• Carbon Steel Hot Nolled I Joist Beam For Roof Support System 1
  • Carbon Steel Hot Nolled I Joist Beam For Roof Support System 2
  • Carbon Steel Hot Nolled I Joist Beam For Roof Support System 3
Carbon Steel Hot Nolled I Joist Beam For Roof Support

Carbon Steel Hot Nolled I Joist Beam For Roof Support

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
10000 pc
Supply Capability:
300000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1.Brief Description

  

Metal steel track used for drywall partition system

Bottom width: 70mm

Flank hight: 34.5mm

Thickness: 0.5mm, length:3000mm

Package: 10 pcs /bundle with palstic strip or iron wire

MOQ: 10 tons

Conveyance: Qty 14900pcs  40'GP

Payment term: T/T, 30% deposit at least

Delivery time: 10-15 days after received deposit

 

2.Characteristic

 Specifications

Light Steel Keel
1.Material: Galvanized Steel
2.Accept Customization
3.Free Sample Offer
4.Promptly delivery

Light Steel Keel

 

Details:

1) Material: galvanized steel
2) Zinc coating: from 100~275g per square meter
3) Yield strength 400mpa.
-Raw materials : ZINC coating from 80 to 275 gram per square meter .
- Thickness : Form 0.50mm to 2.0mm .
- Dimension : Length : up to 11.85 meters ,Width : From 40mm to 250mm and Hight from 30mm to 80mm

 

Usage:

purlin and wall beam of steel structure building

The C-shaped purlins have excellent anti-bending property and are easy to install. They are widely used as the supporter of roof and wall in large-scale and mid-scale construction, such as factory, warehouse, garage, exhibition center, cinema, theatre, garden and so on.

 

3.Image

 

Carbon Steel Hot Nolled I Joist Beam For Roof Support

 

 

4.Detailed Specification

 

High Guality Carbon Steel Hot Nolled I Joist Beam For Roof Support

 

5.FAQ 

Advantage:

(1). Design according to customers’ requirements

(2). Manufacture under complete quality control system---ISO9001

(3). Installation with instruction of experienced engineers

(4). Easy to assemble and dismantle

(5). Eco-friendly material: can be used for several times and can be recycled

(6). Shorter construction period, longer using time

(7). High strength and stiffness, high weight bearing.

e of force 7 degree

Q: Light steel keel wall to withstand the number of wind load
Light steel keel is a new type of building materials, with the development of China's modernization, in recent years has been widely used in hotels, terminals, passenger stations, stations, theaters, shopping malls, factories, office buildings, Interior decoration, ceiling and other places.
Q: The designer said the solid wood flooring keel hit the prefabricated board after the lack of effort in the future may not be strong?
1: you have the conditions or bricklayers, practice: build the wall of the place, you can add a reverse beam (plus a beam on the floor) and then wall, reinforced concrete beam; another direct to do the word steel or channel to do Beam, pay attention to the two heads to be on the point of support. Build the wall again. ? 2: do light steel keel gypsum board wall accidentally wear a hole. Is a short time to be. Not moisture, is easy. 3: the floor can be made of wood, the material with a little bigger. Encrypt a little bit. The problem is not big, other solid floor to do on the ground fixed point has changed the day.
Q: Lightproof wall how to fire
These three criteria are three basic requirements for detecting whether a partition can reach a certain refractory limit; Landlord asked if the fire? Very simple to say that fire is built on the basis of thermal insulation to achieve the purpose of fire;
Q: Shanghai light steel keel ceiling wall how much labor costs?
Do not know how much of your area may be a little expensive point of the ceiling 10 yuan / square wall 80 / side less expensive to the point is not the same everywhere, roughly in the 20 to 25 or so labor price.
Q: Light steel keel wall in the end is how much money to know
Such a small area. But also deduction doors and windows. It is estimated that many people are willing to do. Beijing's labor costs are also high. Generally cut off about 75 square meters.
Q: To warm the above has been tiled, with light steel keel to build a wall, how to fix the keel?
With C-beam or two angle steel, LI put two and wall fixed, the keel fixed to the LI. Do not be able to drill on the ground.
Q: Light steel keel gypsum board partition design should pay attention to what the problem
Each brand installation and installation methods and characteristics will be different, I will take the Nexu light steel keel brief description of the next.
Q: How to construct double - sided double gypsum board partition wall
Line: according to the design and construction plans, in accordance with the keel width of the elastic line, has been done on the ground or ridge to release the wall position line, door and window openings border line, and put the top, wall keel position edge. To cover the panel of the long, wide sub-file, to ensure that the keel position is correct. Heaven and earth keel installation, along the ball line fixed top, to keel, fixed point spacing should not be greater than 600mm, keel docking should remain straight. Fixed keel keel, keel the end should be fixed, fixed should be solid. Wall, column edge keel with nails or wood screws and walls, column fixed, nail distance of 1000mm.
Q: Home to do light steel keel partition sound insulation, dare not use glass wool, with sponge or benzene as a filler for what kind of noise, good environmental protection
Home with several levels? You can use benzene board, in a good extrusion, in the good is the polyurethane and phenolic, the cost will be high. Phenolic is nonflammable. Benzene and extruded can not reach fire
Q: Shanghai Light Steel keel ceiling Shanghai plant decoration office building decoration light steel keel ceiling wall
Effective space division The internal space of the plant is mainly divided by the operator according to their actual use requirements to make reasonable use of space, if the plant has a large number of equipment, it is not appropriate to set too much partition and partition, as far as possible to the ground color or with some Color identification to the division of the region, with the identification of the area to avoid too much color, so not only the regional division is not obvious also feel dizzy, and some plants can be clearly divided into the equipment area and office area, such a plan It is now more common because it is easy to manage. Then in the design of such a plant must master the data and the close combination of space, but also take into account the equipment area and the working area of the work area is smooth and dust, noise interference.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords