Asphalt Mixing Plant 360-400 tph
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: Shaanxi, ?xml:namespace>
Brand Name: XRMC
Model Number: J5000
asphalt mixing plant: construction machinery
Packaging & Delivery
Packaging Details: | suitable for sea voyage |
Delivery Detail: | 40 days after concract singing |
Specifications
XRMC independently developed the international advanced product, J5000 Asphalt Mixing Plants.
OVERVIEW:
Based on introducing the mature technologies from BENNINGHOVEN company of Germany, XRMC independently developed the international advanced product, J5000 Container type Asphalt Mixing Plants, and owns its intellectual property rights. The container-like or modular structure and nooundation design make it have many advantages including the fast and safe transportation, the compact structure and the reduced floor-space etc. The advanced automatic control and supervisory systems also ensures its accuracy and reliability
- Q: 120KW piling machine needs a lot of air?
- 250A will be enough, but quality is good.
- Q: Which wipe machine is better?
- We all learned it thereIt seems that the price has increased by at least more than 3500. After paying the money, you don't have to pay any more
- Q: The grounding of piling machine. Pile machine, three-phase asynchronous motor one day to play 2 piles piling machine and control box are constantly moving, how to ground? And is not a machine box. A gate or a few feet to ground is the five core. In three, the rest of the root, the zero line and the PE are useless? Thank you, predecessors, great God under the guidance of? In this way, the master said that the reception will be over, installed a leak protection, is not installed, the leak insurance does not need to ground ah?
- Pile piling the opportunity to continue to move above the motor power is less, sometimes with a welding machine, control box in pile machine, according to the requirements of JGJ46-2005, must be "one machine and one gate of a protection"!
- Q: What are the characteristics of hydraulic static piling compared with traditional pile driver?
- The pile is pressed by its own weight. Besides the weight of the pile, the weight of the pile should be installed with a total weight of more than 600 tons to the thousand tons.There is a large power hydraulic pump station with maximum power of more than 300 kW at run time.The pressure prefabricated pipe pile is clamped by hydraulic cylinder and pressed down by segment. The noise and vibration are smaller, and the bearing capacity can be known.Pile with hook.
- Q: Paver, roller operation certificate issued by any functional departments, there are no relevant legal documents?
- Practitioners must be required to hold (IC card) posts, that is, by the State Administration of work safety issued the "People's Republic of China special operations permit" before the job, this certificate nationwide. The old version of the certificate is reviewed every 2 years, and the review of the new special operation permit is reviewed 1 times every 3 years.The examination shall be conducted by the labor department or the construction department, and the safety supervision department shall issue the certificate.
- Q: Excavators, rollers, flat machines, dump trucks, loaders, wearing parts what? The more detailed the answer, the better
- The most vulnerable parts of the chassis are the ground wheel, the chain, the guide wheel, and the axle wheel,
- Q: slow pressing, high frequency and low amplitude". How do you understand the low amplitude behind it? Thank you
- The base layer must be compacted at low frequency and high amplitude.
- Q: Three-phase electric rammer or two-phase power
- Still use three-phase electricity, turn the distance is big, power is sufficient.Three phase motor and single-phase motor principle is basically the same, are electromagnetic principles of application.
- Q: When the asphalt concrete pavement is pressed at the beginning of the paver, what hydrostatic pressure should be adopted 1-2 times?
- For the initial pressure of common bituminous concrete pavement, a double steel roller should be used. For modified asphalt concrete (SBS) initial pressure, heavy duty roller can be used as well. Asphalt pavement compaction program: initial pressure, re pressure, final pressure.The ordinary asphalt pavement early pressure method: using light steel cylinder roller 8 ~ 10T or close vibration vibration device of roller compacted for two times, the pressure should not be less than 350N/cm, the initial pressure after inspectors, measuring working check flatness. Test work, check the flatness of crown, if necessary, be adjusted appropriately. Initial pressure in the mixture after paving high temperature, generally not less than 110-120 degrees, the rolling speed of 1.5-2.0km/h, and may not produce passage, cracking.
- Q: Is there an operation certificate for percussive drill driver?
- at the top of the main frame is fixedly connected with the pulley first, the lower part is provided with a steering pulley, the pulley head and a steering pulley connected by wire rope transmission; one end of the wire rope is fixedly connected with the hammer, the other end is connected to a winch Part; the manipulation of PLC electric control box, automatic operation mechanism began to work, you can control the opening and closing part of piling winch clutch, the automatic impact drill piling machine has the advantages of simple structure, low cost, convenient operation, reliable performance.
Send your message to us
Asphalt Mixing Plant 360-400 tph
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords