• Building Hoist SC200/200B with  Double Cages System 1
  • Building Hoist SC200/200B with  Double Cages System 2
  • Building Hoist SC200/200B with  Double Cages System 3
  • Building Hoist SC200/200B with  Double Cages System 4
  • Building Hoist SC200/200B with  Double Cages System 5
  • Building Hoist SC200/200B with  Double Cages System 6
  • Building Hoist SC200/200B with  Double Cages System 7
Building Hoist SC200/200B with  Double Cages

Building Hoist SC200/200B with Double Cages

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT or LC
Min Order Qty:
-
Supply Capability:
15 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Building Hoist Description

The construction hoist product  produced by Fangyuan has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And Fangyuan is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad.

 

Building Hoist Features

1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.

Building Hoist Specification
SC series product also has special design, such as reinforced guide rail with cross-section of 800mm, inclined type, special for cooling tower, etc. All the double cage construction elevator can be changed into single cage type, such as SCD200.

Model

SC200/200

SC200/200BP

SCD200/200

SC200/200B

Configuration

Standard type

Frequency conversion

Counterweight type

Export type

Rated load

kg

2000/2000

2000/2000

2000/2000

2000/2000

Cage size L×W×H

m

3×1.3×2.2

3×1.3×2.2

3×1.3×2.2

3×1.3×2.2

Passengers

16/16

16/16

16/16

16/16

Max.lifting height

m

150

300

150

150

Max.height of free end

m

9

9

9

9

Lifting speed

m/min

33

0~60

33

33

Capacity of small hoist

kg

200

200

200

200

Std.section L×W×H

mm

650×650×1508

Electric motor

Type

Disc brake electic motor

Power

kW

11×3/11×3

11×3/11×3

11×2/11×2

11×3/11×3

Speed limiter

Action speed

m/s

1.2

1.45

1.2

1.2

Rated brake load

kN

40

40

30

40

Model

SCD200/200B

SC100/100

SCD200

Configuration

Counterweight type

No counterweight

Counterweight type

Rated load

kg

2000/2000

1000/1000

2000

Cage size L×W×H

m

3×1.3×2.2

3×1.3×2.2

3×1.3×2.2

Passengers

16/16

12/12

16

Max.lifting height

m

150

150

150

Max.height of free end

m

9

9

9

Lifting speed

m/min

33

33

33

Capacity of small hoist

kg

200

200

200

Std.section L×W×H

mm

650×650×1508

Electric motor

Type

Disc brake electic motor

Power

kW

11×2/11×2

11×2/11×2

11×2

Speed limiter

Action speed

m/s

1.2

1.2

1.2

Rated brake load

kN

30

30

30

 

 

 

FAQ

Q: What is the Motor u use

A: There are many options for customer. We have China domestic famous brand such as Zhangjiang motor or Baoda Motor. Also customer could choose Germany brand such as Siemens, Schneider, or Nord.

 

Q:What is Safety Device

A:The safety device is patent product of china. When a cage over-speeds the device should act cut off the power stop the cage on mast gradually. the safety device are adjusted and sealed. Do not disassemble it. The using time limit of safety device are signed on it’s nameplate. Safety device must be delivered to the factory and inspected after it reached to.

 

 

 

Q:What is the need for the sc200/200 construction elevator cable?
General is 3 times 16 + 2 * 6, want to know can seek professional construction lift machine cable market manufacturer ask
Q:There are differences between the construction elevator and the construction elevator
Construction lifter and building construction elevator, manned cargo construction machinery is a frequently used in construction, because of its unique enclosure structure make it take up both comfort and safety, construction lifter is usually used with tower crane on the construction site, the average load in 1-3 tons, running speed is 1 to 60 m/min. There are many kinds of elevators in construction, there are no two kinds of weights and weights in the way of operation, and they are controlled by manual control and automatic control. You can also add inverter and PLC control modules as needed, and also add floor calling devices to the peace layer.
Q:Should a fire extinguisher be equipped in the construction elevator?
The temporary building area shall be equipped with fire equipment according to the regulations. In general temporary facilities, each 100m2 is equipped with two 10L extinguisher. If the total area of a large temporary facility exceeds 1200m2, there shall be a special service for fire fighting, such as taiping pail, water bucket (pool), and huangsha ponds, etc. No items shall be piled up around the facilities. Between temporary carpenter's room, paint room, wood and machine tools, each 25m2 should be equipped with a suitable extinguisher. The oil depot and dangerous goods warehouse shall be equipped with sufficient quantity and type suitable extinguisher.
Q:How long does the construction elevator do a crash test
Construction lifter before put into use, must pass a drop test, using every three months should do a drop test, to adjust for safety device, braking distance will be falling not more than 1.2 m, after test and normal operation of every happening for action, must be to reset the attached safety device. The adjustment, repair, or identification of the anti-falling safety device shall be carried out by the manufacturer or designated authorized unit, which shall be operated by the professional at the time of the crash test. General can at the local special equipment inspection institutions detection, can also be tested in other qualified enterprises, such as: wuhan science, Shanghai special survey, qufu golden horse machinery testing!
Q:How is the construction elevator installed
This is normally installed by professional unit, oneself outfit not to be able, the security check check has a problem. And you don't install it yourself, you don't have a big safety accident. Installation process typically do first base, standard section is installed on the ground, hanging cage, outside guardrail, hanging basket to open up, the installation of the standard section of the upper portion, helped wall, fence and so on, the final debugging, acceptance, complete
Q:For example, what records do you want to have a third party monitoring?
Important parts replacement needs to be changed to the qualification, the procedure is like the new ladder, according to the new ladder standard test.
Q:The construction elevator should have those procedures
The construction elevator is short for construction. It is an important equipment in high-rise building construction, and construction site accident hazards easily, because it can cause many major accidents, injuries in the inspection should be listed as a key to check the content.
Q:Elevator installation approach, need to give the total package (inspect) what data, come a master to answer the detail point
In ten days: installation company qualification (including business license, qualification certificate, safety production license, organization code certificate and company performance, etc.), installation personnel qualifications (including the principal, special operations personnel, etc.), installation construction scheme (including the construction organization design, safety and civilized construction scheme, construction progress) The installation process: in materials to submit for approval (material inspection report, certificate, etc.), play equipment to submit for approval (mechanical factory qualified certificate, safe use license, etc.) After the construction is completed, the certificate of safety inspection (which needs to be provided by the special security agency)
Q:The maximum allowable deviation of the vertical is the vertical degree when the construction elevator is installed
5 kinds of circumstances. 1: the height of the elevator guide frame is less than 70 meters, and the vertical deviation should not be greater than one in 1000 of the height of the guide frame. (assuming the rail frame is 70 meters high, the deviation cannot be greater than 70mm) 2: the rail frame is greater than 70 meters and is less than 100 meters, and the deviation is less than or equal to 70 mm. 3: the guide frame is larger than 100 meters and is less than 150 meters. The deviation is less than or equal to 90 mm. 4: the guide frame is larger than 150 meters is less than or equal to 200 meters. The deviation is less than or equal to 110 mm. 5: the guide frame is greater than 200 meters, and the deviation is less than 130 mm. This is based on the requirement of 5.2.2.1 from GB10054 to 2005. (it used to be a direct copy.)
Q:What is the height of protecting door protection of construction elevator
Elevator protection door is strict according to the mandatory standard to set up elevator well protection measures for safety technology. The shaft must be set in the range of 1.5 to 1.8, with protective railings or fixed gate and protective railings or fixed doors. 2, elevator well in plus or minus zero layer need to set up the first safety net, every two layers, the upper part of most every 10 m AnQuanPing network design, network security quality must gb5725-1997 "safety net" of standard network, methods must be checked in accordance with the relevant provisions. Installation in the safety net elevator dismantlement, the operator should wear the seat belt according to the regulation. On the floor and roof, a short side hole is larger than 1.5 m, the hole should be set in the requirement of the protective railing, the bottom setting safety net. To set safety warning signs that meet national standards in the elevator shaft. Safety warning signs are clear, warning lights should be set at night. The protective railings and gates shall be marked with yellow and black stripes and shall be manufactured according to the standards of construction safety technical specifications. 5, elevator wellhead protection facilities need to dismantle or change temporarily, and by the project full-time safety sign shall be the responsibility of the project director, and ready to move or change the security countermeasures. To inform all staff at the same time; Recovery after safety facilities must be by the project director, full-time security personnel and other related personnel on-site inspection management, qualified rear can continue to use.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords