• Automatic Climbing Formwork for Construction Building and Others System 1
  • Automatic Climbing Formwork for Construction Building and Others System 2
  • Automatic Climbing Formwork for Construction Building and Others System 3
  • Automatic Climbing Formwork for Construction Building and Others System 4
  • Automatic Climbing Formwork for Construction Building and Others System 5
  • Automatic Climbing Formwork for Construction Building and Others System 6
Automatic Climbing Formwork for Construction Building and Others

Automatic Climbing Formwork for Construction Building and Others

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
100000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Automatic Climbing Formwork in Construction Building

     The Formwork Center of CNBM dedicates tothe design, manufacture and supply of formwork and scaffolding in fields ofCivil Engineering, Bridge-Road Projects,Tunnel andDams.

     TheFormwork Center of CNBM is managed by highly technical professionals having indepth knowledge, competence to design, develop and manufacture excellentquality products. 

The  workshop covers an area 8000M2, and in the plant there are automatic finger jointing machine, rack shaping and mortising machine, multi-blade saw, multi-spindle moulder, glue spreader and other advanced equipment. The production capacity of timer beams is 3000M/day.


Packing

in bulk or in bundle, or as requested

Shipping

   25-30 Days.

Normally small orders, it needs just 15-20 business days to the port. For goods with stock, it would be even shoter.

We can ensure the quality of the Timber Beam Wall Formwork and avoid extra expenses for customers.    

We can provide you the professional technical team.    

We can provide professional building proposal for your projects.


Automatic Climbing Formwork in Construction Building

CNBM Formwork Products Series

Formworksystem:

Timber-beamformwork:

1,TableFormwork:

2,Walland Column Formwork:

3,Auto-climbing Formwork:

4,Auto-climbing ProtectionPanel:

Steel-frameformwork:

Wall and Column Formwork:

Aluminum-frameformwork:

Slab Formwork

Wholealuminum formwork

Slab,Wall,Column and Beam Formwork

Wholesteel formwork

Wall,Column Formwork,and BrigdeFormwork

Scaffoldingsystem 

Steelprop & Beam clamp

Ring-lockscaffolding,Cup-Lock scaffolding,

Tower scaffolding


Automatic Climbing Formwork in Construction Building

Automatic Climbing Formwork in Construction Building

Automatic Climbing Formwork for Construction Building and Others

FAQ 

Why Us?

We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team.

Q:What is the building template support
In the construction for concrete cast-in-place construction formwork supporting structure, widely used in steel or timber beams assembled into the template bracket, built into the scaffold to form a bracket supported by steel or wood, and with steel formwork concrete construction.
Q:Technical specification for construction formwork safety JGJ162-2008 who has made me please
Template design and construction, from the actual situation of engineering, reasonable selection of materials, scheme and construction measures; should satisfy the template in the transport, installation and use of the strength, stability and stiffness requirements, and should give priority to the finalization, standardization and template template support components, reduce production and installation workload. To improve the reuse rate.The design, manufacture, installation and removal of the 1.0.4 construction formwork shall be in conformity with the requirements of this code, and shall comply with the relevant provisions of the state.
Q:1, JGJ162-2008 construction formwork safety technical specification;2, JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications; the friend has. Send me thanks
General principles for the implementation of 1.0.1 in the construction of formwork engineering in China to implement the principles and policies of safe production, to achieve advanced technology, economic and reasonable, easy to apply and to ensure safety in production, the development of this specification. 1.0.2 This specification is applicable to the design, manufacture, installation and dismantling of the cast-in-place concrete engineering formwork system in construction. 1.0.3 template design and construction, from the actual situation of engineering, reasonable selection of materials, scheme and construction measures; should satisfy the template in the transport, installation and use of the strength, stability and stiffness requirements, and should give priority to the finalization, standardization and template template support components, reduce production and installation work to improve the reuse rate. The design, manufacture, installation and removal of the 1.0.4 construction formwork shall be in conformity with the requirements of this code, and shall comply with the relevant provisions of the state.
Q:Since the building, and I would like to ask some of the basic knowledge to the construction of a unified drawing, plus or minus 0 and the height of the drawings, the roof slope requirements. Now the blue steel reinforced concrete inclined roof beams or do. Here we use multiple beams, and the waterproof, thermal insulation, in tile. Anyway, many shortcomings is wood, attic space basically scrapped, there is a fire started...I would also like to use concrete flat top, that is, do not let, more depressed.If I can use wooden beams, waterproof SBS, hanging plastic extruded board?The construction of plastic extruded board in inclined roof beams hung strong? Construction is not difficult?As well as the 8X11 meters of the roof, 30 degrees slope, sloping roof concrete cost about? I feel modeling and cloth reinforcement are very troublesome, expensive cost estimation
You can put the beam properly after the play flowers on top, which is the slope of the wall, so that you can
Q:What is the use of building wall formwork support? Thank you
Multicard support beams with multi support beams in visa, visa in early removing system to save 32% than ordinary plywood sold cuplok supporting system construction.
Q:86335 template support, what is the concept of those advantages
In the case of the construction industry, after 20 years of this industry, dedicated to technical analysis and improvement. After painstaking research, invited the domestic industry elite Magi to discuss, repeated demonstration, combined with the actual measurement through the practice of technical staff, spend long time hard work. Finally invented this new type of digital steel template support combination structure, so far spent ten years of painstaking research on the huge sums of money technology finally succeeded. To fill the gaps at home and abroad (with our understanding of the current international and domestic architectural template combination structure has not been any new structure), and won the national invention patent.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches