• Aluminum Foil Tape for HVAC Insulation USE System 1
  • Aluminum Foil Tape for HVAC Insulation USE System 2
  • Aluminum Foil Tape for HVAC Insulation USE System 3
Aluminum Foil Tape for HVAC Insulation USE

Aluminum Foil Tape for HVAC Insulation USE

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
500 roll
Supply Capability:
30000 roll/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Aluminum Foil Tape for HVAC Insulation

 

Description 

Aluminum Foil Tape is made of aluminum foil as backing material which single coated with acrylic adhesive of excellent tackiness and adhesive layer is covered with a protective silicon paper as release liner. Aluminum Foil Tape has excellent resistance against chemical corrosions due to the protection of a thin layer of aluminum oxide which coated on the surface of aluminum foil carrier.

 

Aluminum Foil Tape for HVAC Insulation Features

 

Aluminum foil surface is well prepared for efficient wetting, bonding and adhesion durability

Excellent flame resistance, outdoor weathering as well as good ultra-violet light (UV) resistance

Good thermal conduction and light reflection due to silvery chemical elements in aluminum foil

Water-proof carrier has excellent ability as protective equipment against vapor, dust and rusting

 

Aluminum Foil Tape for HVAC Insulation Photo

 

Aluminum Foil Tape for HVAC Insulation USE

Aluminum Foil Tape for HVAC Insulation USE

Aluminum Foil Tape for HVAC Insulation USE

Specification of Aluminum Foil Tape

 

CODE

product structure

Aluminum Thickness

glue

Total thickness

T-1801SP

18m

 38um

 56um

T-2601SP

26um

 38um

 64um

T-3001SP

30um

 38um

 68um

T-4001SP

40um

 38um

 78um

T-5001SP

50um

 38um

 88um

 

Aluminum Foil Tape for HVAC Insulation FAQ

 

We have organized several common questions for our clientsmay help you sincerely

How to guarantee the quality of the products

We have established the international advanced quality management systemevery link from raw material to final product we have strict quality test; We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

 

How long can we receive the product after purchase?

In the purchase of product within 10 working days, we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 20 to 25 working days can be served.

 

What is the storage condition?

The welded wire mesh should be stored at room temperature and kept from wet and heat source.

 

Q: If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
Common scaffold brace is the U-type care, "construction of fasteners steel scaffolding safety technical regulations" (JGJ Gong Gong Duo Ji-tao pan Revenge two 130-2011) provides "adjustable support bearing capacity design value is not Should be less than 40kN, the support plate thickness should not be less than 5mm ", the general calculation using 30kN.
Q: US direct mail dysonhp01 Dyson air purification cooling machine triple in the country to warranty it
Among them, the extruded polystyrene gypsum composite board is based on paper gypsum substrate, the use of adhesive and extruded polystyrene board through the factory processing compound
Q: Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
Not the ,,, mobile air conditioning inside the compressor, the winter heating also need the compressor, but also a ventilation pipe, charged heating Well?
Q: Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
Of course, is heating electricity. Heating has auxiliary electric heating, so electricity and electricity. Frequently open the fee, the air compressor is not good. 2 machine cooling power is 1700 watts, 1 hour is 1.7 degrees electricity. Heating with auxiliary electric heating power of 1500 watts, 1 hour is 3.2 degrees electricity.
Q: I added the space 18 degrees opened for 5 hours or not cold, we all know how is it? More
The general level of more than 12 layers when you need to use.
Q: Air conditioning machine work when the sound is too much reason
This is based on the density of benzene board decision, not what you said, know it buddy.
Q: What is the whole heat exchange fresh air ventilator?
Second, the new insulation decorative board is integrated through the production line, set insulation, waterproof, finishes and other functions in one, is to meet the current housing construction energy needs, improve the industrial and civil building exterior wall insulation level of the preferred material, but also on the existing Building energy-saving transformation of the preferred materials
Q: The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
The basic operation of the same, but the different requirements of different professional, or to determine the direction of good, and then hands.
Q: Ventilation is very good, why still have to install fresh air system
You are a single raft toilet wipes Pie Tanzhuang open card would like to confirm what? Contract notarization or. The The If it is contract notarized, generally notary value of 0.25% -0.3%
Q: HVAC Heating: What are the main components of the air distribution system?
Geothermal construction, the heating pipe spacing can not be less than 100mm, the construction can not be achieved, big brother!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords