Scaffolding Aluminium Frame Construction
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Grade: | Temper: | |||
Application: | Shape: | Alloy Or Not: | |||
Model Number: | Brand Name: | Scaffolding Aluminium Frame: | |||
Certification: | Thickness: | Length: | |||
Surface: | Anodized Film: | Anodizing: | |||
Powder Coating: | Deep Processing: |
Packaging & Delivery
Packaging Detail: | Scaffolding Aluminium Frame # Buddle in Plastic Film or Paper # As Customer Requirement |
Delivery Detail: | 15-25 Days |
Specifications
Scaffolding Aluminium Frame
1.6063,6061,etc.
2.T5,T6
3.Mill Finish, Anodized, Powder Coating
4.RAL
# Basic Information for Scaffolding Aluminium Frame
We have hundreds of thousands of existed dies in different sizes for the basic shapes of Aluminum Profiles.
For the size chart, please contact us. Custom sizes for Aluminum Profile are our specialty.
Description | Alloy No. | 6063,6061,1060,6082,3003,etc. | ||
Temper | T5,T6,T4,F0,etc. | |||
Thickness | ≤1.0mm | 1.0-2.0mm | ≥2.0mm | |
Surface Treatment | ||||
Mill Finish | Anodized | Powder Coating | Electrophoresis | |
Natural | Silver,Bronze,Black, Golden,Champagne | Bronze,White,Grey, Green (Pattern and RAL Series) | Silver,Bronze,Black, Golden,Champagne | |
MOQ | 500 KG | |||
Lead Time | Die Making | 7 Days | ||
Mass Producing | 10 Days | |||
Payment | T/T,L/C | |||
Deep Processing | Preciously Cutting,Milling,Drilling,Punching,CNC,etc. |
- Q: Is it better to use an aluminum bracket or a wooden stand?
- Scaffolding demolition and step and so on, I do not know how you take, I give you a calculation tool bar
- Q: The gearbox is good or the iron is good 490
- Not necessarily, according to the construction site conditions, construction methods to set
- Q: High-rise (30m and above aerial work) Building outside the scaffolding whether to conduct expert demonstration ??
- To bring the purpose of fuel-efficient, faster response is also better! Cooling performance is stronger than cast iron, the other is in the disassembly of the engine, the engine cylinder pad does not need to be positive and negative!
- Q: Clothes rack stainless steel is good or good aluminum
- The distance between the test tube is 10 meters
- Q: Housing maintenance works wall maintenance, the use of mobile scaffolding, I would like to ask how this scaffolding generally calculate the cost? Thank you I'm doing the project budget
- Generally divided into single row scaffolding, double scaffolding and full house scaffolding
- Q: Development Trend of Aluminum Alloy Cabinet Industry in Small and Medium - sized Cities
- Insulation materials include: extruded polystyrene foam (extruded board), molded polystyrene foam (ordinary foam board), is sprayed foam polyurethane, foam polyurethane insulation board (products), foam glass, foam Concrete (foam mortar), chemical foam cement board, light aggregate insulation concrete (ceramsite concrete, etc
- Q: What is better for mosquito nets? (Plastic? Aluminum alloy or other)
- Mainly used for purification plant ceiling, enclosure, building plus layer, temporary office, warehouse and so on
- Q: Two-wheel skateboard and aluminum alloy bracket which is a good point? Why are the same price is different
- So as long as there is no weight to press it or have a hard hit it, it is not frivolous
- Q: What are the best companies (including imported products) in China?
- In the United States took out may be killed ~ ~ ~ ~ ~
- Q: Why all the ultra-pole all use aluminum alloy shell?
- With foam plate fixed in the greenhouse on the wall from the role of insulation, with mortar paste the paste directly on the wall, probably need 7 ~ ~ 8 bags.
Send your message to us
Scaffolding Aluminium Frame Construction
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches