• Asphalt Mixing Plant LB1500 with capacity 120t/h System 1
Asphalt Mixing Plant LB1500 with capacity 120t/h

Asphalt Mixing Plant LB1500 with capacity 120t/h

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing



LB1500 Asphalt Mixing Plant with capacity 120t/h

Item

Description

Remarks

1

Aggregate batching machine:4 units

The bin capacity: 8M³ (flat hopper), total capacity 32M³;

1 set

2

The feeding belt conveyor

1 set

3

Drying drum

Dimension: Æ1900×7730 mm, the installation angel: 4°, the running speed 7.3rpm, rotation running through 4 units electric motor and cycloid reducer, the outer side wrapped with 50mm mineral wool thermal insulation layer with stainless steel.

1 set

4

The burning system: Italy EBICO oil burner

Fuel kinds :diesel& heavy oil, coal or gas;

with a diesel tank (10t) and a heavy oil tank (10t).

With China made Automatic burner ( as optional )

With China made coal burner ( as optional )

1 set

5

The inertial dust collector: Two-drum vertical cyclone dust collector

1set

6

Bag dust collector ,The bag material:NOMEX America

With water filter ( as optional )

1set

7

Hot aggregate elevator: adopts the double-chain elevating hopper, Hoisting capacity ≥130t/h

1set

8

The vibration screen unit of the hot aggregate: four layers seven segments

1 set

9

The hot aggregate bin:4 bin, 24 m3 totally

1 set

10

The weighing system for the hot aggregate, filler and bitumen

1 set

11

The mixer capacity: 1500 kg/batch; 30kw×2

1 set

12

The tower frame

The main tower with supporting legs, repairing platform and guardrail

1 set

13

The filler supplying system, capacity: 27m3;

Capacity:20 tons/hour;

Power elevator (as optional)

1 set

14

The hot oil heating system and pipeline

the hot oil heater capacity 60×104KCal/h (coal heater as optional)

1 set

15

Asphalt tank and pipeline: 3 units of 25tons tanks (30 tons as optional)

3 sets

16

Pneumatic control system

1 set

17

The electric control system

Siemens PLC control ,Main electric parts :Simens or Schneider brand

Automatic and Manual control mode

1 set

18

Control room: 5.19m×2.25 m× 2.50 m

1 set

19

Finished asphalt storage silo ( 60tons, 120 tons ) as optional part

1 set

Total power:385KW---469KW

Total size: 34m*32m*19m(length*width*height)

Price arange: (FOB Qingdao China)


Q: The main components of a mixing station
The conveying system of materials is made up of three parts. Aggregate conveying; There are two ways of conveyance and belt conveyance. The advantage of hopper promotion is that the area is small and the structure is simple. The advantage of belt transport is that the transport is large, efficient and low. The belt conveyor mainly applies to the mixing stations that have aggregate storage, thereby increasing the productivity of the mixing stations. Powder conveying; The powder used in concrete is mainly cement, fly ash and mineral powder. The most commonly used powder conveyors are conveyors of screw conveyors, and the large mixing buildings are carried by pneumatic conveyer and scraper. The advantages of screw transport are simple structure, low cost and reliable use. Liquid transport mainly refers to water and liquid admixtures, which are delivered separately by water pumps
Q: What is the concrete of the mixing station?
Concrete mixing stations are made of concrete, which is made of concrete for various construction sites, including commercial housing, concrete floor, industrial workshop and so on.
Q: What type of concrete mixer is needed for each hour of concrete 90 cubic meters?
Many manufacturers will say that the HZS90 station is the one that makes 90 square concrete. In fact, the HZS90 station is supposed to produce 90 square concrete when it is in theory, and it is actually not up to 75 square
Q: How much concrete is produced per hour by HZS180 concrete mixer?
One, 180 square of concrete per hour, 180 of HZS180 is its output per hour. The concept of concrete mixing stations: Concrete mixing station is mainly composed of mixing console, materials weighing system, material conveying system, material storage system and control system of large system and other ancillary facilities. Because building aggregate measurement compared with standing aggregate metering, reduced the four of the intermediate links, and the vertical blanking metering, saved measuring time, thus greatly improving the production efficiency, under the condition of the same model, mixing building production efficiency than mixing plant production efficiency by a third. Such as: HLS90 floor of production efficiency and production efficiency of HZS120 stand HLS120 floor of the production efficiency, production efficiency is equivalent to HZS180 stand HLS180 floor of the production efficiency is equivalent to the productivity of HZS240 station.
Q: What are the ingredients for the concrete mixing stations?
It is the raw materials for the concrete mixers, the sand, stone, cement, fly ash, mineral powder, various admixtures, water, basically these seven raw materials.
Q: What are the facilities of the concrete mixing station
One. Stir the host The mixing machine is divided into strong mixing and self-falling stirring. The powerful mixer is the mainstream in the domestic and foreign mixers, it can stir the liquid, semi-dry hard and hard and so on. The main mixing liquid concrete of the self-falling mixer is very rarely used in the mixing station. Two. Material transport system The material transport consists of three parts. Aggregate conveying; There are two ways of conveyance and belt conveyance. The advantage of hopper promotion is that the area is small and the structure is simple. The advantage of belt transport is that the transport is large, efficient and low. The belt conveyor mainly applies to the mixing stations that have aggregate storage, thereby increasing the productivity of the mixing stations. Powder conveying; The powder used in concrete is mainly cement, fly ash and mineral powder. The most commonly used powder conveyors are conveyors of screw conveyors, and the large mixing buildings are carried by pneumatic conveyer and scraper. The advantages of screw transport are simple structure, low cost and reliable use. Liquid transport mainly refers to water and liquid admixtures, which are delivered separately by water pumps.
Q: The average commodity concrete is mixed with a day to use how much fly ash
That depends on how many square measures you do in a day, and you typically do 1,000 concrete words 80 to 90 t
Q: What is the difference between a concrete mixer and a concrete mixer
The simple point is: the bones of the mixing tower are on top, and the bone is measured directly into the blender. The bone material of the stirring station is below, and the bone material is measured and then transported into the blender after the slanting belt. In a popular way, it is called the building, which is called the second ascent. Higher initial investment mixing floor production line 400000 station, because of mixing building bin above, therefore the steel structure will be bigger, inclined belt will be relatively longer. But in productivity, the churn is about 20 per cent more productive. In the operation, the energy consumption and the failure rate will increase due to the frequent start of the inclined belt of the mixing station, while the mixing building will be relatively low. Of course, in appearance, the mixing building is a bit more imposing than a mixer-stand, which can sometimes have an unexpected effect on the business. In addition, there are some technology mixing buildings that can be used, and the mixing stations can't be used, because the equipment is different. It's worth noting that the difference between the initial and the mixing stations is not absolute.
Q: Which staff does the concrete mixing station need?
Move the cement iron pipe, driver! technology, webmaster, laboratory (deputy) director of the general, production manager, sales managers, salespeople, scheduling, lab team leader, the operator (inspection), quality inspection, proportioning design, the material inspector technicians,
Q: Does the concrete mixing station name have the name of the businessman concrete
Yes, the general commodity concrete mixing station will write like this, the benefit of writing is simple and convenient, because the concrete three words are really too complicated! Zhengzhou zhengchen industrial production commodity concrete mixing station equipment.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords