900T Launching Gantry for Railway Bridge
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product description:
The 450-1000t different series Launching Gantry for Railway Bridge designed and manufactured by CNBM that can meet the requirements of erecting 24m,32m,and 40m span, fitting for both single and double girder. CNBM, we possess professional technical team with talents and abundant experiences in LAUNCHING GANTRY design based on the project drawing and actual working situation.
Introducing one model of CNBM 900T loading capacity LAUNCHING GANTRY:
Items | Parameter |
Rated lifting capacity (t) | 900T |
Erection span (m) | 20/24/32 |
Erection curve (m) | >=900 |
Adaptive longitudinal slope | 3% |
Erection mode | Single span simple support erection |
Perforation mode | Self simple shift through hole |
Beam lifting mode | four-point hoisting and three-point balancing |
Technical features of CNBM 900t Launching Gantry for Railway Bridge:
1: Construction safety, high efficiency
2:The two crane carriages use four-point hoisting method and three-point balancing method to ensure the balance of the beam during hoisting
3:Frequency conversion control is adopted in front crane and beam conveyer, which effectively ensures synchronization.
4: Pier top and box girder do not need auxiliary embedded parts, the construction is convenient and highly efficiency.
Installation process:
- Q:Without machinery?
- you know the drill. sit ups. crunches. stuff like that.
- Q:It seems additive layer manufacturing comes in laser to metal format,if so, acquring just one of these machines (although I realize at a ridiculously high price) covers all the functionalities of many variations of CNC machines. (like mills, lathes, routers etc, of which I assume there are limitations on angular production)Will this not cut the learning curve and rapid prototyping time significantly?Or is there limitations in these type of rapid prototyping machines as well do you think?I just think, learning and using many different machines these days on manufacturing is quickly becoming obsolete. What do you think? Is CNC still a must?
- CNC is still needed for some things. If I need a part that must be made of very hard and strong alloy tool steel then you cannot make one on the 3D printer. However there are many parts that can be made on the printer instead of a CNC mill.
- Q:Can you use mechanical oil instead of engineering gear oil?
- Mechanical oil is now called "full loss system oil", due to many types of machinery and equipment, the role is also different, so the variety of lubricating oil is also required. The most commonly used, representative lubricants are available:
- Q:Its for a Geography Flyer on Arable farmingAll info will be gladly received Thank-you
- Machinery to plant, fertilize and harvest crops.
- Q:being my mind will be wasted in lala land.....with god
- Hi Cowbell, Simple!!! I don't know how to Drive Heavy Machinery..In Fact it Scares The Hell Out Of Me!!! Your Friend, poppy1
- Q:Wong Industries is depreciating the value of its machinery over a thirty-year life. Its original value was $1,000,000 and it is assumed to have a scrap value of $100,000. After 20 years, it is decided that the machinery still has another 20 years of life but it will then be worth nothing. Find a piecewise linear function that describes the broken-straight-line depreciation that the company is using.Please explain how you came up with your answer! Thanks
- Since it originally had a lifespan of 30 years, it will lose $900,000 in 30 years, or $30,000 per year. V(t)=1,000,000 -30000t for the first 20 years. It's lost $600,000 in value and still is worth $400,000, but this will all go away after another 20 years or $20,000 per year... V(t)=400,000-20,000t for t between 20 and 40 years. I'll leave it to you to format this correctly :)
- Q:what is swiss automatic machinery?
- is it a computer controlled machine that produces chocolate??
- Q:A 20kw,200V shunt generator is operated at rated load. if the driving engine is developing 30bhp (break horse power), determine the iron and friction losses.Answer is IFL=1039W. Thanks a lot.
- brake horse power of an engine is the actual amount of horse power an engine can put out. Using 745.5 watts as a horse power, the engine will supply the equivalent of 30 times 745.7 watts at 30 brake horse power. This is 22,371watts. The generator is supplying 20 Kw or 20,000 watts. The difference in the engine output and the generator output is 22,371 minus 20,000 or 2.371 watts. I don't see how the answer is 1039 watts, if my calculations are correct. Perhaps someone else will have the answer you seek. I may be missing something in your question.
- Q:I am trying to decide what i want to settle in and do for a career. I would really like to become a heavy machine operator for road contruction and such. What are the requirements to get into this kinda work and where is a good place to start? I don't have any other contruction experience, i have painted houses and installed satellite for years.
- This is a very good occupation. Many current heavy machine operators were trained on the job. They got this training because they first worked in construction for years, and knew the right people to send them to school. Without a good recommendation from a construction crew leader, or from your union, it will be hard to get this specialized training. You have to prove yourself as being trustworthy, responsible, and able to do complicated problem solving.
- Q:What companies design equipment or machinery that make or customize large industrial metal piping?
- Three okorder /
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
900T Launching Gantry for Railway Bridge
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords