Asphalt Mixing Plant LB1500 with capacity 120t/h
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
LB1500 Asphalt Mixing Plant with capacity 120t/h
Item | Description | Remarks |
1 | Aggregate batching machine:4 units The bin capacity: 8M³ (flat hopper), total capacity 32M³;
| 1 set |
2 | The feeding belt conveyor | 1 set |
3 | Drying drum Dimension: Æ1900×7730 mm, the installation angel: 4°, the running speed 7.3rpm, rotation running through 4 units electric motor and cycloid reducer, the outer side wrapped with 50mm mineral wool thermal insulation layer with stainless steel. | 1 set |
4 | The burning system: Italy EBICO oil burner Fuel kinds :diesel& heavy oil, coal or gas; with a diesel tank (10t) and a heavy oil tank (10t). With China made Automatic burner ( as optional ) With China made coal burner ( as optional ) | 1 set |
5 | The inertial dust collector: Two-drum vertical cyclone dust collector | 1set |
6 | Bag dust collector ,The bag material:NOMEX America With water filter ( as optional ) | 1set |
7 | Hot aggregate elevator: adopts the double-chain elevating hopper, Hoisting capacity ≥130t/h | 1set |
8 | The vibration screen unit of the hot aggregate: four layers seven segments | 1 set |
9 | The hot aggregate bin:4 bin, 24 m3 totally | 1 set |
10 | The weighing system for the hot aggregate, filler and bitumen | 1 set |
11 | The mixer capacity: 1500 kg/batch; 30kw×2 | 1 set |
12 | The tower frame The main tower with supporting legs, repairing platform and guardrail | 1 set |
13 | The filler supplying system, capacity: 27m3; Capacity:20 tons/hour; Power elevator (as optional) | 1 set |
14 | The hot oil heating system and pipeline the hot oil heater capacity 60×104KCal/h (coal heater as optional) | 1 set |
15 | Asphalt tank and pipeline: 3 units of 25tons tanks (30 tons as optional) | 3 sets |
16 | Pneumatic control system | 1 set |
17 | The electric control system Siemens PLC control ,Main electric parts :Simens or Schneider brand Automatic and Manual control mode | 1 set |
18 | Control room: 5.19m×2.25 m× 2.50 m | 1 set |
19 | Finished asphalt storage silo ( 60tons, 120 tons ) as optional part | 1 set |
| Total power:385KW---469KW Total size: 34m*32m*19m(length*width*height) Price arange: (FOB Qingdao China) |
|
- Q: What raw materials and equipment do you need for your own admixture?
- The admixture of concrete mixing station using a lot of more phyletic, the effect is different also, early strength agent, retarder, water reducing agent, and release agent, antifreeze, etc., which is a kind of do not know you to call. The admixtures are usually made by professional manufacturers, and the ingredients are not the same.
- Q: The main components of a mixing station
- Feeding system: aggregate bucket, aggregate weighing hopper, flat belt machine, inclined belt conveyor. Mixing system: the main machine is a double-deckshaft mixer, reducer, cement weighing hopper, water and additive weighing hopper. Cement supply system: cement warehouse, screw conveyor, air compressor, screw electronic. Automatic water supply system: water tank, pump, pipe. Electrical operating system: computer console, electric control cabinet, operation room. Operation control system: microcomputer control or manual control.
- Q: What is the concrete of the mixing station?
- I am at the work station, the concrete mixing plant is operating goods, use the material such as cement, fly ash, sand, water reducing agent in strict accordance with the provisions of the state standard the ratio of mixing, through concrete truck mixer (commonly known as "car" river) transportation to the construction site, recycled concrete pump for handlebar concrete on the building site. For building products safety, now the big building construction are banned to mix concrete, concrete supply must to the recognition of concrete mixing station to buy, hope to help you.
- Q: How much water does a concrete mixer use every day?
- Water is an indispensable part of the concrete production industry. As an investment company in a concrete mixing station, it is also important to have control over water use. It is also an aspect of production cost control. The use of water used in concrete stations is not the main water link. Flush the blender and cement truck every day to use a lot of water. The concrete is very difficult to handle because of the condensation. So it is the most effluent project in the production standstill. And the washings of these rinsing equipment contain water slurry, aggregates and aggregates, etc. From the environmental point of view, the water of cement mortar or concrete is strong alkaline, the PH value is high, can reach about 12, free discharge can pollute the environment. Therefore, with the continuous improvement of the environmental requirements in recent years, the waste water treatment of the mixing station becomes the main concern.
- Q: How long does it take to build a concrete mixer station?
- The main idea is that the goods are completely incomplete, and the crane, the manpower, the mechanical tools. If everything is in place, then the pure installation will be two weeks to a month. Of course, also see you buy what type of product, container type is compared commonly faster, smaller and faster, under 3000 type slightly faster, 4000 and 5000 slowly
- Q: How much concrete is produced by the js1000 type of the concrete mixing station
- According to the national standard, 1 cubic host is the JS1000, the general theoretical productivity of the standard test concrete is not less than 50 cubic meters per hour. But the actual situation is fully automatic, normally can be above 40 cubic meters. The cement productivity would be low by hand.
- Q: What is the special work of the concrete mixing station
- The ratio of the concrete particles to the surface area, the shape of particles, the density of the particles and the grading of the particles, etc., are very important to the liquidity of the slurry. Smaller than surface area, the particle shape is closer to the ball, bigger, more filling and more liquid. By optimizing these factors, you can obtain the most appropriate liquidity. In order to design the concrete mix according to the engineering requirement, the characteristics of the aggregate material must be mastered first. The properties of aggregates are determined by factors such as microstructure, prior exposure and processing, and these factors influence the properties of fresh and hardened concrete. The effect of aggregate properties on concrete performance should be considered, and the quality of concrete mixing equipment should be considered. Before installation, check the appearance quality of the equipment again, the platform bolts are not loose, the welding seam is not cracked, the oil leak, the water, the ash (the lump), etc. Clean the assembly of the whole machine and re-spray paint, rust and renovate. Prepare the all kinds of bolts, welding wire, iron plate, etc., to prepare tools and protective equipment, the use of more tools for several sets of parts can use pneumatic wrench, and provide timely acetylene cutting, electric welding equipment; Plan the entry time of the crane.
- Q: The average commodity concrete is mixed with a day to use how much fly ash
- That depends on how many square measures you do in a day, and you typically do 1,000 concrete words 80 to 90 t
- Q: What is the difference between a concrete mixer and a concrete mixer
- The bone material of the mixing tower is on the top, and the aggregate is measured directly into the mixer. The concrete bin of the commercial concrete station is below, and the bone material is measured and then transported into the mixer after being transported by the inclined belt (which also has some use of the elevator). In a popular way, it is called the building, which is called the second ascent. The steel structure will be larger and the diagonal belt will be relatively longer because of the bone material in the mixing building. But in productivity, the churn is about a fifth higher than the commercial concrete station. In operation, because the inclined belt of the commercial concrete station starts frequently, the energy consumption and the failure rate will increase, and the energy consumption of the mixing building is lower than the failure rate. In the end, because the production capacity of the concrete station is small, the structure is easily disassembled and can be made into a container transfer site, which is suitable for the construction site. The mixing tower is large and high in productivity, and can only be used as a fixed mixer, suitable for the supply of large water projects or large quantities of goods. So customers in the difference between commercial concrete, concrete stand and commodity concrete mixing floor, from aggregate (material), the production efficiency and so on, to choose and buy the right equipment.
- Q: The mixing time of the concrete mixer is in which standard
- Sales missed you do this to see how. If you have any project is continuous uninterrupted production, 24 hours a day, 365 days. As long as there is live, not to stop, of course, is to rest. Want to shift work
Send your message to us
Asphalt Mixing Plant LB1500 with capacity 120t/h
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords