66kg Petrol Tamping Rammer with HONDA GX100
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 20 Units pc
- Supply Capability:
- 200 Units per Month pc/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Detailed Product Description
1. Petrol Tamping Rammer
2. Two Stage Air Cleaner
3. Germany polyurethane bellow
4. Operation Weight 66kg
5. CE Certificate
Model | CT-66P-2A |
Engine Type | Honda GX100,Petrol |
Power kw (hp) | 2.0(3.0) |
Weight kg (lb) | 66(145) |
Impact Force kN | 12.7 |
Jumping Stroke mm(in) | 50-75(2-2.95) |
Fuel Tank L | 2.0 |
Shoe size mm(in) | 300×280 (12×11) |
- Q:Vertical rammer oil spill happened
- softening agent, the hard problem of corrosion, first oil leakage, slowly dripping phenomenon, a long time sealing ring fracture
- Q:Ramming machine excavator and compacted soil which good?
- When the excavator can tamper with, because of a large amount of backfill construction, ramming machine is too slow, the excavator bucket inside will be filled with soil, and then down the row, when ramming machine, as for the effect, general.
- Q:Near the ramming machine that have sold near me
- There is no alternative, just as the flowers are no longer the flowers of that timeFull of deep unwillingness and weakness
- Q:What should be noted in the operation ramming machine construction?
- (1) check the insulation circuit, electric leakage protector, directional switch, belt and eccentric block before the use of the tamper, and confirm that no problem can be used.(2) when the tamping machine is operated, two people should operate: one man lifting machine, one person arranging the line to prevent the tamping head from ramming the power cord.(3) when tamping machines turn the corner, they should not turn or throw them freely, or let them walk freely.
- Q:Three-phase electric rammer or two-phase power
- But the three-phase motor's magnetic field is round, can start from itself, the single-phase motor's magnetic field is the pulsating magnetic field, needs to increase the capacitance or the resistance, and starts the coil, causes it to form the ellipse magnetic field, can start.
- Q:Should the foundation be compacted by tamping machine?
- Yes, but should meet the design requirements of compaction requirements
- Q:What are some of the electric ramming machine accessories?
- The main parts of lifting machine, electric basket safety lock, suspension platform, suspension structure, distribution box, steel wire rope, the other consists of Rieter electric basket accessories such as; motor end cover, AC contactor, transformer, switch, fuse, insurance, oil seal frame, leakage circuit breakers, plug, signal lamp,
- Q:How to connect the power line ramming machine
- Ramming machine power line connected? If the answer is incomplete here! If you want to know more, you can go to "power business" or "China Power Grid" and other industry portal authoritative website!
- Q:Do not pull a gasoline rammer
- I hope you can describe and supplement your questions as soon as possible so that everyone can help you. Thank you.
- Q:What materials need to tamper
- This process is called ramming compaction foundation. Before ramming with stones, with four people carrying a ram. Now there is a rammer, more simple.
We focus on development, design, manufacture, sales, after-sales service and so on, to supply premium products to our customers. We would like to supply competitive cost and premium quality products to our customers. So, if you have any question or requirement, please feel free to contact us at anytime. We will reply you at first time.
.
1. Manufacturer Overview |
|
---|---|
Location | Beijing, China |
Year Established | 2001 |
Annual Output Value | |
Main Markets | South America Eastern Europe Southeast Asia Mid East Western Europe Southern Europe South Asia |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | 81% - 90% |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | 5,000-10,000 square meters |
No. of Production Lines | |
Contract Manufacturing | OEM Service Offered |
Product Price Range |
Send your message to us
66kg Petrol Tamping Rammer with HONDA GX100
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 20 Units pc
- Supply Capability:
- 200 Units per Month pc/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
New products
Hot products
Related keywords