• Aluminum Foil Duct Tape Used in HVAC System System 1
  • Aluminum Foil Duct Tape Used in HVAC System System 2
  • Aluminum Foil Duct Tape Used in HVAC System System 3
Aluminum Foil Duct Tape Used in HVAC System

Aluminum Foil Duct Tape Used in HVAC System

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
2000 roll
Supply Capability:
100000 roll/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Aluminum Foil Tape

 

Description of Aluminum Foil Tape

 

Aluminum Foil Tape is made of aluminum foil as backing material which single coated with acrylic adhesive of excellent tackiness and adhesive layer is covered with a protective silicon paper as release liner. Aluminum Foil Tape has excellent resistance against chemical corrosions due to the protection of a thin layer of aluminum oxide which coated on the surface of aluminum foil carrier.

 

Features of Aluminum Foil Tape

 

Aluminum foil tape for difficult to adhere to surfaces such as low surface energy substrates, Resists flame, resists moisture, resists weather, resists UV degradation, chemical resistant tape, thermally conductive tape for heating and cooling efficiency, Automotive, Aerospace, HVAC, Appliance, Metal Finishing, Electronics, Recreational Vehicle, Construction, General Industrial sealing, seaming, shielding, chemical stripping, harness wrapping, joining, vibration damping, , plastic protection, heat shielding, heat reflecting, paint stripping.

 

Image of Aluminum Foil Tape

 

Aluminum Foil Duct Tape Used in HVAC System

Aluminum Foil Duct Tape Used in HVAC System

 

Specification of Aluminum Foil Tape

Material:

Aluminum Foil

Adhesive:

Acrylic

Adhesive Side:

Single Sided

Place of Origin:

China (Mainland)

Temp. Resistance

-20-+120°C

Peel strength

≥10N/25mm

Initial adhesion

≤250px/Φ11mm steel-ball

Width:

25-1000mm

Length:

As customer's require 10/20/30/50m etc

Thickness:

20u-100u

Color:

Silver

Print:

No printing

Main Markets:

North-America/Eastern Europe/Southeast Asia/Mid East/Eastern Asia/Western Europe/South America/Africa

 

FAQ

 

We have organized several common questions for our clientsmay help you sincerely

Where to use the tape

The aluminum foil tape is widely used in HVAC system. They are easy to take and install. Their aluminum face can reflect 97% of the outside sunlight to keep the duct insulation well. Also the aluminum foil tape can be used in home application production and daily life etc.

How to guarantee the quality of the products

We have established the international advanced quality management systemevery link from raw material to final product we have strict quality test; We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

 

How long can we receive the product after purchase?

In the purchase of product within 10 working days, we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 20 to 25 working days can be served.

 

What is the storage condition?

The welded wire mesh should be stored at room temperature and kept from wet and heat source.

 

 

Q: Such as the problem, and now air-conditioning technology is mature, the market a lot of air conditioning are cold and warm, and I would like to be able to put my home that the end of the century loaded Mitsubishi air conditioning (split single cold) into a cold Before the conversion of ordinary TV to the remote control, that air conditioning can be modified? How much does it cost? Where is this technology? More
Air conditioning heating than the cooling power consumption, power consumption and ambient temperature and set the temperature has a great relationship, the general cooling 1 hour 1-2 degrees, heating if the auxiliary heating about 2-3 degrees. If you want to save the appropriate temperature can be set higher, the general and the ambient temperature difference of about 5 degrees people feel more comfortable, shut off undesirable, not reach the purpose of saving.
Q: Air conditioning ventilation when the sound is a big reason
According to my specific circumstances, in the following seven major hazards include the division, sub-project focus on control
Q: US direct mail dysonhp01 Dyson air purification cooling machine triple in the country to warranty it
Among them, the extruded polystyrene gypsum composite board is based on paper gypsum substrate, the use of adhesive and extruded polystyrene board through the factory processing compound
Q: Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
Can be small, according to your roof to do what material.
Q: Air conditioning machine work when the sound is too much reason
Color steel plate, refers to the color coated steel plate, color coated steel plate is a kind of organic coating with steel plate
Q: What is the whole heat exchange fresh air ventilator?
Depends on the main control panel is not cold and warm, single cold common motherboard. Only a generic motherboard can be changed. In the single cold air-conditioning on the outdoor machine to install the appropriate specifications of the four-way valve, adjust the amount of refrigerant to the appropriate level can be.
Q: External wall insulation method of operation There are several combinations of materials
Seeking the existing building construction specifications Daquan! The The @
Q: Ventilation is very good, why still have to install fresh air system
You are a single raft toilet wipes Pie Tanzhuang open card would like to confirm what? Contract notarization or. The The If it is contract notarized, generally notary value of 0.25% -0.3%
Q: In the design, the building structure and the hydropower are generally designed by the Architectural Design Institute. The air conditioning ventilation is based on the design of the room. Or first air conditioning ventilation? More
Decoration refers to the home improvement part, housing construction is the content of the building
Q: HVAC Heating: What are the main components of the air distribution system?
(HS Code) Yes, the tax rebate is 13% (April . 2009 latest data). Floor of the board of the tax number is, the tax rebate is 9% (June . 2009 the latest data), floor board is the inspection of goods, exports need to be checked. There is nothing to understand where to add me MSN:

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords