• CNC Vertical Machining Center Modle:ME1100 System 1
CNC Vertical Machining Center Modle:ME1100

CNC Vertical Machining Center Modle:ME1100

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing
Model No.  cnc vertical machining centerME1000ME1100ME1300

 

 

Capacity

cnc vertical machining center

X axis travel/mm85011001300
Y axis travel/mm560600700
Z axis travel/mm610550610
Spindle nose to table surface/mm150-760150-700150-760
Spindle nose to column surface/mm610650785
WorktableTable size/(L*W)1000*5601200*6001400*650
Max load on the table/kg5008001000
T-slot size/mm18*5*10018*5*11018*5*100
SpindleSpindle speed/rpm60-800060-800060-8000
Spindle taper/spindle shank7/24 Taper BT407/24 Taper BT407/24 Taper BT40
Max spindle inner diameter/mmΦ70Φ70Φ80
Spindle motor(30 mins,mitsubishi)/kw7.51111
Feed rateX,Y,Z rapid traverse/M/min15/15/1524/24/2418/18/15
Max cutting feed rate(M/min)10/10/1010/10/1010/10/10
A.T.CTool storage capacity/pc2424Armless type 24
Max tool diameter(adjacent tools)/mmΦ150(80)Φ150(80)Φ150(80)
Max tool length/mm300300300
Tool change time(T-T)/sec2.52.52.5
AccuracyPositioning accuracy/mm±0.01±0.01±0.01
Repeatability positioning accuracy/mm±0.005±0.005±0.005
Machine sizeMachine height/mm260026002600
Space requirement(L*W)2800*24503200*25003500*2700
Net machine weight/kg5800650010000
Power requirement/KVA202030
Drive motor/kw2.0/2.0/2.02.0/3.5/2.02.0/3.5/2.0
Control systemSiemens 808DSiemens 808DF-0iMD/M70


Standard machine configuration

cnc vertical machining center

1. Control system:F-0iMD/M70 .
2. 7/24 Taper BT40 spindle ,8000rpm spindle from China Taiwan, HNC Servo motors
3. armless type A.T.C system,20 tools;
4.fully enclosed splash guard of machine
5.steel telescopic covers for 3 axis guide rails
6.work lamp and alert lamp
7.tool box and maintenance tool
8.heat exchanger
9.auto lubrication system
10.separate water tank
11.handwheel
12.380v/220v,50HZ transformer
13.free standard accessories

Main part supplier

cnc vertical machining center

1. controller: F-0iMD/M70 from China Taiwan
2. x/y/z servo motor: HNC servo motors from China
3. x/y/z drive and converter: made in China
4. spindle motor: made in China
5. ball screw :made in Taiwan(Hiwin Brand)
6. ball screw bearing: HRB made in China(Chinese No.1 bearing)
7. spindle bearing :HRB from China.
8. handwheel: SUMTAK from Japan
9. electrical component: made from China Taiwan

 

Q: To save on precious water, time and money
The usual way for the washing machine to rinse the clothes after they have been washed is for it to refill up with clean water and slosh the clothes about for a while before draining out the water. Spray rinse is a method where after the clothes have been washed fresh water is sprayed on them as they are tumbled about , this uses less water.
Q: I have a few questions about this. I have 13 years experience driving all kinds of things. I use backhoe, front end loader, forklift and large trucks with trailers.Is there a demand for people with my skills in Denmark?How much money could I expect to make?Do any of the vehicles I use require a special license in Denmark?
I wonder why you don't check this and instead keep issuing questions on Yahoo answers for which you are likely to get incorrect info In less than a minute on google I could find the official immigration dept site in Denmark and the page on skilled migrants like what you are talking about (and which I informed you about in the last question) As you can see here www.nyidanmark.dk/en-us/coming_to... it is a very clear concise site and it gives a link to exactly which occupations are considered as in demand www.nyidanmark.dk/en-us/coming_to... and drivers (forklift or otherwise) are not on this list Also it clearly stipulates that you must already be earning a salary level of minimum DKK 463,050 per year which is approx 62,077. Therefore I think you can assess by yourself the chances of receiving a working visa.
Q: Trading of machinery, minerals, antiques
is worth two in the bush?
Q: Any used heavy earth moving machinery for sale/auction in maryland(MD)?
The website below may provide some tips on locating heavy machinery for sale in MD.
Q: Can a private project manage the construction machinery?
To this end, Yan Ping put forward from the introduction of the national level to strengthen the relevant standards of construction machinery industry management laws and regulations, clear responsibilities and rights, make the construction machinery management mode gradually move closer to the vehicle management system, and promote the healthy development of the construction machinery industry Chinese.
Q: I started going back to the gym Bally's and I road the bikes for about an hour. My legs are killing me but I felt good afterwards mentally. What machines should I use to focus on Weight Pounds.
You could add the elliptical too but keep a good mix so you work different muscles.
Q: 2. Prepare balance of Machinery account on following dataOpening Balance on 1 jan 2010 - 1,20000Purchase of new machinery in yr 2010- 60,000Destruction of machinery due to fire - 12000What is balance on Dec 2010
Assuming all this is at cost and we don't have to worry about depreciation, AND if the opening balance is 120,000, then Opening Balance on 1 jan 2010 - 120,000 + Purchase of new machinery in yr 2010- 60,000 - Destruction of machinery due to fire - 12000 = balance on Dec 2010 $168,000
Q: I'm interested in investing in candle lantern manufacturing because of low competition in my local area but I'm not sure where to start and what equipment would be needed to start manufacturing on low scale. Is there any good read on how are lanterns recycled and what additional equipment would be needed to recycle them? Please go into as much details as possible.
From my understanding, most of these candle lanterns are hand- made.
Q: Material costs, machinery costs, management costs, labor costs accounted for the proportion of construction projects
5, travel expenses, property insurance, 6, 7, 8, engineering maintenance fees, sewage charges, 9, labor protection fees, inspection fees, 10 test, 11, outside the unit management fee, 12, finishing materials and sporadic freight, 13, material shortage and damage
Q: I ve been going to school for HVAC for about a month now. And I was just wondering if anyone had any tips on reading schematics or wiring the machinery up. ( besides make sure the power is off) Each day I get it a little more but I was just wondering if any experts had some tips. Also how is the pay when you get out of school? Please don't tell me to go to salarey I just wanted to know for someone with 1st hand experience. I live in Ma. Thanks in advance
I had an comparable information loss. I emailed the help and that they urged me it replace into lost, and to layout the information :S in spite of if you obtain the schematic, each and each little element might desire to be so micro sized, you're able to opt to no longer do something as suitable perhaps a loopy re-soldering of a broken connection. danger is there are no longer any broken connections, or something a shopper might desire to opt to repair. Strongbad defines technologies as: something it extremely is very cool, and if it breaks you need to purchase a sparkling one probably the information basically corrupted, so there does no longer be of project of even swapping the flash memory to a diversechronic.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords