Aluminum Profile Products
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 Kilograms pc
- Supply Capability:
- 150000 Tons per Year pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Features:
1)Material : 6063 6061 6060 and different aluminium alloy
2)Status:T4 T5 T6 or other special status
3)Surface treatment: mill finish, anodized sliver ,anodized bronze, anodized champagne, anodized black pearl, various power coating color, electrostatic sliver, electrostatic champagne, electrostatic golden, electrostatic titanium , machine polish sliver, machine polish bronze, wooden grain color, and Fluorocarbon spraying.
4)Annual capacity : 120000TON
5)Quality : China Nation Standard GB/T 5237 – 2004 (advanced class)
6)Use: can be widely using aluminium window, door, curtain wall, hand railing , normal aluminium profile, decorative and industrial aluminium profile
7)Advantage: Famous Brand reasonable&market price, soonest delivery and good after sale- service
8)Type of package:protection foam+heat contracted plastic film. / wooden packing / Metal pallet or depand on client’special requirement.
9)Payment term:
T/T:30% of total value as deposite should paid by T/T within 3 days when confirmation ,and the remaining sum should be paid by T/T before delivery.
L/C: 100% at sight
10)Delivery Day: 15-30days
- Q:The difference between lighting transformers and control transformers
- The lighting voltage is 36 and 12V, the signal lamp is 6V, the control winding is 127, 110V, the one or two insulation, and the two one is grounded.Simple lighting transformers, the two voltage is not so diverse.
- Q:3 24V100W lights, I need to use a large capacity transformer (220V change 24V)?
- The bulb is used in the two luminescence tube combined type lamp holder, the calculation process is very complex. Different combinations, the secondary voltage is different. Because it is a DC ignition, but also consider the efficiency of rectification, but the total power is constant.
- Q:Please tell me how to calculate the transformer in the lighting circuit of elevator shaft in building electrical design
- Pe=19.5KW, installed capacityKx=1 coefficient of demandPjs=KxPe=19.5KW, calculated loadCOS, phi, =0.85, power factorIjs=KxPe/3/220/cos phi (Ijs calculates current, voltage, 380V/220V, three-phase)=1*19.5*1000/3/220/0.85=34.76A
- Q:Is the substation separate from the power and illumination transformer?
- There is only bus in the substation, and the station is connected with the transformer from the bus. If there is no electricity even in the bus, then the substation should not be considered active.
- Q:Lighting, lights, transformers, bulb brightness is too low, what's the matter?
- Generally, the power of the transformer is the apparent power, and the light bulb is the active power, and the power matching is taken into account.
- Q:What transformer can be used in a safety voltage lighting transformer?
- 220V/36V or 24V isolation transformer. Double winding, high and low voltage coils, not connected.
- Q:Power and lighting transformers, lighting quality will be affected much?
- Corresponding to the transformer power supply, in order to save costs and reduce costs, the choice of AC ignition method is better. Pure resistive load, the power factor is 1. The 3 *100W=300W is the capacity of the required transformer
- Q:Why can't autotransformer be used as transformer for safety lighting?
- The main and auxiliary coils of the autotransformer have common parts. Once the short-circuit is made, the lighting circuit is directly connected with the high voltage circuit, which is very dangerous
- Q:Does the lighting work properly? Doesn't that power equipment start voltage unstable?
- It is not easy to control, the power and lighting and electricity; if the transformer capacity is small, and relatively large power equipment start frequently, voltage stability will be poor, the lamp brightness will fluctuate dramatically, have effect on visual acuity. But as long as the design is reasonable, it has little effect.
- Q:How many can you bring with 220V? How many can you bring with 380V? There are 3 terminals on the transformer. There are 220V, 380V, 0, three terminals. 220V is the 220V terminal and the 0 connection. How can the 380V be connected? Is it 380V and 0 or 380V and 220V?
- Connect 220V method, FireWire 220V terminal, zero line 0 terminal, 380V terminal is not connected.Connect 380V method, A phase 380V terminal, B phase 0 terminal, 220V terminal is not connected.
1. Manufacturer Overview |
|
---|---|
Location | Guangdong,China (Mainland) |
Year Established | 2001 |
Annual Output Value | Above US$100 Million |
Main Markets | South America 0.59% Eastern Europe 0.38% Southeast Asia 0.50% Africa 3.30% Oceania 0.07% Mid East 0.50% Eastern Asia 0.62% Western Europe 0.50% Southern Europe 0.27% South Asia 0.75% Domestic Market 92.52% |
Company Certifications | Guangdong Well-known Brand; Guangdong Famous Trademark Certificate; Tax Payment exxceed 10 million RMB/y; ISO9001:2008 |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Guangzhou |
Export Percentage | 31% - 40% |
No.of Employees in Trade Department | 11-20 People |
Language Spoken: | |
b)Factory Information | |
Factory Size: | Above 100,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | OEM Service Offered Design Service Offered |
Product Price Range | High and/or Average |
Send your message to us
Aluminum Profile Products
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 Kilograms pc
- Supply Capability:
- 150000 Tons per Year pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords