15m3 concrete mixer truck(Shacman chassis)
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Model: CLY5315GJB | |
Overall size (mm) | 10865 (L)*2500(W)*3990 (H) |
Tank body dimension(mm) | 5790*2300 |
Wheel base (mm) | 1800+3200+1350 |
Tread f/r (mm) | 1939/1850 |
Max. Speed (km/h) | 88 |
Chassis | |
Manufacturer | Shacman |
Model | SX5315GJBJT326 |
Steering system | Integral power steering |
Transmission | Manual |
Brake system | Dual circuit air-pressure braking system |
High pressure oil pump | |
Hydraulic motor | |
Reducer | PMB8sp |
Water supply system | Water supply by air pressure (450L water tank), homemade sprinkler. |
Air-condition | Shacman special air condition |
Engine | |
Model | WP12.375N |
Max. Power (hp) | 375 |
Engine type | Water cooling, 4 strokes, with exhaust brake, direct-injection, supercharge inter-cooler |
Fuel type | Diesel oil |
Tank body parameter | |
Feeding speed | More than or equal to 3m3/min |
Unloading speed | More than or equal to 2m3/min |
Discharge residue rate |
- Q: How many layers of steel wire tyres are used in concrete mixers
- 1200R20 R: represents a wire or a meridian 20: a hierarchy.
- Q: What is the normal speed in the transportation of the concrete mixer
- 1 to 3 RPM for transportation Normal 0 -- 6 is all right
- Q: The concrete mixer transporter is running continuously for no more than one hour
- The concrete mixer transporter is running for no more than 8 hours. Concrete mixing is divided into two kinds: artificial mixing and mechanical stirring Manual stirring search When stirring, try to be quick, stirring time from adding water, should meet the following rules in general: The volume of the mixture is 4 ~ 5min (minute) under 30L. The volume of the mixture is 30L - 50L at 5-9min The volume of the mixture is 51L - 75L at 9 ~ 12min After mixing, it is required to do the slump measurement or the specimen forming according to the test requirement. The total operation must be completed in 30min from the beginning of the addition of water.Mechanical agitation First, it is the first batch, which is to make the ripper first, so as not to affect the mixing ratio of the mix. Start the mixer, blender, in turn, to join the gravel, sand and cement, stir evenly, add the water slowly again, all charging time not more than 2 min, water after all to join, to continue mixing 2 min.
- Q: s the collapse of four concrete mixer trucks
- Do you mean the concrete can be transported by the concrete mixer? If that's the case, then I say clearly, no, it's a problem that the slump is put in and out of the car. The average slump is 100 to 120mm, and it is better not to transport the concrete transporter, and the best way to do it is to search for it.
- Q: Is a tanker and a mixer a thing
- Usually a concrete mixer is called a tanker But the tanker also has a concrete factory that transports the bulk cement, and USES the long can to drag the engine
- Q: What are the three main parts of the concrete mixer car
- The speed reducer, the pump radiator, is to make the mixing tank turn
- Q: Does it affect the ease of mixing too long?
- Are now using concrete products, easy to control the quality, intensity can be measured, can also add additive, etc., only their own building the in-situ mixing, transportation for a long time will affect the workability, so the project will adopt water mud and water reducing agent, etc.
- Q: What is the driving license for a concrete mixer truck?
- B2, you can do it directly. But it must be 21 years old and must be taught in permanent residence. The temporary residence is limited to the C series. The tuition fee for Beijing is 2,800 to 3100.
- Q: What can be done to remove the concrete from the concrete mixer truck
- It consists mainly of agitator and auxiliary supporting parts. Mixing drum of concrete loading container, it is made from high quality wear-resistant steel sheet, in order to be able to automatic loading and unloading of concrete, the lining welding spiral blade with special shape. When the concrete moves in the direction of the blades, it is mixed and stirred in the process of increasing and turning. In the process of feeding and transportation, the mixing cylinder is turning, the concrete is moving in the blade, and the mixing cylinder is turned and the concrete is removed out of the blade. The rotation of the mixer is guaranteed by the hydraulic actuator. The load is 3-6 cubic meters. Of commonly used concrete mixer truck passed by the car engine power output shaft to drive hydraulic pump, and driven by hydraulic motor with high pressure oil push the mixing barrel, loading capacity for 9 ~ 12 cubic are driven by automotive auxiliary diesel engine driven hydraulic pump hydraulic motor. The blades are the main parts of the mixing plant, and the damage or severe wear and tear can cause the concrete to be mixed. In addition, if the design is unreasonable, the concrete will be isolated.
- Q: What is the difference between a concrete mixer and a tanker?
- Concrete mixers are also called concrete mixers, and they are called concrete transporters, which are actually a kind of thing What you said may be loaded tanker powder material tank car, is see that pull a big jar of cars on the road, is not only a transportation of concrete so strict said that contains both relations with is included
Send your message to us
15m3 concrete mixer truck(Shacman chassis)
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords