, you missed some cement. Go back to step B. Finally, you're ready. Mix some tile cement, dump a glop in the center of the cleared area, spread it around, and use a tile trowel if you have one to spread it and groove the cement. The grooves let you spread the cement and give it some extra area to fasten to the back of the tile. Put the tile in place, wiggle it around and move it until you like where it's sitting, wipe up any cement that oozed up around the sides, and don't walk on it for 2 days. Finally, mix up some grout, spread it into the seams, wipe it off the tiles around the seams, and don't walk on it for another day. Seal the seams, and carry your hammer carefully from now on.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches