• 600W/1000Wh Portable Solar Power Station - AC100 System 1
  • 600W/1000Wh Portable Solar Power Station - AC100 System 2
  • 600W/1000Wh Portable Solar Power Station - AC100 System 3
  • 600W/1000Wh Portable Solar Power Station - AC100 System 4
  • 600W/1000Wh Portable Solar Power Station - AC100 System 5
  • 600W/1000Wh Portable Solar Power Station - AC100 System 6
600W/1000Wh Portable Solar Power Station - AC100

600W/1000Wh Portable Solar Power Station - AC100

Ref Price:
get latest price
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
5 watt
Supply Capability:
1000 watt/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

AC100 is a HUGE CAPACITY Eco-friendly portable power station with battery capacity of 1000Wh.
Top-Brand LG Li-ion Polymer battery cell, 67568mAh/14.8V (equivalent to 270270mAh 3.7V)).
600W pure sine wave output, PD Type-C Quick Charge (Max.45W).
12V Car Cigarette Lighter, Emergency Lighting and SOS and Two ways of recharging (Solar/AC).

  • Double protections on both BMS and charger

  • Pure Sine Wave inverter, more friendly for electric applicances

  • Up-market Aluminum casing, better heat dissipation performance

  • One-piece handle for super texture

  • Built in MPPT solar controller, high efficiency

  • Multiple DC output ports, support charging different devices simultaneously

  • LED lighting and SOS functions

  • Double AC outpot socket of 600W strong power

  • 1000Wh High Capcity, long lasting standy

Description

The AC100 is a high capacity solar generator, with 1,000 Watt-Hour (WH) of emergency battery, and a load capacity of 600 watts. What this means is that you can charge any device under 600 Watts, like a mini fridge, a TV, a drone, car fridge, laptop, lights, or a phone.

It has a built in pure sine wave converter which means you can safely use AC power, and plug your electronics directly into the generator using a normal AC outlet.

In terms of the expected life cycle of the battery, PowerOak use automobile-level 3C high rate battery cells that are rated for over 2,000 cycles. This means it has a much longer life cycle to similar power banks of this size – most of our competitors are only rated at 500 cycles.

In terms of quality of the battery, there is a built in battery management system (BMS) with overcharge, overcurrent, overtemperature, overvoltage, overheating and other protection, which means it will do none of the above!

Technical Specification

Capacity1000Wh
Rated Output Power600W
Wireless Charging
USB-C Output45W x 1 (PD3.0)
Peak Power1000W
Pure Sine Wave InverterYes
Cell ChemistryLifePO4, Up to 2500+ Charge Cycles
Dimensions390 x 183 x 313 mm
Net Weight15kg
LED LightingYes
Max Input Power100W
Solar Input16V-40V 170W (max)
Car ChargeN/A
Operating Environment-4~104 F (-20~40 C)
Warranty24 months


Q:We are a manufacturer of intelligent switching equipment manufacturers to bid in the power grid to say what is the first access to what the Department
2 please hold valid company documents to the trade and Industry Bureau for consultation!
Q:No concentrator can be copied directly
There are two types of remote meter reading devices in electric power generation: one is low voltage set, called concentrator, the other is called terminal. The concentrator role is the number of meter data, first by the carrier or 485 communication way to collect the equipment, and then through the cable (optical fiber) or wireless network (cdma/gprs) transmitted to the main station.
Q:The problem of electric power equipment withstand voltageWhy does the pressure decrease when the altitude is high? The air is thin, is not easy to breakdown (vacuum breakdown is not very low atmospheric pressure)
Although the degree of vacuum is higher than that of the low altitude, the relationship between the insulation strength and the degree of vacuum, especially from the atmosphere to the beginning of the high vacuum. Insulation strength is high - low - high change process
Q:Large engineering construction (such as buildings, factories, institutions) distribution room of the power equipment as required? What's the difference? For example, some requirements never power, and some to eliminate harmonics to improve power quality, the more detailed the better the program
Construction of electricity, then it is necessary to look at the site to enter the electricity equipment, under normal circumstances, with 380, 220V power is enough
Q:What is the power plant
Are you going to apply for technical workers or Gang Gang ah, technology is the design of scientific research work what, workers do more
Q:All I know is a generator, a transformer. I also want to fully understand the power system related to the equipment, from power generation to end users (enterprises, factories, they will design the equipment, production equipment is not to say, but they will be transferred to the electricity, in use is the processing equipment, such as transformer, I only know this involved) equipment, detailed list, thank you ah
Primary equipment is:The power plant and substation, generator transformer (step-up / step-down transformer), busbar, circuit breaker, isolating switch, current transformer, voltage transformer, insulator, reactor, lightning protection equipment (arrester, lightning), grounding device, electric energy metering.Business side: step-down transformer, circuit breaker, isolating switch, current transformer, voltage transformer, insulator, lightning protection and grounding device, the internal power supply generator, reactive power compensation cabinet, electric energy metering,
Q:How to solve the short circuit of emergency communication equipment
, a number of amateur radio enthusiasts, radio license, the application of their own call sign plate, usually just play the role of decoration,
Q:In order to obtain the qualification test of power equipment, the company needs to have a hard condition
The provincial electricity supervisor application; can only apply for five (10KV and below) or level Four (35KV and below) qualification, the first level of qualification can only apply for the first four to rise
Q:What is the amount of equipment used? Higher profits? Do you have any power generation companies in China?
Two equipment: all kinds of protective devices, automation devices and systems, including communications equipment, computer equipment, etc.; monitoring equipment: computer, industrial television and related equipment; fire equipment;......
Q:What are the relevant national standards for power equipment?
The standard is very thin do not know what you want to give you some of the specific power of the main reference

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords