10t MD1 wirerope electric cable hoist High Quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 200 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Condition: New
Place of Origin: Hebei, China (Mainland)
Brand Name: CNBM
Model Number: MD1-10T
Usage: Construction Hoist
Power Source: Electric
Sling Type: Wire Rope
Maximum Lifting Weight: 10T
Maximum Lifting Height: 30M
Lift Speed: 0.8/8M/MIN
Certification: CE&GS
Warranty: one year
After-sales Service Provided: No overseas service provided
Capacity (t): 10t
Standard lift height: 6~30M
Lifitng speed: 0.35/3.5M/MIN
Color: as your wish
Main Feature
The electric cable hoist is kind of light and small lifting equipment,which is easy and convenient for operation.It consists of electromotor,transmission mechanism and winding drum or chain wheel.and it can be divided into steel wire rope and loop chain elecric cable hoists.The electric cable hoist is mainly used in industrial and mining enterprises,or some places that need lifting goods,such as warehouse,wharf,ect.In general,the lifting capacity of our electric hoist ranges from 100kg to 1000kg,and the lifting height ranges from 3m to 30m
Product Picture
Product Parameter
Product Description
CD1/MD1 electric wire rope hoist series is our main and advantage product, So we can surely offer you high quality but competitive price.
The capacity of CD1/MD1 electric wire rope hoist series could be 0.5-10T.
They are widely used to hoist heavy objects, or to install on the straight or curve 1-steel beam of single-girder cranes. They can also be used together with electric. hoist double-girder, gantry crane and slewing cranes. All the above has made the electrical hoists common in industrial and mine enterprises, railway, wharfs and warehouses.
To satisfy the requirement of heavy duty hoists work, our factory also produce HC-A and HC-B type electric wire rope hoists. The capacity of HC series could be 10-120T(if you need big capacity, you should choose HC)
We can design it for your requirements.
The lifting speed of CD1 type is general speed, it can satisfy the requirement of general use; The lifting speed of MD1 type has two lifting speed, general speed and slow speed. The slow speed can satisfy the requirement of precision loading and unloading, examine and repair machine tool etc. precision work. Therefore, the useful scope of MD1 is wider than CD1 type.
CD1/MD1 type of wirerope electrical hoists can be widely used to hoist heavy objects, or to install on the straight or curve 1-steel beam of single-girder cranes. They can also be used together with electric. Hoist Doublegirder, gantry crane and slewing cranes. All the above has made the electrical hoists
common in industrial and mine enterprises, railway, wharfs and warehouses.
Packaging & Shipping
All our packing ways are standard packing. In wood case or carton, as you like. After the production, we will do our best to do the shipping as soon as possible. Best Service is our sart of business.
Our Services
1.We can make special sample according to the customer’s requirement.
2. We have more than 60 professional technical team, provide best after-sales service
3. Fast delivery time
4. We have CE, ISO9001 and GS certification.
- Q: HI people..i need info about screw hoists,i.e. for what they are used and with what it is made of. Thanks a lot.
- challenging thing. search with a search engine. it might help!
- Q: Rahim Moore pulled a Bill Buckner in last years playoffs and cost the Broncos a chance at a super bowl ring. should I let it go after we hoist the Lombardi Trophy this season?
- Super Bowl? Peyton Manning hasn't even won a single playoff game in 4 seasons let's see him win a game first before we say he'll win 4 straight playoff games to win the super bowl. Last time I checked Peyton Manning had 3 turnovers that game, and the game sealing interception. I believe it's just as much as Manning's fault as it is Moore.
- Q: a)What is the tension in the top link of the chain.b)What is the tension in the bottom link of the chain. c)What is the tension in the middle link of the chain.
- Tension should be 160N in the entire chain assuming it is inelastic and weightless.
- Q: tomas is a scout what should he do when the flag is hoisted?
- Salute. Whenever there is a flag raised there is a salute. The flags on the Moon, at the top of Mountains, on ships, royal castles - there is a salute. I hope that is the answer you require.
- Q: 20.0m above the ground, the cable brakes and the bricks begin to fall. If there is a safety net set up 2.00m about the ground, what does the spring constant of the net have to be so that the crate of bricks just touches the ground when the net stretches downward?
- We have ke = mg(H - 2) = 1/2 kdX^2 = pe; so k = 2mg(H - h)/dX^2 = 2*500*9.8*(18)/4 = 44100 N/m ANS.
- Q: it is a contraption you use to take off the hardtop in order to use the soft top
- I've seen those hoists as well but they usually have to be mounted on a ceiling and are big contraptions. It does take 2 people to lift that hardtop but it can be done in just a few seconds when you do add or remove it. I'd just get a family member or neighbour to help you those 2 times each year you need it.
- Q: would it be worth buying a 97 hyundai sonata with a v6 for $3000.00 if I have to replace the trans control module. I know its under the heater box. is it easy to replace? or better yet how do I install the part and what else would I have to do to get the check eng. light to turn off?
- if you have a hoist it would make the job easir but its on top on the gearbox.
- Q: You are helping to repair a roof by loading equipment into a bucket that workers hoist to the rooftop. If the rope is guaranteed not to break as long as the tension does not exceed 450 N and you fill the bucket until it has a mass of 42 KG, what is the greatest acceleration that the workers can give the bucket as they pull it to the roof?
- You are helping to repair a roof by loading equipment into a bucket that workers hoist to the rooftop. If the rope is guaranteed not to break as long as the tension does not exceed 450 N and you fill the bucket until it has a mass of 42 KG, what is the greatest acceleration that the workers can give the bucket as they pull it to the roof? 1st Choose one direction as positive. I choose up as positive!! The weight is a downward force. Weight = 42 * 9.8 = -411.6 N The tension is an upward force = +450 N The sum of these 2 forces causes the mass to accelerate!! +450 + -411.6 = 42 * a +38.4 = 42 * a Maximum acceleration = +0.914 m/s^2 UP
- Q: What is the price of the 1.5 T electric gourd
- If we need to make the chain electric gourd locally, we also have WKTO, LIANA, TONNEMAX brand, single phase, frequency conversion, double speed, etc.
- Q: 1) A 60 foot length of steel chain weighing 10 pounds per foot is hanging from the top of a building. How much work is required to pull half of it to the top?2) A bucket weighing 1000 pounds is to be lifted from the bottom if a shaft is 20 feet deep. The weight of the cable used to hoist it is 10 pounds per foot. How much work is done lifting the bucket to the top of the shaft?3) A spring has natural length of 1 meter. A force of 24N is used to stretch the spring to a length of 1.8 meters.a) Find the force constant kb) How much work will it take to stretch the spring 2m beyond its natural length?c) How far will a 45N force stretch the spring?Please show work so that i can understand how you got your answer because i have the answers just don't know how it's done thank you! =)
- 1) W = Fs (where Work = Force * Distance changed) The force F in this case is the Weight of the object. This is given as 10 pounds/foot *60 foot = 600 pounds S = change in distance. This is given as 1/2 the total length of steel = 1/2 * (60) = 30 feet So W = Fs = 600 * 30 = 18,000 Joules 2) Again W = Fs There are TWO objects here so we need to sum the two work equations together. In other words, there are two forces and distances involved. The first force F1 is the Weight of bucket,given as 1000 pounds. Change in distance = 20 feet; So Work 1 = F1*s = 1000*20 = 20,000 Joules The second force F2 is the Weight 2 of the cable, which is 10 pounds/ft * 20 ft = 200 pounds. Work 2 = F2 * s = 200*20 = 4,000 Joules Thus, Work 1 + Work 2 = 20,000 + 4,000 = 24,000 Joules The weight of the object * distance changed = Work done to lift bucket = 1000 * 20 = 20,000 Joules 3a) F of spring = kx (where k = force constant, and x = change in length of spring) So 24 = k (1.8) or k = 24/1.8 = 13.33 N/m b) W = Fs = 24*2 = 48 Joules c) F = kx From above, k = 13.33 N/m Given F = 45N So 45 = 13.33 * x x = 45/13.33 = 3.38 meters
Send your message to us
10t MD1 wirerope electric cable hoist High Quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 200 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords