• 5 Ton Cotton Gripper for 17 Ton Front End Chinese Wheel Loader System 1
  • 5 Ton Cotton Gripper for 17 Ton Front End Chinese Wheel Loader System 2
5 Ton Cotton Gripper for 17 Ton Front End Chinese Wheel Loader

5 Ton Cotton Gripper for 17 Ton Front End Chinese Wheel Loader

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description

We are an professional manufacturer for excavator and wheel loader,has about 1000 employees,with the annual production of 10000 units excavator and 5000units loaders,and sales turnover RMB 2 billion.
The details configurations is as following:
* Chinese Classical Compact Integrated Transmission
* Power-shift, Planetary Gearbox, 4-element Converter
* Steering system is priority than Hydraulic
* Load sensing full hyraulic steering system
* 4-Caliper dry type brake, easy for maintenance
* Chinese Most popular Engine, Fuel Economy. Stage-II


specification;


The machine is especially adapted to the working conditions of aggregate, earthmoving, coal.

 

The shoveling work efficiency ranks top in the industy. 

 

ZL20 series loader is Beston  latest wheel loader of high efficiency with more than 6  years’ experience. 

 

The performance, efficiency, structural strength, service life, daily maintenance and operation condition are upgraded all round.

 

All series products adopt superstrong structure, especially for the heavyload work condition. 

 

ZL20  features the super large operation weight, long machine body, and strong strength and high efficiency, leading in the industry.


5 Ton Cotton Gripper for 17 Ton Front End Chinese Wheel Loader

5 Ton Cotton Gripper for 17 Ton Front End Chinese Wheel Loader

5 Ton Cotton Gripper for 17 Ton Front End Chinese Wheel Loader

5 Ton Cotton Gripper for 17 Ton Front End Chinese Wheel Loader5 Ton Cotton Gripper for 17 Ton Front End Chinese Wheel Loader

FAQ:

1.How about the shipment?

1. The loader machine load one 40HQ container.

2. The loader disassemble into 3 parts, major machine, bucket and cabin.

3. Before shipment, we have done the rust-proof and antiseptic treatment.


2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.


3. What Can we Do For You?                                                                 

1. During the period of 12 months or 2000 working hours warranty, Chaogong factory are responsible for maintenance and replacement of spare parts.

2. We attend the machinery exhibition in your country and please contact us when we are with you at that time and solve the problem you have.

3. For the sole agents, we will go with senior engineer to your country and offer the technical service. 

Q:What is the capacity of the 'bucket' or 'backhoe' of a large construction excavator for commercial buildings? What is the capacity of a dump truck that takes the payload from such an excavator? I'm trying to figure out how many dump truck trips and how many scoops of earth it will take to excavate a 40m x 20 m x 4 m hole, for an apartment building construction site.
well that stuff is pretty impressive, but try cubic yds or meters etc, it might help simplify it.
Q:Construction units excavator access, what materials should be submitted to the supervision unit?
Approach of excavator construction units, mainly to 2 aspects of the material inspection supervision unit. First, the excavator's factory pass and regular inspection certificate; two is the excavator driver qualification certificate.Excavator factory certification and qualified regular inspection documents include: license of special equipment safety supervision and management departments under the State Council, together with the card design documents and the requirements of the safety technical code product quality certificate, instructions for installment and maintenance, supervision and inspection certificate etc. This paper; operation procedures and related safety regulations; emergency response plans for accidents.Excavator driver qualification certificate issued by including in the road when the traffic police department of the driver's license or the corresponding inspection trailer of the motor vehicle registration certificate, driving license and driver's license; in the construction work is the special equipment safety supervision department examination qualified, obtains the national unified format certificate of special operations personnel.
Q:it is an excavator is it a good scope
The first number, the 8, is the magnification of your scope: 8-power. The 32 should be diameter of the scope tube itself in millimeters. And the 50 should be the diameter of the outer lens, 50 millimeters. The larger the lense the more light-gathering ability your scope will have. H
Q:the post are very rustic almost like a tree in half do they have to have concrete around like normal fencing because the posts are morticed for the rails i have a 3 ton excavator with a small bucket any advice from an expert would be highly appreciated
Cheap foreign labor? We never put concrete in our posts, but the ground's pretty hard here.
Q:Like articles about keeping healthy at work, or relating to your employer, or conflict with your employees always seem to assume people work in offices. So do most articles about management. There are a lot of people who don't work in offices. Excavator operators, hairdressers, shop managers, drywallers, construction workers, mining engineers, auto mechanics, machinists, millwrights, linemen, pilots, and golf course superintendents don't work in offices or they may have a desk, but don't really work there. These people are not necessarily unskilled. Many of them are well-trained, well-paid, and highly skilled.
I think you make a great point, Cybele! :)
Q:Ask you, great God, excavator, fight wild, is the main Q, vice W, or the main Q, vice e!!!?!???
The main w Kiyono fast, the main Q for arrestChasing the answerAlthough not played, but I think it should be the main W, deputy Q, e point
Q:I'm looking for a bucket attachment for a caterpillar excavator....its some sort of backside attachment thats 6-8inches and is capable of cutting metal....does anyone know the name of a certain attachment or any links?? i wasnt having any luck on the cat website it was all buckets. thanks!
Are you looking for a shear? Or sissors?
Q:I would like to know where to find any information on how to start and run a construction equipment rental business. I would like to rent things such as backhoes, bulldozers, excavators etc. I am curious about many things such as financing and the overall all scope of the business and how to start and run it succesfully.
Go to the link below and in the search, type in 'equipment rental'. They have model plans that you can use for your business. They will either be free or of reasonable cost.
Q:I'm an engineer. I was employed at a rather large company that manufactures heavy duty off road vehicles, (Wheel Loaders and Excavators and such). Recently, I've lost my job because the quot;higher upsquot; in my company decided to cut costs. They hired an engineer from India to replace me at a fraction of the cost of my wage. I'm middle class and when I see these people with six figure incomes it makes me question their true worth? They will argue that it's actually positive for our the company and our ecomony, but as I sit here typing this, (unemployed), I wonder....who are the ones benefitting? I am unemployed. I don't build bulldozers any longer but they are still being built. These bulldozers clear the land for the house that I can no longer afford. The carpenter, plumber, electrician, etc. don't have a job because the house was never built. They don't have to buy tools anymore either. The trucks that deliver those tools will be parked. I wish I could type more, but you get the point!
The loss of jobs, the outsourcing of jobs, the continued attack on pension plans wellness plans could properly be laid at he ft of the marriage of your elected congress individual huge enterprise. as long as congress is on the take from company u . s . of america AND the american people shop putting those persons back into place of work the shortcoming of our familiar of living will proceed. If we initiate throwing those mendacity funds suckers out of place of work, you would be surprised how briskly this difficulty is corrected. besides the reality that a share people can experience we are above this fray faster or later this is going to contain influence them.
Q:Should I use carpet or excavator
carpet or paper towel use both, but sometimes they can get caught on the carpet to i thing u should use paper towel. oh and also don't use tile.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords